Current Transformer Knee Point Test || Hindi
ฝัง
- เผยแพร่เมื่อ 29 ก.ย. 2024
- Hello friends,
Welcome to testing series on Current Transformer.
In today's video we will learn about Knee Point Test of current Transformer.
Let us know if you have any queries in comments below.
Keep watching 👍
here is some links of video
current transformer basic
• Current Transformer Wo...
CT Polarity test
• Current Transformer Po...
CT Ratio test
• Current Transformer Ra...
current transformer wiring part-1
• Current Transformer Wo...
current transformer wiring part-2
• Current transformer wi...
also, you will get other equipment testing in the link provided below.
like, battery, transformer,
• Testing of Equipments
How to reading panel wiring drawing part-1 CT and PT wiring
• How to read Panel Draw...
Sir your videos is very helpful for Maintenance Engineers, keep on giving this type of Videos. Thank you Very much Sir
Sir but Vk/2 ka matlab 475 volt me 60 mA current aana chaiye as per name plate???
Plz clarify
Sir at 950V current should 60mA but in the test you got 16.8mA. is it ok ?
it is good....
as the knee point is more than 950V...
Voltage transformer ka kya jarurat hai... Direct veriac se connection dene se kya saubidha hoga krupaya bataye
you need 2000V for higher voltage CT.
thanks for watching...
Sir please make a video for
How to make/ disign/Calculat
200Amp - 400Amp
Primary injection test set
p͓̽r͓̽o͓̽m͓̽o͓̽s͓̽m͓̽ 🙂
Here at VK current is 16.8mA instead of 60mA...what is this?
❤
Will the CT not saturate if we inject more than 950V on the secondary ?
generally not...
if you test the ct for knee point.. then you will get the point of saturation.
Sir good
But as per knee point voltage recommend when we increase 10% voltage at last point then 1.5 times current increase
eg if voltage 100 then current 50 mA
And knee point 110 volt then current 75 mA
It's as per my knowledge
But u explain very good👍
Sir, what ever you understand is the theory of the knee point voltage,
the design of the equipment is prepare with more safety margin and accuracy margine, so that the equipment couldn't fail in any test.
there the results shows, are totaly prectical results. where the knee point is mentioned by manufacturer and we are testing the equipment to check the mentioned results are meets the actual test which is site "acceptance test"
Why we connect vt rather than directly applie to ct through veriac
Sir test k sath ager value kitna aaye according IEC ya pgcil rule k anusaran to acha hoga
Sir, substation ke earthing connection ka bhee video banaiye
Thanks sir , sabhi equipment ka sabhi test ka video banaiye jo kee erection commissioning me helpful ho
Testing of Substation Equipments: th-cam.com/play/PLohZ_Ucl1PNpWcwScyH2STs-vNvyOJt5N.html
Kindly provide the drawing/nameplate also in comment box
Current Transformer (CT) Nameplate Details th-cam.com/video/eznFythQz3c/w-d-xo.html
Thank you sir 👍 and Knee point test should be checked once how many days sir ?
Knee point is done only during commissioning of CT, no need to do in routine testing.
Thank you so much sir
Thanks Sir 🙏🙏🙏🙏🙏🙏
🙏 Thank you Sir ji 🙏
Thank u sir
Sir please discuss on cvt testing
Or wavetrep
Good information 👍
Super
🤝