ไม่สามารถเล่นวิดีโอนี้
ขออภัยในความไม่สะดวก

Bridging the Gap - The Great Central Railway Reunification

แชร์
ฝัง
  • เผยแพร่เมื่อ 11 ก.ค. 2024
  • Welcome back to my Great Central Railway Reunification series. We're picking up again at Loughborough station. In the last episode I had a look at the Great Central heritage railway and a look around the station. We had a ride behind a steam locomotive from Quorn too.
    Looking north from Loughborough Central station, the once through running lines now run into the railways main engine shed. This will be the first obstacle. Everything we will see in this video is part of bridging the gap section of the reunification. There are a number of engineering challenges - some of which have alreayd been dealt with. Straight after leaving the loco shed, the line crosses the Grand Union Canal. This bridge was renovated for double track in 2020.
    After crossing the canal we see a length of embankment, followed by a new viaduct before the line crosses Railway Terrace. This is where lots of the forthcoming work will be focussed. After railway terrace we can see the new bridge installed in 2018 crossing the 4 tracks of the Midland Mainline.
    After here, more missing embankment before a link line with the Midland railway.
    It is here we technically join the northern heritage railway - Great Central Railway Nottingham. The A60 bridge had a new deck in late 2022 and therefore is the newest bridge on GCR.
    Great Central Mainline was built as the London Extension of the Manchester, Sheffield and Lincolnshire railway. Opening in 1899, it was designed to be as straight as possible with as little gradient as possible. Speed was the aim and express trains travelled between London Marylebone, Leicester, Nottingham, Sheffield and Manchester. It was the last UK mainline to be built before HS1 over a century later. It thrived initially, however with a lack of upkeep, neglect and dwindling usage, it was mothballed during the great railway rationalisation of Dr Beeching in the 1960s - known as the Beeching Axe.
    #gcr #loughbrough #loughboro @GCRofficial
    Become a channel member - www.youtube.co...
    Buy me a coffee - ko-fi.com/wobb...
    Facebook - / wobbly.runner
    Instagram - / wobbly.runner

ความคิดเห็น • 86

  • @gbtrains
    @gbtrains 29 วันที่ผ่านมา +4

    Plenty of work to still do but if they can pull it off then this could be one of the best heritage railways around

  • @edmundcarew7235
    @edmundcarew7235 3 วันที่ผ่านมา

    Paul, another excellent video.
    In late 2022 I visited from Australia and travelled on this excellent heritage railway.
    I hope your series of videos encourages those who can afford to donate to the GCR either for the Reunification Project, or generally. It's a world class preserved railway.

  • @user-cn4rg2bs4p
    @user-cn4rg2bs4p หลายเดือนก่อน +17

    the team organising the reunification say that they are taking the shed down and be relocated. Caroline

    • @deathmisser85
      @deathmisser85 หลายเดือนก่อน +1

      I hoping they atcually extend the tracks to the tram tracks as then not only you have a space for a massive shed but also a station connecting to Nottingham itself via said tram tracks.

    • @moonshapedabsolution
      @moonshapedabsolution หลายเดือนก่อน +2

      Yeah they uploaded a video about it

    • @fenpikey
      @fenpikey หลายเดือนก่อน

      @@deathmisser85 I think it may be a long term goal going by what's on East Midlands Railway Trusts website.

  • @keithbutler2222
    @keithbutler2222 10 วันที่ผ่านมา +2

    Very well put together video. I know this railway well 🙂

  • @22whizzo56
    @22whizzo56 หลายเดือนก่อน +5

    Spot on mate, BR always destroyed infrastructure, bridges, tunnels, everything. Sold off land for roads, supermarkets, industrial estates anything to obliterate the railways. Considering that BR were/are in the business of carrying passengers & freight, makes you wonder why they always destroy everything?
    I used to work for the Permanent Way on BR, so what I'm telling you is the truth.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน +1

      👍 it is very puzzling. A very destructive approach.

  • @scottc1589
    @scottc1589 หลายเดือนก่อน +4

    Paul, It was really interesting and enjoyable to watch your "Members Only," "Behind the Scenes" video before watching this, as the pieces from the two different videos fall together watching this one. Cheers!

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน +1

      Glad you enjoyed them. I'll try and do more of the behind the scenes. I always intend to do them, but end up forgetting to capture any footage.

