Engineering Work at Newton Aycliffe Lowering and Re-laying Track under bridge 21/07/13

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 พ.ย. 2024

ความคิดเห็น • 21

  • @colvinator1611
    @colvinator1611 ปีที่แล้ว

    Brilliant John. A great incite into the engineering of tracklaying. Thanks a lot.

  • @jameshennighan8193
    @jameshennighan8193 5 ปีที่แล้ว +5

    There is no 'safety infringement' as you call it. He is moving ahead of the machine laying the CWR onto the chairs. The rail is in no danger of whipping at the end as the machine arm has it gripped and is feeding it onto the sleepers. The rail is too heavy to whip loose from the feeding arm.....and if you watch the individual concerned you will see he is moving well ahead of the machine and the feeding arm. He is actually doing his job correctly.
    James Hennighan
    Yorkshire, England

  • @RailfreightWales
    @RailfreightWales 11 ปีที่แล้ว +6

    Another fantastic video, great coverage of the work.

  • @sirdavidoftor3413
    @sirdavidoftor3413 5 ปีที่แล้ว +1

    Back in my day, I would put pretzels on with a sledgehammer!, I would be inside, and my bunk mate would do the outside. Would do 1/2 a mile a day. Only had the speed swing as the only machine. We were replacing rail.

  • @WAVERLEYJOHN
    @WAVERLEYJOHN  ปีที่แล้ว

    Thanks for your comment

  • @colliecandle
    @colliecandle 5 ปีที่แล้ว +1

    Ah ! The smell and taste of all that granite stone dust ! Noiw THAT is what i would i say constitutes a 'hazard' - hard hats and flourescent clothing does zip for !

  • @frenchsteam7356
    @frenchsteam7356 7 ปีที่แล้ว +2

    thought this was Aycliffe curves until I realised it was the Bishop Auckland branch!

  • @sanjaygawali7717
    @sanjaygawali7717 4 ปีที่แล้ว

    Sleeper our track neya se desine karnakey jarurat hai taki gadi 200 par chale

  • @pierluiginistri8042
    @pierluiginistri8042 3 ปีที่แล้ว

    Sistemi del secolo passato per distribuire il ballast !

  • @kennethhudson8013
    @kennethhudson8013 6 ปีที่แล้ว +2

    Why don't we have concrete ties instead of wooden ties here in the US? Very impressive. We should have more railroads! Our infrastructure needs improvement on the East Coast. Especially the South.

    • @gravelydon7072
      @gravelydon7072 5 ปีที่แล้ว +1

      Where do you live? In Florida we have concrete ties running from Jacksonville to Miami on the FEC and part of the way on CSX/Amtrak/TriRail/SunRail. Reason we use wood is because it is cheap. FEC even has its own concrete tie plant. Switches often are laid on wood but more and more, they are being laid on concrete ties also.

    • @marriage197
      @marriage197 4 ปีที่แล้ว

      Pakistan Europe Middle East
      1⃣ *PERSONAL INFORMATION:*
      1: Religion Sect:
      2: Gender: Male or Female
      3: Marital Status Single Divorce khulah yafta Late:
      4: Name:
      5: Cast:
      6: Age:
      7: Height:
      8: Weight: kg
      2️⃣ *EDUCATION DETAILS PAKISTAN*
      1: Qualification:
      2: School:
      3: College:
      4: University:
      3️⃣ *EDUCATION EUROPE*
      1: Qualification:
      2: School:
      3: College:
      4: University:
      4️⃣ *EDUCATIONM* *MIDDLE EAST*
      1: Qualification:
      2: School:
      3: College:
      4: University:
      5️⃣ *JOB DETAIL:*
      1: First Job
      2: Current Job: _Government or Private_
      3: Future Plans:
      4: Out of country Middle East:
      5: Out of country Europe:
      6: Income:
      6️⃣ *BUSINESS DETAIL*
      1: First Business:
      2:. Current:
      3: Future Plans:
      4: income:
      7️⃣ *FAMILY DETAILS:*
      1: Father's Occupation:
      2: Mother's Occupation:
      3: Brothers:
      4: Brother Married:
      5: Sisters
      6: Sister Married:
      8️⃣ *PROPERTY DETAILS:*
      1: Home Own Or Rent:
      2: Size:
      3: Location:
      4: Agriculture Land:
      5:. Location:
      6: Commercial:
      7:. Farm House:
      9️⃣ *ADDRESS:* *National Country City*
      1: Pakistan Current City:
      2: Home City Location:
      3: Middle East:
      5: Middle East Home City Location:
      6: Europe:
      7: Europe Home City Location:
      1️⃣0️⃣ *YOUR REQUIREMENTS:*
      1: Age Limit:
      2: Height:
      3: City:
      4: Caste:
      5: Qualification:
      03070145909
      03334351553
      00923070145909
      00923334351553
      السلام علیکم* ضرورت رشتہِ
      پلیز آپ اوپر دیے گئے طریقے سے تفصیلات فراہم کریں تاکہ فیملیز سٹیٹس میچ کرنے میں آسانی اور رشتہ جلدی ہو تفصیلات صرف واٹس پر فراہم کریں شکریہ

