Create Microsoft Project (.MPP) File from ChatGPT
This tutorial shows you how to create a simple Microsoft Project (.MPP) schedule file from ChatGPT.
To hire us to consult on your project, please visit our website at tools.pjmss.com/request/new
or, email us at info@pjmscheduling.com
Visit our forums at community.pjmss.com/
Check out our P6 and MS Project Comparison Tools at tools.pjmss.com/
มุมมอง: 252

วีดีโอ

Reviewing Construction Schedules: Activity Traction Report
มุมมอง 2Kปีที่แล้ว
This tutorial shows you how to create an activity traction report from Primavera P6. Check out our P6 and MS Project Comparison Tools at tools.pjmss.com/ To request a live help session with Pat or to request help on your project, visit our website at www.pjmss.com/
How to Build a P6 Schedule from Scratch - Part 11: Resource Assignments
มุมมอง 2.6K2 ปีที่แล้ว
This is part 11 of our series on how to build a Primavera P6 schedule from scratch. In this lesson, we walk through how to resource load equipment and labor hours in your schedule. To request a live help session with Pat, visit our website at www.pjmss.com/
Scheduling Concepts - Part 2: Relationships
มุมมอง 8932 ปีที่แล้ว
This series explains foundational concepts for construction scheduling. In this video, we discuss activity relationships. To hire us on your next project, or to request a live help session with Pat, visit our website at www.pjmss.com/ Check out our P6 and MS Project Comparison Tools at tools.pjmss.com/
Scheduling Concepts - Part 1: Data Date
มุมมอง 1.4K2 ปีที่แล้ว
This series explains foundational concepts for construction scheduling, starting with the data date. To hire us on your next project, or to request a live help session with Pat, visit our website at www.pjmss.com/ Check out our P6 and MS Project Comparison Tools at tools.pjmss.com/
Creating an S-Curve from Primavera P6
มุมมอง 14K2 ปีที่แล้ว
This tutorial shows you how to create an S-curve (early and late cost curve) from Primavera P6. Check out our P6 and MS Project Comparison Tools at tools.pjmss.com/ To request a live help session with Pat, visit our website at www.pjmss.com/
Importing Actual Expenses from Excel to P6
มุมมอง 1.7K2 ปีที่แล้ว
This is tutorial shows you have to import actual expenses from excel into Primavera P6. Check out our P6 and MS Project Comparison Tools at tools.pjmss.com/ To request a live help session with Pat, visit our website at www.pjmss.com/
Full P6 Tutorial: Cost Loading with Expenses
มุมมอง 6K2 ปีที่แล้ว
This is a full tutorial for cost loading using expenses in Primavera P6. Importing Expenses from Excel to P6: th-cam.com/video/TQWDrHNCuls/w-d-xo.html Check out our P6 and MS Project Comparison Tools at tools.pjmss.com/ To request a live help session with Pat, visit our website at www.pjmss.com/
How to Build a Microsoft Project Schedule from Scratch - Part 2: How to Baseline Your Schedule
มุมมอง 9912 ปีที่แล้ว
This is part 2 of our series on how to build a schedule in Microsoft Project from scratch. In this lesson, I show you how to baseline your schedule to be able to compare back in future updates. To request a live help session with Pat, visit our website at www.pjmss.com/ Schedule Comparison Reports: tools.pjmss.com/
How to Build a Microsoft Project Schedule from Scratch - Part 1: Intro to Project
มุมมอง 4.6K2 ปีที่แล้ว
This is part 1 of our series on how to build a schedule in Microsoft Project from scratch. In this lesson, we give a brief introduction and overview of the Microsoft Project software. To request a live help session with Pat, visit our website at www.pjmss.com/ Schedule Comparison Reports: tools.pjmss.com/
Create a Stacked Histogram in P6 from Daily Reports
