The supply line works quicker if you start with just one aircraft, this completes one circuit before it all kicks in. Also I put airport directly connect to the production plant I'm using thus cutting out the need for trucks
At this point I have airfields not airports. I thought that only airports could have additional runways added. Its either that or you are right about the time frame.
The supply line works quicker if you start with just one aircraft, this completes one circuit before it all kicks in. Also I put airport directly connect to the production plant I'm using thus cutting out the need for trucks
Let's see that HQ now!
Airports needs a second runway, but I don't think you can add those till a certain year.
At this point I have airfields not airports. I thought that only airports could have additional runways added. Its either that or you are right about the time frame.
It's 1980 for second runway, but I'm not sure about airfield second runways