Etihad Stadium Expansion - 5th July 2024 - Manchester City FC - Latest progress update

แชร์
ฝัง
  • เผยแพร่เมื่อ 4 ก.ค. 2024
  • Latest Drone Footage
    Please do get in touch with any enquiries or requests for things you would like to see in my Videos
    Contact Details
    email : overviewcp@gmail.com
    Instagram : @cp_overview
    www.buymeacoffee.com/overviewcp8
    Euipment used :
    DJI Mini 3 pro Drone
    DJI Mavic 3 pro drone
    DJI Mic 2 Microphone
    DJI Osmo Pocket 2 Combo camera
    Panasonic HC-V180 90x Optical zoom camera
    CAA Operator and Flyer ID
    A2 C of C certified
    FPV UK Article 16
    Fully Insured

ความคิดเห็น • 42

  • @samnewton6479
    @samnewton6479 9 ชั่วโมงที่ผ่านมา +27

    I don’t understand how people were saying in the last video about it being slow, this is some of the fastest construction work I’ve ever seen

  • @karlos55555
    @karlos55555 7 ชั่วโมงที่ผ่านมา +2

    Very sad to see the gasometer gone now, it's been a Manchester landmark for over 130 years and during WW2 my Grandad was an anti aircraft gunner who protected the tower and local residents from the Luftwaffe. Thanks for the video.

  • @robfielding100
    @robfielding100 9 ชั่วโมงที่ผ่านมา +6

    And I thought my grandson’s Lego models were complicated 😳It is amazing to watch this and I’m really looking forward to sitting there😉

  • @184tosh
    @184tosh 9 ชั่วโมงที่ผ่านมา +2

    Can anyone explain to me why they want to expand the Emptyhad, when they rarely sell out, no matter how important the game is?

  • @kwandrum1575
    @kwandrum1575 9 ชั่วโมงที่ผ่านมา +8

    Thanks for the update. 👍🏼👍🏼

  • @KevinGorton-kx7bs
    @KevinGorton-kx7bs 18 ชั่วโมงที่ผ่านมา

    So the north stand existing roof was added after commonwealth games, so should be simple to remove as a section?

  • @antmark9159
    @antmark9159 7 ชั่วโมงที่ผ่านมา +2

    Thanks for the updates. The new stand structure framework has been built quickly!

  • @KevinGorton-kx7bs
    @KevinGorton-kx7bs 19 ชั่วโมงที่ผ่านมา

    Whens next vid?

  • @TheEyesofOwen
    @TheEyesofOwen 9 ชั่วโมงที่ผ่านมา +1

    I think the cables will be fixed to the circular metal work as a temporary measure which will allow the removal of the old fixing post. The circular metal work is not high enough for the new roof

  • @Istanbully23
    @Istanbully23 7 ชั่วโมงที่ผ่านมา

    I know you’ve explained it, but I still can’t get my head around these original cables ,if their staying in situ , won’t they be seen when sitting in new stand , you said they did the same with south stand expansion , can next time you fly , please could you zoom in on the south stand to see if we can see the old cables after they expanded the south stand please 🩵👊

  • @user-df5kr3ld4r
    @user-df5kr3ld4r 9 ชั่วโมงที่ผ่านมา +4

    What a club!!!

  • @Darren-kc3uu
    @Darren-kc3uu 9 ชั่วโมงที่ผ่านมา +1

    always great vids

  • @English_Dawn
    @English_Dawn 7 ชั่วโมงที่ผ่านมา +1

    Smooth flying!

  • @user-pd6ic2dn6y
    @user-pd6ic2dn6y 9 ชั่วโมงที่ผ่านมา +3

    👏👏👏👍👍👍♥️♥️♥️.