  • During the drydock, a ship has to take shore power to ensure that al required electrical power will be met.
    When the ship sits on the keel blocks in the drydock, Before the water reduce to sea water suction level the ship power should be transfer to shore power because the auxiliary engine-generators, which produce the electrical power, can no longer work due to non-supply of cooling water to the engine. To avoid overheating of moving parts of the engine, the auxiliary engine has to be switched off before the water is pumped out of the drydock.
    The process of receiving shore supply is critical as unprotected connection may lead to accidents and wrong shore supply will hurt the efficiency and increase heat generation from onboard equipment.
    Once all checks are performed by ship’s engineer and the ship is ready to take the shore power the change over can take place.
    In this video we will show you the step by step process of changing over the electrical power from ship to shore while in Drydock.

ความคิดเห็น • 41

  • @judenesswood1476
    @judenesswood1476 ปีที่แล้ว +2

    This s really fantastic, simple and easy to understand instruction on changing over of ship power!

  • @moktadirkhan6322
    @moktadirkhan6322 11 หลายเดือนก่อน +2

    Nice job sir....from Bangladesh

  • @sankalp-_-6179
    @sankalp-_-6179 3 ปีที่แล้ว +4

    Great video...just an advice....try to keep the volume of background music low...so we can listen you better.....

  • @LouiseArchery
    @LouiseArchery 10 หลายเดือนก่อน +1

    Real scenario, thanks for this video you shared.

  • @tomahawkhans1686
    @tomahawkhans1686 ปีที่แล้ว +1

    This is fantastic, we are learning so much on your upload, keep it up.

  • @abduljackol1237
    @abduljackol1237 3 ปีที่แล้ว +1

    thanks for sharing this important process during docking

  • @quantumstorm4531
    @quantumstorm4531 ปีที่แล้ว +1

    Very informative, keep posting videos like this!

  • @woodypioneer
    @woodypioneer ปีที่แล้ว +1

    Great job, thank you for sharing, very interesting.

  • @jackwilliam7447
    @jackwilliam7447 หลายเดือนก่อน +2

    I thought we synchronize the shore connection first

  • @arnulfosumawekwek
    @arnulfosumawekwek 10 หลายเดือนก่อน +1

    Great Job!

  • @obamagtalancer3259
    @obamagtalancer3259 2 ปีที่แล้ว +1

    Thank you for sharing.

  • @JesiccaDaculcol
    @JesiccaDaculcol ปีที่แล้ว +1

    Thank you for this info!

  • @xavierusgamilde
    @xavierusgamilde ปีที่แล้ว +1

    Very good information

  • @hussainbalochia832
    @hussainbalochia832 3 ปีที่แล้ว +1

    good to hear from your Chief, nice video, love it

  • @JollibeeMcDonald
    @JollibeeMcDonald ปีที่แล้ว +1

    Very informative, real event

  • @luzzcess7358
    @luzzcess7358 ปีที่แล้ว +1

    So that is how you do it, very interesting

  • @yumimariyejisibulo5802
    @yumimariyejisibulo5802 2 ปีที่แล้ว +1

    Thank you for this informative video...

  • @uwekpalasak8893
    @uwekpalasak8893 2 ปีที่แล้ว +1

    wow thank you for sharing this.

  • @jobsseaman477
    @jobsseaman477 ปีที่แล้ว

    Very informative video, keep it up.

  • @MauriceCoquillalo
    @MauriceCoquillalo ปีที่แล้ว +1

    Good information

  • @rashidahmed3680
    @rashidahmed3680 3 ปีที่แล้ว +1

    nice, it was here in oman drydock

  • @dashpot06
    @dashpot06 2 ปีที่แล้ว +1

    Frequency also need to match with rating of the ship power supply. Need to check while connecting shore supply.

  • @marinerongfilipino5812
    @marinerongfilipino5812 ปีที่แล้ว +1

    This is good

  • @zelmirarashieka470
    @zelmirarashieka470 3 ปีที่แล้ว +1

    interesting job

  • @nikhilodeanyt9808
    @nikhilodeanyt9808 2 ปีที่แล้ว +1

    If reversing of phase took place does that mean the motor will run in reverse direction ?🤔

  • @Napoleon_Blownapart
    @Napoleon_Blownapart 2 ปีที่แล้ว +2

    Please, less music

  • @recoveryfiles8098
    @recoveryfiles8098 3 ปีที่แล้ว +1

    Chief ask ko lang, pag on ng shore power breaker sa MSB, automatic ang supplyan nya na load parang supply ng emergency gen.? Tama ba? Salamat Chief

    • @joelsibuloLifeofaSeafarer18
      @joelsibuloLifeofaSeafarer18  3 ปีที่แล้ว

      👍 Yup, automatic kasi ang shore connection normally nasa line ng MSB ang downside lng depende sa kaya ng Breaker na Amps, depende sa barko, pero normal about 400 to 500 Amps lng. Thanks

    • @recoveryfiles8098
      @recoveryfiles8098 3 ปีที่แล้ว +1

      @@joelsibuloLifeofaSeafarer18 salamat Chief, God bless you!

    • @anakti
      @anakti 2 ปีที่แล้ว +1

      Paano pag ibabalik na sa ships generator chief, reverse procedure lang?

    • @joelsibuloLifeofaSeafarer18
      @joelsibuloLifeofaSeafarer18  2 ปีที่แล้ว +1

      @@anakti pag balik once tanggalin ang shore power Papasok automatically ang Emergency Generator kpg nk AUTO ang set up, pwede rin eh manual pero better nk nk automatic once pumasok na sa Main Switch Board ang power sa emergency Gen. may power na ang barko limited sa emergency distribution, then pwede nag pa andar ng DO pump para sa Aux. Engine kung ang design separate meron iba nk couple and pump sa Aux n Makina so diretso n yon, then may time n ang set up wala p enough starting air so paandar emergency compressors, kpg may hangin and fuel start n manually ship Aux. Engine kpg umandar n manually pasok ang load sa MSB then kpg pumasok mag automatic matanggal sa load ang emergency power sa emergency Generator, then okey na!

  • @rambncle8850
    @rambncle8850 3 ปีที่แล้ว

    Sir? Sino Elect nyo dyan? Si sir Ronald Aldea ba sir?

  • @kirstenbelleocampo5604
    @kirstenbelleocampo5604 2 ปีที่แล้ว +1

    Thank you for sharing.