  • @nickbergquist6222
    @nickbergquist6222 หลายเดือนก่อน +5

    Enjoying this little mini-series a lot, thanks. If I remember rightly, the new single-track bridge over the Midland mainline is slightly further to the south-east than the original bridge to go round Preci-Spark's car-park. On the original alignment this was one of the fastest stretches of the London Extension, speeds being well into the 80mph region as trains left the Loughborough dip northwards to climb into the Stanford/Normanton hills. Talking of the new bridge, it's got graffiti already, I see! Stanford viaduct is plastered too. Makes one wonder what the concrete viaduct idea will look like months after completion, an absolute eyesore, no doubt.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน +1

      I thought exactly the same about the graffiti, Nick.
      Didnt take them long to tag the new stuff. It does seem to be a problem around that way.

    • @nickbergquist6222
      @nickbergquist6222 หลายเดือนก่อน +2

      @@WobblyRunner Well, as you know, it's not an eyesore/'beautiful artistic statement' (delete as applicable) restricted to Loughborough. Perhaps we should have stringent restrictions on spray-paint can sales as was once applied to tins of Evo-stik back when sniffing glue was the awful blight it was...

  • @kennethsimms1128
    @kennethsimms1128 หลายเดือนก่อน +4

    Thanks for another excellent informative video Paul. I'm very much looking forward to Part 3.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Glad you enjoyed it 👍🙂

  • @mikehindson-evans159
    @mikehindson-evans159 หลายเดือนก่อน +4

    A very useful update - thank you for your dedication.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      You're very welcome 👍

  • @chrischapman7514
    @chrischapman7514 หลายเดือนก่อน +2

    Brilliant again Paul be great when its all linked up some work to be done but will be well worth it.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Cheers Chris. Looking forward to what the next few years brings

  • @smithyhouses100
    @smithyhouses100 หลายเดือนก่อน +2

    Thanks for the update on reunification.Your report is so detailed and informative that I think yours is a better and more fully informed description than the actual report from the GCR. Great work.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      👍thank you.

  • @levelcrossing150
    @levelcrossing150 หลายเดือนก่อน +2

    Interesting video, nice to learn more about the reunification of the line. Many thanks.

  • @mikeuk4130
    @mikeuk4130 28 วันที่ผ่านมา +1

    I love this series of videos and look forward very much to the next one. It’s so good to see the bigger picture within the geographical and historical contexts. After watching your masterful videos, one can watch the Official GCR videos, which focus more on the financial and technical details and implications of this amazing project. If only BR/Railtrack/Network Rail and HMG worked with so much foresight and thoughtfulness.

    • @WobblyRunner
      @WobblyRunner  25 วันที่ผ่านมา

      Thanks very much Mike.

  • @Carolb66
    @Carolb66 หลายเดือนก่อน +3

    Nice one Paul, love blue brick bridges! ❤😊👍

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน +1

      Me too! Plenty more to come :)

  • @marybradley7791
    @marybradley7791 หลายเดือนก่อน +1

    Thanks for bringing us this series, it puts into context everything they are trying to do with this railway to see the route from the ground and above. It said on one of their videos that i watched that the railway shed was life expired and that they were going to demolish it and build a new one in a different location as at the moment like you said it is blocking the route of the reunified railway. This project seems to be steaming away at an amazing pace and i do not think it will be long before we see this reunification completed. It will be one of the best Heritage lines in the country when it is.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Thanks Mary. Great Stuff. I see they submitted planning applications last week for the viaduct too.

  • @danielholden-storey5107
    @danielholden-storey5107 หลายเดือนก่อน +7

    The British way of knocking down the infrastructure is almost unique to BR (as it were). In the USA lines no longer in use are left for the simple reason that another company may wish to reopen it so instead if having to deal with the nightmares of new structures on the trackbed such as at Tavistock North and the cost of demolition and re-siting these buildings, the line is ready to go. Perhaps desperation for cash from selling of the sites and the metal, in fact anything which would make moneyfor BR (and the Treasury) has added heavily in this country to the cost of re-opening closed lines.

    • @martinusher1
      @martinusher1 หลายเดือนก่อน +4

      I think its was deliberate policy to render routes useless judging by the way it was carried out -- not just on the old GCR route but all over the country. The savings from line closures and the relatively small amounts from most land sales are vastly overshadowed by the cost to rebuild the infrastructure where its been found necessary.