มุมมอง 2.1K2 ปีที่แล้ว
Here is a quick tutorial on how to import manhour information from the daily reports into P6 to make a stacked histogram. Check out our P6 and MS Project Comparison Tools at tools.pjmss.com/ To request a live help session with Pat, visit our website at www.pjmss.com/
THE BEST WAY to compare Microsoft Project (.MPP) files
มุมมอง 1.2K2 ปีที่แล้ว
We have just launched the Microsoft Project (.MPP) comparison tool, available at tools.pjmss.com/tool/compare/mpp Compare MPP file and see the changes that were made between files and perform key health checks. It's FREE for your first 10 days and $10 per month thereafter. Cancel at any time.
THE FASTEST Way to Cost Load a P6 Schedule
มุมมอง 6K2 ปีที่แล้ว
Here is a quick tutorial on showing the fastest way that I know how to cost load a Primavera P6 schedule. To request a live help session with Pat, visit our website at www.pjmss.com/
P6 Filters: Find the Driving Path to a Specific Activity (Float Path)
มุมมอง 6K2 ปีที่แล้ว
A quick tutorial on how to filter for the 4 week look-ahead in Primavera P6. To request a live help session with Pat, visit our website at www.pjmss.com/
P6 Filters: 4 Week Look Ahead
มุมมอง 4.2K2 ปีที่แล้ว
A quick tutorial on how to filter for the 4 week look-ahead in Primavera P6. To request a live help session with Pat, visit our website at www.pjmss.com/
THE BEST WAY to Filter for Activities that have Made Progress in P6
มุมมอง 4.4K3 ปีที่แล้ว
THE BEST WAY to Filter for Activities that have Made Progress in P6
THE BEST WAY to Filter for Out-of-Sequence Activities in P6
มุมมอง 5K3 ปีที่แล้ว
THE BEST WAY to Filter for Out-of-Sequence Activities in P6
How to Correct Out of Sequence Progress in P6
มุมมอง 2.4K3 ปีที่แล้ว
How to Correct Out of Sequence Progress in P6
Scheduling Concepts: Loose Starts and Loose Finishes
มุมมอง 6663 ปีที่แล้ว
Scheduling Concepts: Loose Starts and Loose Finishes
Construction Project Schedule & Control - Appendix A - Assignment 5
มุมมอง 8623 ปีที่แล้ว
Construction Project Schedule & Control - Appendix A - Assignment 5
Construction Project Schedule & Control - Appendix A - Assignment 4
มุมมอง 1.3K3 ปีที่แล้ว
Construction Project Schedule & Control - Appendix A - Assignment 4
Construction Project Schedule & Control - Appendix A - Assignment 1 - 6e
มุมมอง 7033 ปีที่แล้ว
Construction Project Schedule & Control - Appendix A - Assignment 1 - 6e
Construction Project Schedule & Control - Appendix A - Assignment 3
มุมมอง 8883 ปีที่แล้ว
Construction Project Schedule & Control - Appendix A - Assignment 3
Construction Project Schedule & Control - Appendix A - Assignment 2
มุมมอง 1.5K3 ปีที่แล้ว
Construction Project Schedule & Control - Appendix A - Assignment 2
Construction Project Schedule & Control - Appendix A - Assignment 1
มุมมอง 3.3K3 ปีที่แล้ว
Construction Project Schedule & Control - Appendix A - Assignment 1
Import Resources from Excel to P6
มุมมอง 10K3 ปีที่แล้ว
Import Resources from Excel to P6
How to Convert a Microsoft Project file to Primavera P6
มุมมอง 9K3 ปีที่แล้ว
How to Convert a Microsoft Project file to Primavera P6
How to Build a P6 Schedule from Scratch - Part 10: Comparing Schedules
มุมมอง 3K3 ปีที่แล้ว
How to Build a P6 Schedule from Scratch - Part 10: Comparing Schedules
How to Build a P6 Schedule from Scratch - Part 9: Updating
มุมมอง 4.4K3 ปีที่แล้ว
How to Build a P6 Schedule from Scratch - Part 9: Updating
An Introduction to CPM Scheduling - Part 0
มุมมอง 9K3 ปีที่แล้ว
An Introduction to CPM Scheduling - Part 0

ความคิดเห็น

  • @AndreaDiDio74
    @AndreaDiDio74 วันที่ผ่านมา

    Thanks, and with decimal values after dot or comma, doesn't work... could you load values with decimal digits ?

