  • How to calculate shuttering quantity.
    In this video I have explained about the calculation of shuttering materials using thumbrule methods on flat slab area, and calculation for quantities as ply boards, wooden battens, me plates, me props, me channels, nails, shuttering oils etc.
    #factualcivilengineering
    #shutteringmatetials
    #formworkcalculation
    Construction Bills for Major Value Projects - Construction Billing Procedure
    • Video
    I would request you also you can watch the following additional link for better explanation & under standing of this video :
    How to Make Construction RA Bills - Initial Procedure and Basic of Construction Bills
    • How to Make Constructi...
    Secured Adavance vs. Material Advance in Construction Contracts & Billing
    • Secured Advance vs. Ma...
    Mobilisation Advance Process with Bank Guarantee Detail in terms of CPWD GCC14
    • Mobilisation Advance P...
    Mobilization Advance Recovery Formula for Construction Billing
    • Mobilization Advance R...
    Important Billing Clause & Their Concepts for Interview
    • Important Construction...
    Cement Reconciliation as per CPWD DSR
    • Cement Reconciliation ...
    Steel Reconciliation Method For Billing
    • Reinforcement Steel Re...

ความคิดเห็น • 119

  • @FactualCivilEngineering
    @FactualCivilEngineering  5 ปีที่แล้ว +10

    Very important for every site engineer, please comment if you have any query / questions for this topic. Thanks

    • @mysteriousman875
      @mysteriousman875 4 ปีที่แล้ว

      You considered only 10 kg binding wire for 360 sqm. Please tell if there is some standard thumb rule because the binding wire will be more it's my experience

    • @MayankSarkar
      @MayankSarkar 4 ปีที่แล้ว

      Residentail ki steel kitna lagega??? general rule..

    • @akashmalakar7735
      @akashmalakar7735 3 ปีที่แล้ว

      Many thanks ❤️❤️

    • @rohitgarg9345
      @rohitgarg9345 3 ปีที่แล้ว

      Sir ply ki quantity apne sirf beam or uski side ke liye nikala 60 ply slab ke liye ??

    • @infamousfreak5914
      @infamousfreak5914 2 ปีที่แล้ว

      Sir ye Plyboard required A and B kaise calculation kr skte hai ..mtlab 108m2 aur 54 m2 ko?

  • @kmrao06
    @kmrao06 3 ปีที่แล้ว +3

    Fantastic explanation. I recommend all Civil Engineering graduates to watch this video and gain practical knowledge.

  • @manish25983
    @manish25983 4 ปีที่แล้ว +7

    Really men you are doing great job and I would like to appreciate your knowledge and skills👍.

  • @kundanchaurasiya9207
    @kundanchaurasiya9207 2 ปีที่แล้ว +1

    Kamaal kardiya sir aapne. Maja aagaya !!! Dil se thank you aapko 🙌

  • @Deepakkumar-812
    @Deepakkumar-812 5 ปีที่แล้ว +1

    Sir, apko Bahut achi knowledge h, Bahut detail main bataya h aapne

  • @jagritchandna520
    @jagritchandna520 5 ปีที่แล้ว +4

    Awesome sir, really helpful for all site engineer, concepts are very good. Thanks a lot for making this video

  • @sudhirdeshpande6075
    @sudhirdeshpande6075 5 ปีที่แล้ว +4

    Excellent Please Put all calculations in Excel Formate which will HELP you fast and 100% Perfect calculation...

  • @Avishwakarma0531ShreeHari
    @Avishwakarma0531ShreeHari 3 ปีที่แล้ว +1

    Today.. I was thinking about this topic and I got it...
    Thank you sir

  • @Paraman63
    @Paraman63 3 ปีที่แล้ว

    wonderful sir. very informative and educative for builder like us who are in field with only practical knowledge and no applied knowledge in calculation. keep posting. thank you sir.

  • @pankajparab9278
    @pankajparab9278 ปีที่แล้ว

    Really great explanation

  • @Shamufa1
    @Shamufa1 4 ปีที่แล้ว +1

    Really appreciated the video awesome full of technical calculation.

