  • Training video on installing Sungrow Hybrid and Battery for CPD points.

ความคิดเห็น • 10

  • @hanial-shadadi9122
    @hanial-shadadi9122 27 วันที่ผ่านมา

    HOW MUCH THE COUPLING INDUCTANCE FOR THE SUNGROW GRID-TIED INVERTERS AS A PERCENTAGE OF THE BASE IMPEDANCE FOR EACH INVERTER IN GENERAL.

    • @sgauservicesupport
      @sgauservicesupport  26 วันที่ผ่านมา +1

      Sorry, but I do not have that information.

    • @hanial-shadadi9122
      @hanial-shadadi9122 26 วันที่ผ่านมา

      @sgauservicesupport
      Could u please find it for me , as I have a simulation for the grid tied inverters in a microgrid system .

    • @sgauservicesupport
      @sgauservicesupport  20 วันที่ผ่านมา

      @@hanial-shadadi9122 Sorry, we don't have that information

  • @alexandrumunteanu5152
    @alexandrumunteanu5152 หลายเดือนก่อน

    Hello! The whole house backup is applicable for SH8.0RT și SH6.0RT as well?

    • @sgauservicesupport
      @sgauservicesupport  หลายเดือนก่อน

      Whole house is available on the SH8.0RS, SH10RS, and the SH*T range. The SH*RT range have insufficient on grid range to do whole house.

    • @alexandrumunteanu5152
      @alexandrumunteanu5152 หลายเดือนก่อน

      Just to make sure, because my installer has a different opinion : if I install SH6.0RT I must separate the loads in essential (on backup port) and non-essential (on grid)? Thank you in advance for your assistance!

    • @sgauservicesupport
      @sgauservicesupport  หลายเดือนก่อน

      All backup circuits are "essential" circuits. Care must be taken to keep under the maximum output, and also if an outage happens at night, you may only have the reserve SOC of the battery until the PV comes back online. Refer to the standards in regards to the labelling and location requirements.

    • @alexandrumunteanu5152
      @alexandrumunteanu5152 หลายเดือนก่อน

      Thanks you so much for all answers. Still, I have one more, I hope you will have a minute to answer. What is not connected to backup port but to grid, will be feed by the battery at night if the battery power is sufficient and grid is working? I know what is not connected to the backup port won't have power if there's a power outage, but how it works if there's battery available and also grid? Will the battery provide power to all loads or just to the ones connected to backup port?

    • @SungrowTraining
      @SungrowTraining หลายเดือนก่อน

      @@alexandrumunteanu5152 Battery will supply power to everything on the consumer side of the energy meter while on grid