  • @leonardokpaleke5772
    @leonardokpaleke5772 11 วันที่ผ่านมา

    Do you have a video using global change to update the budgeted expense cost, actual expense cost and remaining expense cost to zero.

    • @PJMScheduling
      @PJMScheduling 11 วันที่ผ่านมา

      I have not made a video for that. But thanks for the idea!

  • @savrah
    @savrah 18 วันที่ผ่านมา

    Building a project is relatively easy, the challenge is updating and reporting. Is there any tools for this?

    • @PJMScheduling
      @PJMScheduling 18 วันที่ผ่านมา

      I've been working on doing a tutorial for updating the schedule with ChatGPT. Long story short, I haven't been able to get a consistent outcome or successfully perform a project update. It's close, and I'm sure as the AI improves it will be easy to perform updates and generate reports. As of right now though, it is not a reliable way to update the schedule.

    • @savrah
      @savrah 18 วันที่ผ่านมา

      How about reporting?

    • @karamhasan2474
      @karamhasan2474 17 วันที่ผ่านมา

      Is there any procedure to get the schefule as Primavera XER format, instead of microsoft project?

    • @PJMScheduling
      @PJMScheduling 16 วันที่ผ่านมา

      @@karamhasan2474 I wish! I'm waiting for that one. You can't get it directly as an XER file. There are likely ways to convert the MPP to an MPX, which is importable to P6. Or, I believe you can generate an XML file. I haven't experimented with it yet though.

    • @PJMScheduling
      @PJMScheduling 11 วันที่ผ่านมา

      @@karamhasan2474 th-cam.com/video/8HBHDHeD19o/w-d-xo.html Here's the tutorial I made regarding converting MPP files to P6.

  • @kalendugodfrey4154
    @kalendugodfrey4154 23 วันที่ผ่านมา

    Hi patrik, how can i get the Total Project percent progress after updating Activity percent complete in primavera. Thank you

  • @UmarFarooq-k1q1m
    @UmarFarooq-k1q1m 29 วันที่ผ่านมา

    Why schedule was not baselined before applying actuals?

  • @CivilEngineer-p9i
    @CivilEngineer-p9i หลายเดือนก่อน

    👍👍👍👍👍👍👍👍👍👍👍👍

  • @faizankirmani6266
    @faizankirmani6266 หลายเดือนก่อน

    Please keep updating more videos

  • @CREATACLASSES
    @CREATACLASSES หลายเดือนก่อน

    Thank you

  • @zohaibhabib6780
    @zohaibhabib6780 หลายเดือนก่อน

    Many thanks for sharing your knowledge. However, this is only pure progress - what about comparing non-progress.

  • @arshiasobhani5069
    @arshiasobhani5069 หลายเดือนก่อน

    Hi Patrik! How I can reach out to you? Do you have any mentorship programs? I am familiar with p6 but never had a chance to employ it at work and working as project scheduler. I want to learn as much as I can the tricks and techniques could you please help me with that?

    • @PJMScheduling
      @PJMScheduling หลายเดือนก่อน

      Hi Arshia, that's very kind. Yes, I do 1 on 1 training. Email me at info@pjmscheduling.com and I'll connect with you with more details.

  • @arshiasobhani5069
    @arshiasobhani5069 หลายเดือนก่อน

    Hi Patrik, thank you so much for providing these series. I have a question regarding constraint (star on or after), why we don’t use finish on or before constraint instead? Thanks again!

    • @PJMScheduling
      @PJMScheduling หลายเดือนก่อน

      Hi there, using finish on or before constraints will cause all preceding activities for the activity with the constraint to calculate float based on that "finish on or before" constraint, instead of calculating float based on the project. Both constraints have their own uses though.

  • @saudpm40
    @saudpm40 หลายเดือนก่อน

    how we update resource loaded schedule in p6 any video you can refer?

  • @liaqatkamran6394
    @liaqatkamran6394 หลายเดือนก่อน

    What-if the project finish date does not match with reflection schedule after merging updates?