    • @user-vj6op6zi2n
      @user-vj6op6zi2n หลายเดือนก่อน +3

      ​@@martinusher1HS2 would have been viable if so many links hadn't been severed.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน +1

      You're too right. Added the extra complications of planning consent and red tape. And nimbyism whenever a railway is lobbied for reopening. So much red tape.

    • @kristinajendesen7111
      @kristinajendesen7111 29 วันที่ผ่านมา

      Part of it is because although disused, British Railways/British Rail/ Railtrack/Network Rail, were/are still responsible for the upkeep and keeping the infrastructure safe. So they were quite happy to demolish and get rid of the responsibility especially of the bridges and tunnels across the country. Awful lot of them to maintain for lines not used for many decades. Still sad to see 😢

  • @maestromanification
    @maestromanification หลายเดือนก่อน +2

    Another interesting video Paul, there's quite a lot of work to do to join the railways not to mention building a new depot

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน +1

      Cheers Russ. Looking forward to seeing the progress step by step.

  • @ceanothus_bluemoon
    @ceanothus_bluemoon หลายเดือนก่อน +1

    I keep looking at Google maps to see if there's anything new on there, but your drone footage was fantastic. Best views I've had of the whole area. Can't wait to see the building start. GCR said they'd be moving that shed to keep the original alignment. Watched all those vids of the canal, A60 and Midland bridges going in from 2020 onwards, when I discovered the former GCML by chance, and it captured my heart and imagination, as it has done for so many.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน +1

      There's something about the GCR as a whole. So much interest. I think the vastness of it. Glad you liked the drone footage :)

  • @jaybee1921
    @jaybee1921 หลายเดือนก่อน

    Hi, many thanks for sharing this informative video of an important reunification of an equally important line of route. Good to see it coming together.
    Take care,
    Jon B.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Thanks Jon. Take care.

  • @abloogywoogywoo
    @abloogywoogywoo หลายเดือนก่อน +2

    Its very exciting!

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน +1

      It's a great story to follow isnt it.

  • @daystatesniper01
    @daystatesniper01 หลายเดือนก่อน +1

    Another cracking video lads

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Cheers. Glad you enjoyed it.

  • @thoughtsonnarrowboatingwit3882
    @thoughtsonnarrowboatingwit3882 หลายเดือนก่อน

    The fact that I work on the railway on this patch, cruise the canal near this patch and the GCR is going that little bit more north, makes it even more exciting.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      👍 Great to be able to follow the progress.

  • @Michael43713
    @Michael43713 หลายเดือนก่อน +1

    Great work.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Thanks Michael!

  • @declanjoyce8640
    @declanjoyce8640 หลายเดือนก่อน +1

    Nice one Paul...

  • @seamusmcevoy2011
    @seamusmcevoy2011 หลายเดือนก่อน

    That was really informative, next time I'm at Loughborough competing I must get to those bridges for some photos. Part three sounds like it's where all the action starts🤣!!!!

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Haha yeah it all goes downhill from part 3 😊

  • @davidkane4614
    @davidkane4614 หลายเดือนก่อน +2

    All ways enjoy your content

  • @themackeler5011
    @themackeler5011 หลายเดือนก่อน +1

    Great video as normal

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Thank you 👍

  • @garthcox4307
    @garthcox4307 หลายเดือนก่อน +1

    My understanding is that the embankment was taken to provide the fill for the embankment on the north side for the link to the midland main line, in the 1970s i believe. That wasn't there originally and was added to allow continued access to the mod and gypsum sites. Previously it was accessed from north of Ruddington so it had to be connected at the southern end before the tracks through central nottingham could be lifted.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Ahhh interesting. That makes sense I suppose.

  • @AlanReynoldsBucklandJunction
    @AlanReynoldsBucklandJunction 28 วันที่ผ่านมา +1

    Great video but wrong Music sorry to say. I hope they join the two great preserved railways Regards Alan :o)

  • @DCS1967
    @DCS1967 หลายเดือนก่อน +1

    I’ve only just discovered your channel with the beginning of this series. An interesting couple of videos so far. I’ll have to check out your other videos too as I’ve always been interested in the GCR.
    One thing though, please correct the spelling of “separated” at the start of these videos!!