  • @prakashmalakar9038
    @prakashmalakar9038 5 ปีที่แล้ว +5

    Video is very informatic and useful.Thanks for your kind efforts. But sir I have a suggestion or you can say a request, if you do some practical information also bcoz all your videos are only theoretical which needs to understand by watching 2 or 3 times. So if you do some on site videos of shuttering or steel calculation that will be highly appreciated by your subscribers. Anyways many many thanks for sharing your education with us.

  • @lovefirstvoice8768
    @lovefirstvoice8768 5 ปีที่แล้ว

    Amazing, video is long but concepts are very clear and help full

  • @AD13D
    @AD13D 6 หลายเดือนก่อน

    Exillent video...

  • @wpresident1
    @wpresident1 4 ปีที่แล้ว +4

    162/3=54. 162 is the area for beams. area for slab is 360 sqm. 360/3=120 no ply .wrong calculation

  • @trilokimaurya6709
    @trilokimaurya6709 3 ปีที่แล้ว

    Sir aap ka samdhhane ka tarika to bahot achha hai lekin ek chij aur add kare to aur banificial hoga use hone Wale all materials ka pictures ke sath batayenge to aur achha rahega sir

  • @civilgyanandknowledge1258
    @civilgyanandknowledge1258 2 ปีที่แล้ว

    Sir,Share best knowledge for civil site construction work.

  • @ajayprajapati7220
    @ajayprajapati7220 4 ปีที่แล้ว

    Thnx for video and yar apki writing kitni mst haai😍

  • @mohdadeel
    @mohdadeel 3 ปีที่แล้ว

    Bahut Umda

  • @sanjayborge2240
    @sanjayborge2240 5 ปีที่แล้ว

    thank you very much sir,I could not understand the last topic - that is very important also - i.e. coefficient of ....... and according to bye law .......,but any way once again thans for sharing this information.regards.

  • @shamstabrez1090
    @shamstabrez1090 2 ปีที่แล้ว

    Sir make more on quality take off of different material on thumb rule basis

  • @arunmohan6196
    @arunmohan6196 4 ปีที่แล้ว

    Awesome very much useful video

  • @trivijaytiwari6214
    @trivijaytiwari6214 4 ปีที่แล้ว

    Very nice video sir aur BHI bnayiye sir 🙏🙏

  • @vishalpatil9662
    @vishalpatil9662 4 ปีที่แล้ว

    U r great sir
    Very very nice thanks

  • @AbhishekGupta-uy5fm
    @AbhishekGupta-uy5fm 5 ปีที่แล้ว +1

    I think, aap staircase shuttering ko bahut ache see samjha sakte ho, pls make a video on staircase

  • @vishwamohansingh161
    @vishwamohansingh161 5 ปีที่แล้ว +1

    Very informative, thank you sir

  • @abidkhan-ty4sy
    @abidkhan-ty4sy 2 ปีที่แล้ว

    Sir plz prepare a videos of how to calculate the built-up area and carpet area from auto cad ?

  • @Dineshkumar-gz7vh
    @Dineshkumar-gz7vh ปีที่แล้ว

    sir make one video for circular retaining wall shuttering material calculation

  • @Imtiyaz__Saifi
    @Imtiyaz__Saifi 5 ปีที่แล้ว

    Wahh bhai maza aa gaya

  • @hemanthkumar-yd6uo
    @hemanthkumar-yd6uo 5 ปีที่แล้ว +1

    You are giving very great information.. Thnx nd pls do more videos..

  • @miteshparmar2015
    @miteshparmar2015 2 ปีที่แล้ว

    Narayan Bless 🙏 You

  • @vikramsuryawanshi2836
    @vikramsuryawanshi2836 5 ปีที่แล้ว

    Sir very good explanation.... Thanks 👍👍👍👍👍👍

  • @sanjaymasale6167
    @sanjaymasale6167 4 ปีที่แล้ว +1

    Thank you so much....useful..but sir if number of beams more then what percentage should be taken?

