For PCC reqired materials are Cement, Stone aggregate, and Clean River Sand, to the required proportion as required. For RCC, Required materials are as above plus Reinforcement as per the design of the Structures.
Concrete mix supplied for RCC works such as column footings, vertical columns, Beams and floor and roof slabs through transit mixers. Or known as otherwise mobile mixers.
RCC is known as Reinforced Cement Concrete.
PCC is known as Plain Cement Concrete.
For PCC reqired materials are Cement, Stone aggregate, and Clean River Sand, to the required proportion as required.
For RCC, Required materials are as above plus Reinforcement as per the design of the Structures.
Concrete mix supplied for RCC works such as column footings, vertical columns, Beams and floor and roof slabs through transit mixers. Or known as otherwise mobile mixers.
Stone Block work with Solid blocks or Hollw blocks with cement mortor as per the required proportions.
Vertical structure (Piller)is known as Load bearing Columns. Horizontal structure which is supporting the Roof slab is known as Beams.
Plastering the walls with Cement Mortor of required proportions.
Cement Mortor is the mix of cement and sand to the required proportion.
Jay shree ram 🚩🕉🛕
Very nice coverage.Thank you bro.
Nice video🎉🎉❤❤
Post latest video new Pamban bridge
Beautiful update
Super
Tq❤
Super video
இந்தமாதம்கடேசி
பாராளுமன்றகட்டடம்மாதிரிஇல்லாமல்கலைஞரின்கட்டுமானங்கள்மாதிரிஉறுதியுடன்இருக்குமா
பாலம் பயணம் எப்போது. நண்பரே.
December 1st week
வேளைமுடிய1ஆண்டுஆகும்இதர்கும்வண்டிவருவதர்க்குசம்மந்தம்இல்லை