ขนาดวิดีโอ: 1280 X 720853 X 480640 X 360
แสดงแผงควบคุมโปรแกรมเล่น
เล่นอัตโนมัติ
เล่นใหม่
That 12ton shuttle car should be filled in less than 60 seconds, need to push that CM during sumping to at least 75% of drum diameter before starting shear-down cycle.
It's not shuttle car... It's Diesel powered ramcar...tq
@@venkyvenkatesh1101 same thing, shuttle means to shuttle between CM and the discharge point onto conveyor belt.
Air conditioner 😊
Whoever's running that miner isn't doing a good job He's slow getting coal down for the shuttle car loaded
I want watch more videos my brother am baby
Gdk 11 inc...
He can't find the face that conveyor should be pouring the coal
Maybe hes gone for a spell
coal chain empty
this cm operator doesnt know how really cut coal.........4min to half fill a shuttelecar????
That 12ton shuttle car should be filled in less than 60 seconds, need to push that CM during sumping to at least 75% of drum diameter before starting shear-down cycle.
It's not shuttle car... It's Diesel powered ramcar...tq
@@venkyvenkatesh1101 same thing, shuttle means to shuttle between CM and the discharge point onto conveyor belt.
Air conditioner 😊
Whoever's running that miner isn't doing a good job He's slow getting coal down for the shuttle car loaded
I want watch more videos my brother am baby
Gdk 11 inc...
He can't find the face that conveyor should be pouring the coal
Maybe hes gone for a spell
coal chain empty
this cm operator doesnt know how really cut coal.........4min to half fill a shuttelecar????