  • @rohit_g_n
    @rohit_g_n ปีที่แล้ว

    in case of no MS plate for slab. Plyboard required will be total area+30%area beams side+10%wastage=172nos plywood not 60nos

  • @satendrasingh3926
    @satendrasingh3926 5 ปีที่แล้ว +2

    Great sir, pls explain all cofficients

  • @jayasubramaniam889
    @jayasubramaniam889 4 ปีที่แล้ว

    Very useful video

  • @amanatali-wh9cu
    @amanatali-wh9cu 4 ปีที่แล้ว

    Very informative 👍👍👍

  • @sunilgond6306
    @sunilgond6306 4 ปีที่แล้ว

    Good

  • @shaikhabibullah5213
    @shaikhabibullah5213 4 ปีที่แล้ว

    Sir your explanation is very nice and understandable.but I have some dought,from where did you taken 30% & 15% calculation please explain this is very useful for GET

  • @kyawmintun2820
    @kyawmintun2820 4 ปีที่แล้ว

    very useful sir,
    one thing i want to ask is at beam bottom propts,resident is 230mm and commercial is 300mm what is that?

  • @arshadgholam2799
    @arshadgholam2799 5 ปีที่แล้ว

    I think Acrowspans are missed & not mentioned for slab shuttering.
    Secondly, stirrup heads are used and fixed with props for channels to run.

  • @vrutikpatel6808
    @vrutikpatel6808 10 หลายเดือนก่อน

    For slab plate Beam bottom - ( minus) karna chahiye tha, sir apne A+B minus ker diya

  • @mayanksharma9007
    @mayanksharma9007 5 ปีที่แล้ว +2

    Sir..more n more....Apreciative. Video class.......but Sir ek confusion hai...ki....steel ke liye per Ton pr (1000 kg) pr kitne kg binding wire assume karte hai....

  • @devendrasharma3031
    @devendrasharma3031 5 ปีที่แล้ว

    We all want a video on staircase shuttering, please upload

  • @ibrarahmad5822
    @ibrarahmad5822 4 ปีที่แล้ว

    This so interesting video

  • @mohammadshad5026
    @mohammadshad5026 3 ปีที่แล้ว +1

    Sir i have doubt that you are missing flat slab area for wooden ply because you calculated only on 162 sqm which is only beam side and bottom area than where is slab area means 360 sqm , pls clear it sir

  • @modassariqbal306
    @modassariqbal306 3 ปีที่แล้ว

    Sir column making me kaun kaun sa Material lagega sir kya size k ply cut kre g sir us p video banaye sir... please.....site p column k shuttering lagwana ho 1 m by 1m ka column ho to kaise lag wate hai shuttering sir site p

  • @yashgupta6826
    @yashgupta6826 5 ปีที่แล้ว +1

    Thank You So Much Sir.........

  • @sahoosudarsan5189
    @sahoosudarsan5189 2 ปีที่แล้ว

    Tqqqqqq sir

  • @vinodr.prasad9069
    @vinodr.prasad9069 5 ปีที่แล้ว

    very good sir thank you

  • @umeshmor
    @umeshmor 5 ปีที่แล้ว

    Hello, sir
    please make a video on only labour rate work.
    how can I determine that rate for every kind of work with help of CPWD DSR

  • @snehajadhav8555
    @snehajadhav8555 5 ปีที่แล้ว +3

    Hellow sir, plz can i know wat thumb rule ur using means watever ur taking 30%, 15% and all is that mentioned in specific is code ??? If yes where it is mentioned and is the process is also mentioned??

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 ปีที่แล้ว +3

      Its all calculation based on experience, which is for use of general form works

  • @ahesanallikhan6738
    @ahesanallikhan6738 5 ปีที่แล้ว +1

    Sir ek question... Ye Jo 72cum concrete aya.. Ye Including column Ya only slab and beam..

