Superb Series Sir Plz make more videos on this At least 5 ...All Questions are Good, and Mostly These Questions are Asked in Interviews... But one more thing Sir , Plz Add Some Parameters in your Answers(for 660mw) ... Thank you So Much Sir.. 🙏
Sir I have a career oriented question...I work as a C&I shift engineer in 135x4 mw unit...& I have just got offer letter from a 25x2 MW unit with 50% hike.. should I switch ?
1)First thing which organisation where you are going I mean if it is more reputed than present organization. 2) Location - if it is located at better location that will provide better medical and schooling for future perspective. 3) If you are going to take better position. These are my personal opinion discussion is your.
Dear sir Good afternoon Sir if the 600MW LP turbine# 2 last stage blade will be removed from shrouds at both side all 46 blade then after what would be change in turbine critical speed...? and other thing else.
Ok, HP evacuation actually the main purpose of this valve is to vent out HP Turbine steam into the condenser in case of Turbine tripped consequently prevent Turbine overspeed because of trapped steam.
Sir very nice video thanks. Salute to you
Excellant video sir
Sir, kindly make video on your experience based interview questions & answers.
Very nice 🎉
What will happen if all lp heaters are out of service.what are the possible situation may arise due to this.please explain sir
Sir we are desperately waiting for your latest question & answer session video. When will it be uploaded?
Bahut badiya sir please explanation
Sir GE.
If the one cw pump tripped at full load then what will be taken action for unit normalization. Please explain sir
Actually, I want to explain in that live, I will explain it in next live.
Sir explaination bahut practical or sahi hai
Thanks for watching
Sir turbine shaft का vibration x ,y position kis basis per सेट किया जाता है.
It is directional measurement both vibration probes are perpendicular to each other.
Very nice sir
Thanks for watching..
Superb Series Sir Plz make more videos on this At least 5 ...All Questions are Good, and Mostly These Questions are Asked in Interviews...
But one more thing Sir , Plz Add Some Parameters in your Answers(for 660mw) ... Thank you So Much Sir.. 🙏
Ok, this series started on your demand.
Very good video sir ji
Sir please explain Generator H2 and N2 pressure variation according to load.
sir we need a topic of various main runbacks in powerplant....
Ok
Sir I have a career oriented question...I work as a C&I shift engineer in 135x4 mw unit...& I have just got offer letter from a 25x2 MW unit with 50% hike.. should I switch ?
1)First thing which organisation where you are going I mean if it is more reputed than present organization.
2) Location - if it is located at better location that will provide better medical and schooling for future perspective.
3) If you are going to take better position.
These are my personal opinion discussion is your.
Dear sir
Good afternoon
Sir if the 600MW LP turbine# 2 last stage blade will be removed from shrouds at both side all 46 blade then after what would be change in turbine critical speed...? and other thing else.
Removed or damaged?
Sir turbine 600 me BHEL evaluation valve ka function kya hota hai...
Are you asking Turbine stress Evaluation?
@@kpatelbla sorry sir.. i am asking about turbine evacuation valve
Ok, HP evacuation actually the main purpose of this valve is to vent out HP Turbine steam into the condenser in case of Turbine tripped consequently prevent Turbine overspeed because of trapped steam.
👏👏🙏🙏
Sir primary water tank ka level High hone ka kya .. reason kya ho sakta hai sir 600 MW BHEL unit ka
Firstly flush level transmitter it could be malfunction, check for H2 cooler leakage but there are very few chances of second one.
Camera ko hi horizontal karea sir setting se
Ok, next time
Furnace pressure positive Kya karege sir please
Very nice sir