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Welcome!!
      Yep, the horror when you've published a video and spotted a spelling mistake. Too late to save the first 2 parts as I did them at the same time, but correct for parts 3 onwards. Hopefully it doesnt spoil the videos too much.

  • @chrismccartney8668
    @chrismccartney8668 หลายเดือนก่อน +1

    As a non railway buff I still fund it crazy in this day and age that anyone would close a major rail link that could be diversion or extra freight line as WCML is overloaded and Freight blocks it up.
    Although we do not have a Coal Industry there is a lot freight to move to/from channel tunnel..

    • @michaelmcnally2331
      @michaelmcnally2331 หลายเดือนก่อน +1

      1969 was 55 years ago so hardly current situation. They did not have a capacity issue back then.
      In the London Midland Region then had
      WCML
      Midland Mainline
      Great Central
      So 3 main lines however they didn’t need all 3 and being Midland Man then the LMR chief when faced with closing either the Midland Mainline or the GCR oddly enough chose to close the GCR and keep Midland Mainline

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      It sure would have come in handy these days wouldnt it. It's a shame that when they closed a lot of lines, they couldn't have left the structures in place or at least not built housing estates on the trackbed. It does duplicate quite a bit, but I always think about it when I'm forced to use the Midland Mainline anywhere, that they chose the wrong line to back in retrospect.

  • @thomaswebb7828
    @thomaswebb7828 21 วันที่ผ่านมา +1

    Great video! I'm currently living in East Leake and work in the business park next to the Nottingham GCR station. I keep wondering if once it's been unified, if I can get a commuter pass, it would be handy 😅

    • @WobblyRunner
      @WobblyRunner  19 วันที่ผ่านมา +1

      Haha that would be handy.
      What's the general feeling in the village of the railways extention?

    • @thomaswebb7828
      @thomaswebb7828 18 วันที่ผ่านมา

      @WobblyRunner Mostly positive as far as I'm aware. I know that the Rushcliffe Halt station would benefit from more tourism, so that would be good. My next door neighbour is right by tracks, and it'd be nice to see the steam trains go past the house but I can imagine a few other new build residents might not see it the same way!

  • @buffplums
    @buffplums หลายเดือนก่อน +1

    10:58 Gypsum… lol… makes me think … Gizzm 😂😂😂😂 British Gizzm 😂😂😂😂😂

  • @wideyxyz2271
    @wideyxyz2271 หลายเดือนก่อน +1

  • @buffplums
    @buffplums หลายเดือนก่อน +4

    Bridge strike already??? Honestly some of these truck drivers need to lose their licence

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Luckily they've installed the bar in front of the bridge to take the impact.

    • @alanfrost4661
      @alanfrost4661 หลายเดือนก่อน

      Probably cant read English

  • @jappedut9009
    @jappedut9009 หลายเดือนก่อน +1

    As far as I understand GCR south is double tracked and GCR north is single track , how will they cope with that ❓️

    • @nickdrew6863
      @nickdrew6863 หลายเดือนก่อน +1

      only double track as far as Rothley, single track to Leicester North

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Be interesting to see. I assume they'd have to put in a few passing loops. I know there's one at the golf station.

  • @stanley3647
    @stanley3647 หลายเดือนก่อน +1

    New viaduct (bridge) over MML must be higher than original one, because was plan to electrify this stretch od mainline to 2020.
    So, they build higher one, now line must be adjusted in height, to this new construction.
    And... MML electrification plan was scrapped by tories... Typical...

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      Haha I wonder if electrification would reach Loughborough. It is still creeping north though. Is it up to Market Harborough now?
      That bit of a climb out of Loughborough will make the engines work a bit more I suppose.

    • @stanley3647
      @stanley3647 หลายเดือนก่อน

      @@WobblyRunner I guess they only do electrification to Leicester.
      But we have new goverment and some things may change.
      But... It not make a sense for now to change this decision, because "high power diesel - electric" hybrid 810's are already build. And comming into service this Year.

  • @paulburton9386
    @paulburton9386 หลายเดือนก่อน

    I saw a video that mentioned the shed will be taken down or moved.

    • @WobblyRunner
      @WobblyRunner  หลายเดือนก่อน

      👍 I think I saw the same one just after I visited 😊

  • @buffplums
    @buffplums หลายเดือนก่อน

    10:58 Gypsum… lol… makes me think … Gizzm 😂😂😂😂 British Gizzm 😂😂😂😂😂