  • @amitabhjaiswal9365
    @amitabhjaiswal9365 5 ปีที่แล้ว

    Mast video sir, thaxx a lot

  • @ashishrawat1629
    @ashishrawat1629 5 ปีที่แล้ว

    Sir in case of beam you have assume 30 meter beam 3 number of beam. And 12 meter beam 5 number of beam

  • @ramdeepkumar7616
    @ramdeepkumar7616 5 ปีที่แล้ว

    Excellent

  • @sandeepnehra13-85
    @sandeepnehra13-85 4 ปีที่แล้ว

    V. Good

  • @shahbazsiddiqui2000
    @shahbazsiddiqui2000 4 ปีที่แล้ว

    When u have consider plate area then u don't need to add 15℅ for beam bottom bcz u have already consider in plate area..

  • @faridparvez8707
    @faridparvez8707 4 ปีที่แล้ว

    Sir please suggest me on this --
    For my shuttering works , I use 3ft x 2ft steel boards. pine wooden planks and battens and bamboo as props. now, pine wood's rate here in assam is rs. 500/cft ( which means rs. 41.67/sqft for 1" thick plank ). Now which has more re-usability -- pine or shuttering plywood . If plywood, then which brand has more re-usability . PLEASE SUGGEST
    1 MORE THING... PLEASE SUGGEST A BETTER ALTERNATIVE TO PINE BATTENS -- ROLLED STEEL CHANNELS OR ANY ALUMINIUM BATTENS( IF AVAILABLE), OR ANY OTHER IDEA. BUT SIR, IT SHOULD BE ADJUSTABLE(PINE CANT BE USED FOR MORE THAN 4-5 TIMES) . ACROW SPANS ARE TOO HEAVY AND COSTLY FOR SMALL PROJECTS WHICH I DO.

  • @saikiran-fk3kt
    @saikiran-fk3kt 4 ปีที่แล้ว

    Sir for plywood centring we can do cement palstering to slab?

  • @ramanand3736
    @ramanand3736 3 ปีที่แล้ว

    Don't use if you have Drawing otherwise you will be fired. Because it can be used for Estimate only if you don't have detailed drawing.

  • @amaramarsingh7249
    @amaramarsingh7249 ปีที่แล้ว

    प्लाई का शटरिंग बीम स्लैब का स्क्वायर मीटर में बताइए हिंदी मैं

  • @Mixxeddtube
    @Mixxeddtube 3 ปีที่แล้ว

    Does that last thumb rule contains beam quantity also? or only slab, shear wall and column? in that 1080 sqm?

  • @abhaypratapsingh6080
    @abhaypratapsingh6080 4 ปีที่แล้ว +1

    Total slab area is = 486 sqm but you take 108 sqm why.......

  • @ManojKumar-ev4ud
    @ManojKumar-ev4ud 3 ปีที่แล้ว

    Bhaiya aap 1 baat hme batao ki jab aapne flat area ka quantity nikala ply board ka toh usme bottom to aa hi jayega na . Fir v aapne beam bottom ka naikala.
    Beam side board ka nikala o thik hai lekin agar slab ko hm outer to outer le lenge toh bottom toh usi me aa jayega na fir ply ke liye bottom ko kyo nikalana hai

    • @ManojKumar-ev4ud
      @ManojKumar-ev4ud 3 ปีที่แล้ว

      Agar kuchhh galat bole hain hm toh aap batana plz....

  • @jawedakhtar7682
    @jawedakhtar7682 4 ปีที่แล้ว +2

    What is the thickness of plywood used for shuttering??

  • @Aasifkhan-op2vl
    @Aasifkhan-op2vl 3 ปีที่แล้ว

    4X3 wale Batten nhi lagengay kya isme sir

  • @jigarpatel1727
    @jigarpatel1727 5 ปีที่แล้ว

    👍👍

  • @mehullongre9759
    @mehullongre9759 ปีที่แล้ว

    Are bhai isme sirf beam bottom side ka hi area diya hai flat slab ka shuttering quantity kon nikalega

  • @naanu0073
    @naanu0073 4 ปีที่แล้ว

    Nails ka wait 24 kg or 48 kg? Please confirm me.

  • @vibhorjain4622
    @vibhorjain4622 5 ปีที่แล้ว

    How have you taken 8nos wooden batten per Plyboard ?

