MRT Test Sunday Miscellany (+ new C151B trainset)

แชร์
ฝัง
  • เผยแพร่เมื่อ 16 ต.ค. 2024

ความคิดเห็น • 30

  • @STANSAT10N
    @STANSAT10N 7 ปีที่แล้ว +4

    There must have been a typo in the STARISV2 because it said NS17 CC1 Bishan

  • @kayjaylaw
    @kayjaylaw 7 ปีที่แล้ว +2

    You shoot definitely shoot more... I like how you take snippets of videos from different locations instead of just one long boring video while standing at the same place 👍 Makes it much more interesting to watch than a train passing through a dark tunnel for 10, 20 minutes

    • @JoeyFoo
      @JoeyFoo  7 ปีที่แล้ว

      Thanks! Was inspired by videos others have made, such as those by Luftschlange (th-cam.com/users/luftschlange82). You might like those too.

    • @kayjaylaw
      @kayjaylaw 7 ปีที่แล้ว

      Joey Foo Joey Foo Yes! I have saw (many of) the videos on that channel as well and really liked the way they were shot. Unfortunately I couldn't find similar videos on our own MRT and Luftschlange doesn't have videos of Singapore's trains either. So I was really excited when I saw the way your video was shot at the beginning and it didn't dissapoint!

    • @BaySean
      @BaySean 7 ปีที่แล้ว

      C151B only is on North South Line CURRENTLY.. That is only on Sundays.
      I guess it will be on East West Line ONLY when Tuas West extension opens 2nd quarter of this year. Right?

    • @SGGVideos-sb4uz
      @SGGVideos-sb4uz 7 ปีที่แล้ว +1

      Bay Sean No Until The full run in the CBTC

  • @alex-vd4vm
    @alex-vd4vm 6 ปีที่แล้ว

    The STARIS V2 got typo liao. Supposed to be NS17 CC15 Bishan,not NS17 CC1 Bishan. Just pointing out. Hehe

    • @JoeyFoo
      @JoeyFoo  6 ปีที่แล้ว

      The other comments have pointed that out already. :3

    • @D_Shade
      @D_Shade 6 ปีที่แล้ว

      Ok

  • @TransportationONLY
    @TransportationONLY 7 ปีที่แล้ว

    Nice vid I like it

    • @TransportationONLY
      @TransportationONLY 7 ปีที่แล้ว

      Btw what time was this vid shot at?

    • @JoeyFoo
      @JoeyFoo  7 ปีที่แล้ว

      It was at night, but I'm not sure about the specific time because my camera's clock was incorrect. It was recorded over a span of about 3 hours or more I believe.

    • @TransportationONLY
      @TransportationONLY 7 ปีที่แล้ว

      Joey Foo ouhh

  • @danpang504
    @danpang504 7 ปีที่แล้ว

    New CGA Line Testing On May 2017 with 1 c151 1 c751b 1 c151a and 4 c151bs

  • @brandonlee4960
    @brandonlee4960 7 ปีที่แล้ว +1

    Where is C151B now??????

    • @STANSAT10N
      @STANSAT10N 7 ปีที่แล้ว

      brandon lee most of them are at Tuas Depot 3 has been seen at Bishan Depot i have not seen any where else

    • @SGrailadventure2004
      @SGrailadventure2004 5 ปีที่แล้ว

      Since August 2017, Majority Of C151B Trains Is On The North South Line.

  • @adksyafiq33
    @adksyafiq33 7 ปีที่แล้ว

    the lcd screen say cc1

  • @whacked7
    @whacked7 7 ปีที่แล้ว

    isn't it CC15 Bishan?

    • @JoeyFoo
      @JoeyFoo  7 ปีที่แล้ว

      Rz_19 Appears to be a typo

    • @elainemai2539
      @elainemai2539 4 ปีที่แล้ว

      😶

  • @cherirose7577
    @cherirose7577 7 ปีที่แล้ว

    The CCL conpletely destroyed Bishan MRT

  • @smrtc151productions4
    @smrtc151productions4 3 ปีที่แล้ว

    3:34 what

  • @danpang504
    @danpang504 7 ปีที่แล้ว

    Next Time Will Be Sunday Testing on the Changi Airport Line.

  • @justinsze2092
    @justinsze2092 6 ปีที่แล้ว

    This train the announcement is very loud

    • @justinsze2092
      @justinsze2092 6 ปีที่แล้ว

      It is louder then the old signaling system on the SMRT North South Line Mrt

    • @D_Shade
      @D_Shade 6 ปีที่แล้ว

      Ok