Sign Board Removed From VIP Road For Metro Construction| Kolkata Metro Orange Line

แชร์
ฝัง
  • เผยแพร่เมื่อ 8 ก.ค. 2024
  • Sign Board Removed From VIP Road For Metro Construction| Kolkata Metro Orange Line
    Please click on the link below to Subscribe to my new channel "METRO BEAST" RELATED TO TRAVEL:
    / @user-ku3hx3cw3l
    ▶️All Related Hashtags:- #kolkatametro #kolkata #metroupdate #metro #construction #airportmetro #indianrailways #viproad #orangeline #pwd #signboard
    ▶️Video Highlights:- In this video, you will see the Sign board removal from VIP Road to construct Metro on Airport New Garia Orange Line of Kolkata Metro.
    Subscribe to my channel.
    ▶️ ❤Social Media :-
    Instagram- rohan_inst?...
    Facebook- rohan.sinha....
    ▶️Copyright Disclaimer:-
    Copyright Disclaimer under Section 107 of the copyright act 1976, allowance is made for fair use for purposes such as criticism, comment, news reporting, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use.
    ▶️ Thanks For Watching. ❤

ความคิดเห็น • 45

  • @indianrailwayslover375
    @indianrailwayslover375  14 วันที่ผ่านมา +1

    Please Subscribe to my TH-cam Channels Metro Beast and Indianrailways Lover.
    Link of Metro Beast Channel: youtube.com/@user-ku3hx3cw3l?si=vaUQ5uQW-Ony5b_z

  • @amittabhadatta1183
    @amittabhadatta1183 14 วันที่ผ่านมา +12

    Please report about bowbazaar, Durga Pithuri and escape shaft.

    • @rounakmondal5839
      @rounakmondal5839 14 วันที่ผ่านมา

      Sealdah Esplanade metro will start from 2025

    • @ChiNakPradChiragPradhan
      @ChiNakPradChiragPradhan 14 วันที่ผ่านมา +2

      ​@@rounakmondal5839 nono December is the opening time mow times of India article says ccrs inspection in October and start in December it'd cementation the contractor predicted 2025 but they have completed 80% thing now by the time they get approval all works will be completed

  • @jr1441.
    @jr1441. 14 วันที่ผ่านมา +3

    Please create a video with city-wise comparison of time taken to build and operate a certain distance/area of metro railway network. This will show where our Kolkata stands amongst others.

  • @rbarmadillo99
    @rbarmadillo99 14 วันที่ผ่านมา +1

    One suggestion: you should create a Google map alongside these videos that can provide a pillar by pillar update of the entire stretch of the line for all the different Metro lines. This will be immensely helpful in itself, and on top of that, if you can show the map overlay in the video itself, that will be even better.

  • @indrasishmukherjee1392
    @indrasishmukherjee1392 14 วันที่ผ่านมา +5

    Indian Railways lover ❌
    Orange line lovers ✅

    • @ishanmukherjee2386
      @ishanmukherjee2386 14 วันที่ผ่านมา +4

      After line 2 , Orange 🧡 line is most prioritised line now

    • @indianrailwayslover375
      @indianrailwayslover375  14 วันที่ผ่านมา +3

      Orange Line me maximum kaam chal rha hai that we can see and record. Purple line pe mostly underground work hai and the construction site is restricted too so waha video banana easy nhi hota. Orange line pe thoda easy hai video shoot karna.

    • @debojitbasu7458
      @debojitbasu7458 14 วันที่ผ่านมา +3

      If east west metro extended till santragachi and airport.. it will be the most important metro line in Kolkata.

    • @indianrailwayslover375
      @indianrailwayslover375  14 วันที่ผ่านมา +1

      @@debojitbasu7458 Let's see when we will have an official confirmation for extension till Santragachi.

    • @ayushchakrabarty5543
      @ayushchakrabarty5543 14 วันที่ผ่านมา

      @@indianrailwayslover375 We r eagerly waitin for barrackpore and possible baruipur line

  • @Abhishekkraja
    @Abhishekkraja 14 วันที่ผ่านมา +3

    Sealdah esplanade section me signalling ka trial chal raha h.. kal news aaya tha aisa kuch...

    • @ChiNakPradChiragPradhan
      @ChiNakPradChiragPradhan 14 วันที่ผ่านมา

      Are wo completed East bond tunnel Jesse rakes howrah maidan esplanade me central park depot se aati hai wo tunnel me start Hua hai west bound incomplete hai time mid July in 2025 tak metro actual trial runs ka to kisi bhi hal me lagega hi

    • @ChiNakPradChiragPradhan
      @ChiNakPradChiragPradhan 14 วันที่ผ่านมา

      Dada December is the opening time mow times of India article says ccrs inspection in October and start in December it'd cementation the contractor predicted 2025 but they have completed 80% thing now by the time they get approval all works will be completed

  • @utpalsengupta6872
    @utpalsengupta6872 14 วันที่ผ่านมา +1

    Friend Bhaiti you are doing excellent informatic work. Thanks. Apka bhi cholte rehe . Ea Central Govt ki kaam kaaj year after year cholte rehenge!! Kabhi khotom nahi huga!! ea Central Government ki kaam kaaj bohut e dhile pon mei hota hy!! Reasons politics and work culture!! Definitely not due to Paise and fund !! Another 12 years time require to complete the orange line!!! Kab se kaam chal rehe hy oar choli rehe hy!!! 😮

    • @ObitoUchiha10089
      @ObitoUchiha10089 14 วันที่ผ่านมา +2

      Accent: Bangali
      Language: Hindi
      Written script: English.
      Hotel: TRIVAGO.