    • @PJMScheduling
      @PJMScheduling หลายเดือนก่อน

      @@liaqatkamran6394 You'll need to be able to explain why there is a difference between the two files. Typically, it's because there were relationship or duration changes downstream of the delay event. If those helped mitigate the delay, that should be explained. If they exacerbated the delay, that should also be explained.

  • @saudpm40
    @saudpm40 2 หลายเดือนก่อน

    Hi Patt ! How is your budgeted units= 40 . When your duration= 25 days.

    • @PJMScheduling
      @PJMScheduling 2 หลายเดือนก่อน

      Hi Saud, ignore the budgeted units in this example. Those were auto-generated when the resource was assigned. It depends on what the default units per time is set at for the resource, and it will auto-generate a budgeted units amount based on the duration. If the duration gets changed on the activity, or if an activity is copied over with the resource, it will retain the original budgeted units that was generated when the first activity was created.

    • @saudpm40
      @saudpm40 หลายเดือนก่อน

      @PJMScheduling what's the default units /time in this exampl?

    • @PJMScheduling
      @PJMScheduling หลายเดือนก่อน

      @saudpm40 I believe it was 8 hours per day. Or 1 man per day.

    • @saudpm40
      @saudpm40 หลายเดือนก่อน

      @@PJMScheduling so 8×25 should be 200 budgeted units? Pls tell me if I am wrong

    • @PJMScheduling
      @PJMScheduling หลายเดือนก่อน

      @saudpm40 that would be correct. As I mentioned, ignore the budgeted units. This was not an exercise about utilizing budgeted units, and there are a variety of reasons it could be different from what would typically be calculated based on default units per time. I.e., I may have changed the duration, copied over the activity from another and changed the duration.

  • @nurettinarslan8315
    @nurettinarslan8315 2 หลายเดือนก่อน

    perfect and thank you so much

  • @Brogdan2
    @Brogdan2 2 หลายเดือนก่อน

    Hi Pat, thank you for this! Really useful. Why do we choose Free Float instead of Total float in the Schedule options?

    • @PJMScheduling
      @PJMScheduling 2 หลายเดือนก่อน

      If we were to use Total Float, we would get different answers because Total Float is based on the Project's longest path. Also, total float can be altered by constraints. Free float is the amount of time an activity can be delayed before impacting its successor, whereas Total Float is the amount of time that an activity can be delayed before impacting the entire project. Since we are focused on intermediate milestones, we want to focus on "free float" to that specific path.

  • @jimdavis5849
    @jimdavis5849 2 หลายเดือนก่อน

    Super tutorial! Thanks!

  • @okashaahmedmalik9363
    @okashaahmedmalik9363 2 หลายเดือนก่อน

    how can we do it on Golf Course if we have 1200+ items and these items must be divided into activities having certain percentages, Can you help me out on this

    • @PJMScheduling
      @PJMScheduling 2 หลายเดือนก่อน

      It's a great question. Yes, I can. Feel free to submit a request on pjmss.com. In summary, add the durations of all 1200 items and then divide each activity's duration into the total to get a % complete for each activity. Then, multiply that % complete by your budgeted cost. This will give you your budgeted cost for each activity. Then, import those expenses from excel into P6.

  • @okashaahmedmalik9363
    @okashaahmedmalik9363 2 หลายเดือนก่อน

    how can we do it on Golf Course if we have 1200+ items and these items must be divided into activities having certain percentages, Can you help me out on this

  • @KMann71
    @KMann71 3 หลายเดือนก่อน

    very useful thanks!

  • @MAJDNASRALLAH
    @MAJDNASRALLAH 3 หลายเดือนก่อน

    I am attempting to do the same but I am facing difficulties: _ When copying as instructed, I get shifted unorganised data. _ The data obtained on P6 is not logical. The maximum number reached in the "Cumulative Remaining Late" section does not reach the budgeted total cost. I would greatly appreciate your help with this.

  • @muhammadhamid358
    @muhammadhamid358 3 หลายเดือนก่อน

    I really appreciate your way of explaining it.

