Trey McKinney talked about this idea for years... you could have: CM operator cutting a plunge (best time)... 2 Player SC operators racing to the CM and back to the Feeder for a plunge.. You could have bolter operators racing to bolt a plunge
Sir ji cm me kitan motor laga rahta hain or kitane kitane hp(kw) ka laga rahata hain or kitane voltage par work karta hain or collinge ka kay system hain
Bhavya Shekhawat to run supplies (bolts/chemicals/plates etc), to clean up roadways after bolting is completed, to move equipment such as cables, cable boats (if used - mainly in gate road development), DCB's, belt structure, pumps, stopping equipment, dusting equipment, emergency response equipment etc .......
9 roadways, 2x flanking returns with A/fans, 3x S/cs and 1 bolter working from # 1 roadway across to #9 work it for over 8yrs. If you have a email address can give more details
Hi Peter, where have you worked? I did 3.5 years at Aquila Mine, German Creek QLD Australia (1.6-1.8m seam Bord & Pillar).. And 6 years at Ensham Mine QLD as a deputy in Bord and Pillar. In my experience as an operator and Deputy, and with the success of both these mines in Australia, 2 SC's are always better than 3... unless the third is used only when changing sides of the belt road saving time on swapping the cars over (anchor points over the feeder).. We had tried 3 cars several times with very little success. This sequence is from right to left, and I would have to agree, not very good. It's always best to be able to do sequence 1 ahead of the roadway to allow for sequence 2 to be a breakoff before flitting to sequence 3.. This gives you the opportunity to hit two places at once.. This continues for Seq 3/4, 5/6, 7/8, and 9... you can add a stub at last cut through for 9, and then come back and do "bellouts" as we do at Ensham ✌🏼(you may already know all this)
एक्सप्लेन करने का डिजिटल तरीका बहुत अच्छा है
Thank you Sandeep
Very good layout and explanation sir....gives us more info for imagining
very useful. Thank you!
Great sir 🙌
Very nice explain..thanks sir..very very useful..for continuous miner study..
Which software are you using
very useful...please upload more..thank u.
Pl share and subscribe so we can get motivation to list more videoes
They need a video game that involves this would pay good money for a good coal mining game
Trey McKinney talked about this idea for years... you could have: CM operator cutting a plunge (best time)... 2 Player SC operators racing to the CM and back to the Feeder for a plunge.. You could have bolter operators racing to bolt a plunge
Very well explained. Thank you.
Thank you, pl like, share and subscribe to our videos
Super..........sir
thank you
plzz sir we want more videos,upload these videos are very helpfull to us...waiting for new videos
Sir ji cm me kitan motor laga rahta hain or kitane kitane hp(kw) ka laga rahata hain or kitane voltage par work karta hain or collinge ka kay system hain
nice explanation..thank you..
thank you, pl share and subscribe this channels
do you have more videos related to mining field ?
yes, i am going to upload soon
Excellent...plz upload more
Thank you, Pl like , share and subscribe this video
Sir kya aap mujhe iska full diagram de skte hain..kisi trh
How can I recreate this video?
I wanna make this type of application.
Nice
Thank you Rajan
What is the use of diesel operated load and dump machine
Bhavya Shekhawat to run supplies (bolts/chemicals/plates etc), to clean up roadways after bolting is completed, to move equipment such as cables, cable boats (if used - mainly in gate road development), DCB's, belt structure, pumps, stopping equipment, dusting equipment, emergency response equipment etc .......
How much do pillar mining machines cost in India ?? PLEASE SHARE MORE INFO.
Sorry sir I have no idea, if you have please share
Sir , mining engineering me hindi ki Kaun si book best hogi
It depends on subject
Did you eat food?
Superrr
Excellent but it is available only Hindi please explain in Telugu & english
Sir longwall me bare me difination bateye please sir
Thanx for the help !!!
Rohit Tiwary welcome
Main chiz,to bataya nhi jo ki fcc ya koi bhi mining exams me puchta hai..
Aur vdo banao
Sure I will . . . . .
Seen and worked a better sequences than this.
wow, share if you have some thing new and interesting
9 roadways, 2x flanking returns with A/fans, 3x S/cs and 1 bolter working from # 1 roadway across to #9 work it for over 8yrs. If you have a email address can give more details
mining016 at gmail
Thanks will send you more info in a couple of days
Hi Peter, where have you worked? I did 3.5 years at Aquila Mine, German Creek QLD Australia (1.6-1.8m seam Bord & Pillar).. And 6 years at Ensham Mine QLD as a deputy in Bord and Pillar. In my experience as an operator and Deputy, and with the success of both these mines in Australia, 2 SC's are always better than 3... unless the third is used only when changing sides of the belt road saving time on swapping the cars over (anchor points over the feeder).. We had tried 3 cars several times with very little success. This sequence is from right to left, and I would have to agree, not very good. It's always best to be able to do sequence 1 ahead of the roadway to allow for sequence 2 to be a breakoff before flitting to sequence 3.. This gives you the opportunity to hit two places at once.. This continues for Seq 3/4, 5/6, 7/8, and 9... you can add a stub at last cut through for 9, and then come back and do "bellouts" as we do at Ensham ✌🏼(you may already know all this)