    • @user-qd6dw7yk8h
      @user-qd6dw7yk8h 10 วันที่ผ่านมา

      @@ObitoUchiha10089😂😂

  • @sanjoysaha7615
    @sanjoysaha7615 14 วันที่ผ่านมา +2

    Belghoria expressway Kalyani expressway connection point pei pillar ka Kam ho Raha hai
    Woh kis chij ka hai.
    Ek video dijiye plz

  • @nakshsinghania9342
    @nakshsinghania9342 14 วันที่ผ่านมา +4

    When you will upload about Purple Line and Green Line INFO SERIES

    • @indianrailwayslover375
      @indianrailwayslover375  14 วันที่ผ่านมา +1

      Very soon

    • @nakshsinghania9342
      @nakshsinghania9342 14 วันที่ผ่านมา

      @@indianrailwayslover375 Ok

    • @ChiNakPradChiragPradhan
      @ChiNakPradChiragPradhan 14 วันที่ผ่านมา

      ​@@indianrailwayslover375dada December is the opening time mow times of India article says ccrs inspection in October and start in December it'd cementation the contractor predicted 2025 but they have completed 80% thing now by the time they get approval all works will be completed

  • @gourabpodder1202
    @gourabpodder1202 14 วันที่ผ่านมา +2

    Please make a video about Sealdah-Esplanade sectio of the 💚 line metro

    • @indianrailwayslover375
      @indianrailwayslover375  14 วันที่ผ่านมา

      @@gourabpodder1202 Yes , very soon

    • @ChiNakPradChiragPradhan
      @ChiNakPradChiragPradhan 14 วันที่ผ่านมา +1

      ​@@indianrailwayslover375dada December is the opening time mow times of India article says ccrs inspection in October and start in December it'd cementation the contractor predicted 2025 but they have completed 80% thing now by the time they get approval all works will be completed

    • @sagnikbiswas1778
      @sagnikbiswas1778 11 วันที่ผ่านมา

      Ur right​@@ChiNakPradChiragPradhan

  • @bharatsaha2200
    @bharatsaha2200 14 วันที่ผ่านมา +1

    What about airport to New barrackpore metro

  • @sparrow66188
    @sparrow66188 13 วันที่ผ่านมา

    Airport to bt college work status?

  • @swagatabhaumik978
    @swagatabhaumik978 14 วันที่ผ่านมา +2

    Dada, aur kitna din approximately lag sakta hain complete hone ke liye?

    • @indianrailwayslover375
      @indianrailwayslover375  14 วันที่ผ่านมา

      Bohot time lagega abhi Orange Line start hone me.. Atleast 2 years

    • @swagatabhaumik978
      @swagatabhaumik978 14 วันที่ผ่านมา

      @@indianrailwayslover375 Dhanyabad Dada! Itna intejer kar liya to 2 sal aur sahi..

  • @SHUBHAMSG
    @SHUBHAMSG 14 วันที่ผ่านมา +2

    How long do you think it will take to reach the Airport station?

    • @indianrailwayslover375
      @indianrailwayslover375  14 วันที่ผ่านมา

      From where?

    • @SHUBHAMSG
      @SHUBHAMSG 14 วันที่ผ่านมา

      @@indianrailwayslover375 From the section you highlighted here

  • @ChiNakPradChiragPradhan
    @ChiNakPradChiragPradhan 14 วันที่ผ่านมา

    Dada December is the opening time mow times of India article says ccrs inspection in October and start in December it'd cementation the contractor predicted 2025 but they have completed 80% thing now by the time they get approval all works will be completed

    • @indianrailwayslover375
      @indianrailwayslover375  13 วันที่ผ่านมา +1

      Which line and stretch??

    • @ChiNakPradChiragPradhan
      @ChiNakPradChiragPradhan 12 วันที่ผ่านมา

      @@indianrailwayslover375 green line

    • @sauravsharma6173
      @sauravsharma6173 12 วันที่ผ่านมา

      U are talking about Sec v to howrah line, not this line. this line will take atleast 3 more years

  • @satyajitdas2211
    @satyajitdas2211 14 วันที่ผ่านมา

    Konsa vip road ? Science city or saltlake

    • @dss-ld7fm
      @dss-ld7fm 14 วันที่ผ่านมา +3

      😂😂 vip road science city te kobe theke holo?

    • @yashagarwal9067
      @yashagarwal9067 12 วันที่ผ่านมา

      ​@dss-ld7fm he is confused between vip road and vip bazaar