  • @olse89
    @olse89 3 หลายเดือนก่อน

    this is useful for most of lumpsump construction project, another way cost loading without single resource load

  • @nawaztausif7134
    @nawaztausif7134 3 หลายเดือนก่อน

    Thank you so much

  • @KB_theauthentic
    @KB_theauthentic 3 หลายเดือนก่อน

    Very straight forward and clean...it's been a few years since I've used P6 - but I may need to go back to it - good stuff. Thanks.

  • @xerukawan
    @xerukawan 3 หลายเดือนก่อน

    I have a question. you just copied the BL sch. file and start updating it without assigning/maintaining BL. What should we do if we make an update for the next month? I mean which file shall we copy; either the BL file or UD 01 file to update it for UD 02?

    • @PJMScheduling
      @PJMScheduling 3 หลายเดือนก่อน

      You would copy Update # 01 to make Update # 02, then Update # 02 to make Update # 03, and so on.

  • @jgonzo909
    @jgonzo909 4 หลายเดือนก่อน

    This is fantastic, thank you!!!

  • @dinoaragon6700
    @dinoaragon6700 4 หลายเดือนก่อน

    Pat great video! I'm having issues with importing the Price / Unit with the resources? I have Price / Unit selected as part of the export following what you provided here.

    • @PJMScheduling
      @PJMScheduling 4 หลายเดือนก่อน

      Make sure that when you export into excel from P6 that you select the resource assignments bubble and not the "activities" bubble.

  • @eray1212
    @eray1212 5 หลายเดือนก่อน

    great one

  • @MikePannell-h6r
    @MikePannell-h6r 5 หลายเดือนก่อน

    Great video. What if you're trying to find the top ten driving paths to a milestone?

  • @moussaabbahouli361
    @moussaabbahouli361 5 หลายเดือนก่อน

    is there any turorial about shipping delvery and supply on project?

    • @PJMScheduling
      @PJMScheduling 5 หลายเดือนก่อน

      I have not done one regarding delivery of materials on a project. What are you looking for specifically?

    • @moussaabbahouli361
      @moussaabbahouli361 5 หลายเดือนก่อน

      @@PJMScheduling I have multiple trucks and drivers to manage and plan their load and delivery destinations. also multiple machine with operators to plan their workload and back-to-back replacement. It may be close to make up a planning for factory production for example. it would be great if I can find a template.

  • @TheMinuteMasters
    @TheMinuteMasters 6 หลายเดือนก่อน

    What is a "child" is not being created below our project? For me, it keeps adding not "child" WBS. Also my indent our outdent arrows don't function.

    • @PJMScheduling
      @PJMScheduling 6 หลายเดือนก่อน

      Make sure that when you are in the WBS section, your "Group and Sort" is set to "Default".

  • @AbdulWajid-ns9pe
    @AbdulWajid-ns9pe 7 หลายเดือนก่อน

    In the baseline that is the month of June and the have actual finish dates of even Jul., please can you explain this?

  • @afreemantc
    @afreemantc 7 หลายเดือนก่อน

    completely unhelpful

  • @mithuns6577
    @mithuns6577 7 หลายเดือนก่อน

    Very well explained in a neat and simple way... thank you brother...

  • @reginaldibenne6875
    @reginaldibenne6875 8 หลายเดือนก่อน

    Thanks for the wonderful video.. Pls, I have a question. QUESTION.. What is the best way to cost load a project? Is the the export to Excel and Cost load or through resource in Detail view in Primavera P6. Thanks

  • @Imperium390
    @Imperium390 8 หลายเดือนก่อน

    What happened to assignments 6 to 9?

  • @wwspamtrash
    @wwspamtrash 8 หลายเดือนก่อน

    its sad that, no control+F2 :(

  • @Hagosea75
    @Hagosea75 9 หลายเดือนก่อน

    That’s the best tutorial video ever. Thanks.

  • @elmira5949
    @elmira5949 9 หลายเดือนก่อน

    how do we set up a one-on-one session?

  • @niheerthakur4128
    @niheerthakur4128 9 หลายเดือนก่อน

    My manager after reviewing construction schedule on P6 commented “ several activities are riding the data date”. What does that means? Can anyone explain please

    • @PJMScheduling
      @PJMScheduling 9 หลายเดือนก่อน

      It means that all of the predecessors are completed for the activity. Therefore, there are no more active predecessors that are preventing that work from occurring. Only the data date is preventing the activity from occurring. This either means that the activity has to start immediately or should be re-tied to a different predecessor to give it a more accurate projected date.

