Reflective Foil Insulation Installation Instructions : Metal Roof

แชร์
ฝัง
  • เผยแพร่เมื่อ 12 ก.ย. 2011
  • RESIDENTIAL METAL ROOF
    To ensure good coverage, roll out your Reflective Foil Insulation starting from the top ridge, rolling down to the gutter, over the roof battens.
    The green outer anti-glare surface should be facing upwards.
    For maximum performance, ensure you have a 50 millimetre overlap into the gutter and that a nominal 40 millimetre sag between your battens is achieved
    If required, staple or tape the Reflective Foil Insulation to your battens to hold it in place until the roof sheeting is fixed.
    Fix the metal roof sheeting onto your battens as required
    In laying additional rolls, allow a 150 millimetre overlap at the Reflective Foil Insulation joins
    Alternatively, a smaller overlap of 50 millimetres can be used if you tape your joins
    End joins should be overlapped by 600 millimetres if not taped
  • แนวปฏิบัติและการใช้ชีวิต

ความคิดเห็น • 4

  • @dmaher2007
    @dmaher2007 12 ปีที่แล้ว +2

    hi, will this prevent condensation forming on the inside of a metal roof?

  • @rolandadams3153
    @rolandadams3153 6 ปีที่แล้ว

    get a roofing transporter it will help you out

  • @gogia2210
    @gogia2210 3 ปีที่แล้ว +2

    Totally unprofessional what about the sag