  • Alamin kung BAKIT MAHALAGA ang mga ito para sa isang SAFE na Tahanan! | EARTHWORKS AND FOUNDATIONS #mannelearningacademy #homebuddies #budolisreal #renovation #sharingiscaring #homebuddiesph
    Visit and follow our facebook page for more educational content: / mannelearningacademy
    All photos/music are reserved to the owner/s or copyright holders. If you are the owner or copyright holder, please contact me to claim your ownership or removal of such to this video.
    Other related contents:
    Beam Splicing Details
    • BEAM REBAR SPLICING DE...
    Ano ba ang pundasyon ng isang SAFE na bahay? • Alamin kung BAKIT MAHA...
    Self-check for earthquake safety of concrete hollow block (CHB) houses in the Philippines:
    • Self-check for earthqu...
    Construction Learning Series #5: Matibay ba ang bahay mo? Beam Construction (Part 1: Introduction) • Construction Learning ...
    Construction Learning Series #6: Tips para sa matibay na bahay / Safe ba tayo? (Part 2 Beam Details) • Construction Learning ...
    Construction Learning Series #7: Lindol nung Xmas Safe ka ba? Alamin ang dapat sa matibay na bahay • Construction Learning ...
    Link for Table 409.3.1.1 Table of Minimum Depth of Non-Prestressed Beams (from NSCP): drive.google.com/file/d/1tlce...
    Keep safe everyone.

ความคิดเห็น • 22

  • @paulmichaelrobles9150
    @paulmichaelrobles9150 2 ปีที่แล้ว +1

    Sir maraming Salamat po sa inyung naiambag na kaalaman sa larangan ng footing at klase ng Lupa ... Maraming Salamat pong muli Tatay " Lakay " Balangay ng NPJN Brgy. Kaypian Chapter SJDM Lalawigan ng Bulacan God Bless more on blessing to come take care your self and good health.....Tatay Lakay...

  • @cesarcacayan6916
    @cesarcacayan6916 2 ปีที่แล้ว +4

    Very educational ang information na pinipresenta mo sa mga technicality ng pagdedesign ng foundation. Ang kaalaman na ito ang gingamit ng civil/structural designers. Hindi ito ginagawa ng contractor. Kaya sa mga kontractor hindi maaaring mag decision na baguhing sa jobsite dahil sa differing site condition. Ipaalam sa designer kaagad kung may pagbabago, bago isagawa.

    • @ManneLearningAcademy
      @ManneLearningAcademy  2 ปีที่แล้ว

      Tama po kayo Sir. For educational purposes po ang presentation natin. God bless po.

  • @jeddahyoloyalagdlr6113
    @jeddahyoloyalagdlr6113 2 ปีที่แล้ว +1

    Thanks for sharing Sir

  • @armiezuniega1380
    @armiezuniega1380 2 ปีที่แล้ว +1

    nkakabilib poh sir..galing salamat po sa kaalaman.

  • @gnidnoeled786
    @gnidnoeled786 3 หลายเดือนก่อน +1

    Saan po nakuha ang SBC na 70 kN/ m2? Ang nasa soil investigation
    80 at 73 sa depth na 2 m.

  • @jesseexplosion
    @jesseexplosion 2 ปีที่แล้ว +1

    Ask ko lang po, saan galing yung 15 degrees kung yung angle sa report is 29 deg?

  • @mamabelle8965
    @mamabelle8965 2 ปีที่แล้ว +2

    paano nyo po nkuha yung data nyo s rankine formula..at d po b base yung data nyo s boring test? kc wala po similar figure n galing s boring test ...paki guide po..

  • @boringdesign_ph
    @boringdesign_ph หลายเดือนก่อน

    bakit po sa NBCP 1.4m ang minimum foundation ng 2 Storey house, tapos sa NSCP 450mm lang po? hindi po ba masyodng mababaw yun Sir?

  • @boy-br2tr
    @boy-br2tr ปีที่แล้ว

    License Civil Engineer po ba kayo Sir?

  • @anabelizamanga5800
    @anabelizamanga5800 2 ปีที่แล้ว +1

    Sir ask quh lng po pwede po bang mag lagay ng another tie beam s 2 patong n chb.. bale tie beam next 2 patong n chb and tie beam uli... slamat po

    • @ManneLearningAcademy
      @ManneLearningAcademy  2 ปีที่แล้ว

      pwde naman kung may ibang purpose. kung meron na kasing tie beam sa ilalim magastos at di advisable lalo na at 2 patong na chb lang ang pagitan.

  • @joselitocancino1922
    @joselitocancino1922 2 ปีที่แล้ว +1

    Tanung lng po uli engr. Nag pagawa po ako ng 3story with roof po s structural k s engr makkuha din po b nya khit hnd n ako soil test?kc ung pinsa k s city second floor lng muna with roof deck..

    • @ManneLearningAcademy
      @ManneLearningAcademy  2 ปีที่แล้ว +1

      Kung sa inyo po ang bahay mas mainam na may soil test po para po safe ang design. Kung meron naman pong reference ang structural engineer ninyo, maididesign niya po iyon. Pero para safe dapat may soil analysis lalo na po ang three storey building. Required din po yun ng building official.

    • @joselitocancino1922
      @joselitocancino1922 2 ปีที่แล้ว

      @@ManneLearningAcademy salmat bpo engr.

  • @joselitocancino1922
    @joselitocancino1922 2 ปีที่แล้ว +1

    Engr tanong lng po ung gnwa po s akin 600 groun level po tpos 1.5meter s level ng kalsada po..ok po b un?3story with rooftop po hnd n ako nag pasoiltes ok lng po b un sir?

    • @ManneLearningAcademy
      @ManneLearningAcademy  2 ปีที่แล้ว

      Kung ang nag design po ay engineer okay po yan sir. Kung 3 storey naman required po ang soil test para masiguro na tama ang design sa pundasyon.

  • @robertrodriguez5012
    @robertrodriguez5012 2 ปีที่แล้ว +1

    dapat may example problem ka hindi puro salita lng

  • @OroEla
    @OroEla 2 ปีที่แล้ว +1

    Pag hindi naman talaga sa construction ang background mo mahirap intindihin, pero madali lang pagka kahit konting idea lang.

    • @ManneLearningAcademy
      @ManneLearningAcademy  2 ปีที่แล้ว

      Tama maam. Kaya di talaga lahat sa engineering o construction pwede i-DIY.

  • @oilegor718
    @oilegor718 ปีที่แล้ว

    Sir ano ang minimum depth allowed ng foundation kung di na masunod ang lalim sa plano dahil di na kinayang tibagin ng jack hammer ang matitigas na bato sa ilalim?

    • @ManneLearningAcademy
      @ManneLearningAcademy  ปีที่แล้ว

      I would suggest 500mm. minimum maibaon yung pundasyon. kung ang kapal ng footing is 300mm, may 200mm pa siya na covering. Pero syempre mas maganda kung tatanungin mo yung structural designer mo para sigurado.