  • @samdarshu
    @samdarshu 3 ปีที่แล้ว +1

    Area total 468 Sq. Metre tha... Fir add 108 hi kyu kiyaa...

  • @searvindkumar6681
    @searvindkumar6681 5 ปีที่แล้ว

    I love u bro

  • @EngSalamaAlsalama
    @EngSalamaAlsalama 3 ปีที่แล้ว

    SIR DO YOU THINK 60 PLYWOOD ENOUGH FOR 360M2

  • @allaboutcivil9563
    @allaboutcivil9563 4 ปีที่แล้ว

    Sir when are going to start paid classes I have to join

  • @manjeets236
    @manjeets236 5 ปีที่แล้ว +1

    Achha bataya aapne. Lekin kuchh samajh me nahin aaya aap aur achha explain kar sakte the.

  • @rajnishchoudhary1909
    @rajnishchoudhary1909 4 ปีที่แล้ว

    Sir
    Is this topic available on website?

  • @premchandsharma3935
    @premchandsharma3935 4 ปีที่แล้ว

    फ्लैट की चौड़ाई 31 है और लंबाई 37 फिट इसमें कितने कितने फिट पर रखने हैं भीम खड़े करने हैं डिस्टेंस बताएं

  • @selvasiyan
    @selvasiyan 5 ปีที่แล้ว

    How to calculate binding wire?
    explain pls

    • @AmarjeetSingh-yb6ot
      @AmarjeetSingh-yb6ot 4 ปีที่แล้ว

      I observe on my site 1ton steel = 7.5kg binding wire

  • @sandeepsharma-vx5eb
    @sandeepsharma-vx5eb 4 ปีที่แล้ว

    It's need creations

  • @pratapghale5456
    @pratapghale5456 5 ปีที่แล้ว

    Structural related video upload brow

  • @mohameddasthagir6106
    @mohameddasthagir6106 10 หลายเดือนก่อน

    Channel calculation not understanding

  • @A10gyan
    @A10gyan 2 ปีที่แล้ว

    Wooden batten kaha milta hai bhai

  • @patriotuma4646
    @patriotuma4646 4 ปีที่แล้ว

    Aapne ms channel kaise calculate Kiya ,kyoki ms channel to props me lagega iska MATLAB jitna props utna ms channel lekin aapka calculation galat hai

  • @ibrarahmad5822
    @ibrarahmad5822 4 ปีที่แล้ว

    Sir shuttering oil ka koi aur name haii

  • @vishwamohansingh161
    @vishwamohansingh161 5 ปีที่แล้ว

    Sir ply ka rate kya hota h 12mm k liye

    • @FactualCivilEngineering
      @FactualCivilEngineering  5 ปีที่แล้ว

      12mm ply for shuttering works @ 40 - 45 /- sqft main Minta h Jisme 18% get extra h

    • @annuverma7052
      @annuverma7052 3 ปีที่แล้ว

      @@FactualCivilEngineering how to calculate when side n front view are given by client

  • @sadikkilledar8484
    @sadikkilledar8484 24 วันที่ผ่านมา

    230 mm aur 300 mm kuch samj nahi aays

  • @VinayKumar-jq5yd
    @VinayKumar-jq5yd 5 ปีที่แล้ว

    Nice videooo

  • @sandeepsharma-vx5eb
    @sandeepsharma-vx5eb 4 ปีที่แล้ว

    Sir apny glat kar dya ply nikalna mai

  • @zabeehshaikh4438
    @zabeehshaikh4438 5 ปีที่แล้ว +1

    nai samjha sir..fast hora bahot

  • @biswajitdebnath6860
    @biswajitdebnath6860 ปีที่แล้ว

    You didn't considered repitition.

  • @khajagazanfaroz3465
    @khajagazanfaroz3465 2 ปีที่แล้ว

    Video calrity is not good

  • @amanatali-wh9cu
    @amanatali-wh9cu 4 ปีที่แล้ว

    Very informative 👍👍👍

  • @amanatali-wh9cu
    @amanatali-wh9cu 4 ปีที่แล้ว

    Very informative 👍👍👍 ...