Liebherr - Shipping fully assembled ship to shore container cranes from Ireland
ฝัง
- เผยแพร่เมื่อ 6 มิ.ย. 2017
- Early in 2017, Liebherr Container Cranes, assembled three ship to shore container cranes at Cork Dockyard in southwest Ireland.
The cranes were moved to the Albatross, a specialised heavy lift vehicle, before crossing the Atlantic and delivery to the Port of San Juan in Puerto Rico.
The cranes have an outreach of 39.62 m, a back reach of 15.24 m and a safe working load (SWL) of 65 tonnes under twinlift spreader.
Learn more about our STS cranes: www.liebherr.com/en/deu/produ... - วิทยาศาสตร์และเทคโนโลยี
I am one of the crane operators of thoses cranes here in Puerto Rico, and they are very comfortable to operate less back and neck spasms than others cranes i was operating.
another good video it's amazing how huge thing's are moved by sea
Yup, especially those nuclear turbines.
Nice vid!
I am intrigued as to how the ship maintains stability. Us mortals don’t know the half of what goes on in the world.
Amazing! I was just going to ask who transported them, but then I saw at 0:35. Who else...But Mammoet!
Is there any website for mechanical repair instructions
Would be nice to see how they are fixed to the deck.
#variability
Hello sir I need crane job
Thank you for your interest in joining the Liebherr Group.
You can find all job vacancies here and directly apply online: www.liebherr.com/career
Cost of the crane = X euros. Cost of moving the crane = 10 x X euros.
That is a reality the cost of moving goods from one part of the World to another part. Positive for Ireland is that they were manufactured in Killarney assembled,loaded and shipped from Cork.
😢😢😢😮😮😮😮😮😮😊😊😊
watch similiar process at th-cam.com/video/ytaOkDfBdNw/w-d-xo.html