    • @marriage197
      @marriage197 4 ปีที่แล้ว

      Pakistan Europe Middle East
      1⃣ *PERSONAL INFORMATION:*
      1: Religion Sect:
      2: Gender: Male or Female
      3: Marital Status Single Divorce khulah yafta Late:
      4: Name:
      5: Cast:
      6: Age:
      7: Height:
      8: Weight: kg
      2️⃣ *EDUCATION DETAILS PAKISTAN*
      1: Qualification:
      2: School:
      3: College:
      4: University:
      3️⃣ *EDUCATION EUROPE*
      1: Qualification:
      2: School:
      3: College:
      4: University:
      4️⃣ *EDUCATIONM* *MIDDLE EAST*
      1: Qualification:
      2: School:
      3: College:
      4: University:
      5️⃣ *JOB DETAIL:*
      1: First Job
      2: Current Job: _Government or Private_
      3: Future Plans:
      4: Out of country Middle East:
      5: Out of country Europe:
      6: Income:
      6️⃣ *BUSINESS DETAIL*
      1: First Business:
      2:. Current:
      3: Future Plans:
      4: income:
      7️⃣ *FAMILY DETAILS:*
      1: Father's Occupation:
      2: Mother's Occupation:
      3: Brothers:
      4: Brother Married:
      5: Sisters
      6: Sister Married:
      8️⃣ *PROPERTY DETAILS:*
      1: Home Own Or Rent:
      2: Size:
      3: Location:
      4: Agriculture Land:
      5:. Location:
      6: Commercial:
      7:. Farm House:
      9️⃣ *ADDRESS:* *National Country City*
      1: Pakistan Current City:
      2: Home City Location:
      3: Middle East:
      5: Middle East Home City Location:
      6: Europe:
      7: Europe Home City Location:
      1️⃣0️⃣ *YOUR REQUIREMENTS:*
      1: Age Limit:
      2: Height:
      3: City:
      4: Caste:
      5: Qualification:
      03070145909
      03334351553
      00923070145909
      00923334351553
      السلام علیکم* ضرورت رشتہِ
      پلیز آپ اوپر دیے گئے طریقے سے تفصیلات فراہم کریں تاکہ فیملیز سٹیٹس میچ کرنے میں آسانی اور رشتہ جلدی ہو تفصیلات صرف واٹس پر فراہم کریں شکریہ

  • @russouk
    @russouk 5 ปีที่แล้ว +2

    Like a jigsaw puzzle,already marked out....beats hammering spikes in eh... how long before someone invents machine that lays it all down in one.

    • @gravelydon7072
      @gravelydon7072 5 ปีที่แล้ว +1

      There are machines that do just about all of it.Lays ties on graded roadbed, moves rails into position, anchors the rails to the ties. Then they follow on with a ballast train that spreads the ballast. And then a tamper adjusts the track profile and tamps the ballast. Finally a ballast plow and sweeper cleans off the excess and shapes the sides of the ballast. Doing the bucket dumps of the ballast is a waste of manpower where it could be done by a couple people and remote control ballast hoppers.

  • @wattsmilly01
    @wattsmilly01 6 ปีที่แล้ว

    how much for the rc compactors i like the set

  • @suzanarosemeiredebritobrit3004
    @suzanarosemeiredebritobrit3004 6 ปีที่แล้ว

    O investimento é muito grande. Aqui no Brasil em SP a linha Sorocabana a Santos está desativada depois de tanto investimento.

  • @russouk
    @russouk 5 ปีที่แล้ว

    14.07 sounds like farting contest lol

  • @nlo114
    @nlo114 7 ปีที่แล้ว +9

    Serious safety infringement at 4:00 There is no way that man should be walking on the sleepers in the 4ft. If that length of rail suddenly released at the end and whipped across, he would be killed or seriously injured.

    • @MB_Videos1
      @MB_Videos1 6 ปีที่แล้ว +1

      yes as an industry professional that rail is very unpredictable so you want to stay far out from it in the clear.

  • @Kj-zn9nr
    @Kj-zn9nr 5 ปีที่แล้ว

    자갈에서 먼지날리는건 처음봄