    • @niheerthakur4128
      @niheerthakur4128 9 หลายเดือนก่อน

      @@PJMSchedulinghow is the data date preventing an activity from happening, isnt the data date just a date to measure the past progress? For example if the data date is 15th April so the P6 data is telling us what was completed on and before 15th April right? So if the activity is schedule to start on the data date how is data date driving it.?

    • @PJMScheduling
      @PJMScheduling 9 หลายเดือนก่อน

      @@niheerthakur4128 You are correct, but all remaining work is calculated from the data date. If you move the data date from April 15th to April 20th, then all remaining work will be calculated based on the earliest start date of April 20th. For example, if you have an activity with no predecessor relationship, and you calculate the schedule, the start date for that activity will be equal to the data date. That is essentially what is happening when your manager says there are activities "riding the data date". All predecessors have been completed for that activity and, as a result, the projected start date for the activity is equal to the data date.

    • @niheerthakur4128
      @niheerthakur4128 9 หลายเดือนก่อน

      @@PJMScheduling ok I understand it now but what is the right practice to follow here to avoid this. I mean if the predecessors are complete and the current activity should now ride the data date. What should be done here or is it nothing wrong to have activities riding the data date?

    • @PJMScheduling
      @PJMScheduling 9 หลายเดือนก่อน

      @@niheerthakur4128 It depends. If there is literally nothing preventing the activity from starting and it is simply not getting done because it's low priority, then it's fine to let it ride the data date. But if it's riding the data date due to inaccurate logic, then I would tie the activity to an appropriate predecessor so that it is scheduled to start when you plan on getting work done.

  • @kunalbut
    @kunalbut 9 หลายเดือนก่อน

    access violation error. cannot proceed

  • @bananarepublic8951
    @bananarepublic8951 10 หลายเดือนก่อน

    One of the best P6 lessons I seen on TH-cam. Thanks for this

  • @johnsafi1104
    @johnsafi1104 10 หลายเดือนก่อน

    Please make some videos regarding global change and other advanced things in P6

  • @johnsafi1104
    @johnsafi1104 10 หลายเดือนก่อน

    Great job

  • @mohamedahmedabdelrhem324
    @mohamedahmedabdelrhem324 10 หลายเดือนก่อน

    The Best

  • @raja.mubbasshir9072
    @raja.mubbasshir9072 10 หลายเดือนก่อน

    I had worked on a project A, adjusted its headers, columns, footer, titles etc, taken print outs and closed this. Then I worked on another project and I deleted old project and its enterprise. The second project has different title, header, footer etc. The problem I am having is when I try to access my First project A from .xer file it opens up in new settings even I added another enterprise to that. Can you please help on that

  • @s.faisal6613
    @s.faisal6613 11 หลายเดือนก่อน

    Hi, where are the remaining assignments from 6 to 9? Do you also have other practice P6 projects?

  • @solomonagunsoye8064
    @solomonagunsoye8064 11 หลายเดือนก่อน

    Thanks for the Excellent Video! I got an issue though. My original duration always changes whenever I update the activities with a different actual start and finish date to the baseline but doesn't change when the dates are same as the baseline. Please what am I doing wrongly?

    • @PJMScheduling
      @PJMScheduling 11 หลายเดือนก่อน

      My guess is you have the resource setting checked called "Drive activity dates by default". This can be checked at both the project level and the resource level. So my question would be, #1 - Do you have resources assigned to the activities. #2 - If so, make sure to uncheck the "Drive activity dates by default" on the resource assignment. That should take care of the issue.

  • @abdullahiqbal7733
    @abdullahiqbal7733 11 หลายเดือนก่อน

    When I upload and generate files from your link. It says there was a problem, please try again.

    • @PJMScheduling
      @PJMScheduling 11 หลายเดือนก่อน

      Send me the files at info@pjmscheduling.com and we will take a look.