Thanks Brad! South expansion - westside: @ 3:31 Excavation to finish the perimeter grade beam across the gap. We will soon lose our view. Substation expansion project: @ 12:16 Installation work for the new 345 kV switches. I think the switches themselves have been temporarily moved to 12:09 (right) between the trailer and the fence? Note: the ground wires grounding the work vehicles.
Thanks Brad. *Sort by Newest First or Top Comments if only the first few lines are visible* 1:08. Southend, east. Tank farm, Level 1. Bottom right. Insulated pipework enters the ground. 2:00. Southend, east. Level 1. Left. Retaining wall concrete placement. Frames for 2 x double pedestrian doors, and a roll-up door behind. Right. Bulk insulation to the delivery bay wall. Top. White insulated pipe originates at 1:08. 2:16. Southend, south. Fire Escape Passages. Concrete ramps complete. 3:22. Southend, west. Excavating to complete the perimeter grade beam. Might loose the view in through that gap also. 4:46. Westside, storage. Top centre. Gradeworks, and an office trailer delivery. A new contractor yard perhaps. New permit for Stamping 2 Hot Stamping 2. Blue wrapped items adjacent are speculatively that press. Triangular storage yard. 3 transformers being delivered. 5:18. Westside. Triangular storage yard. 70 Prolec transformers by my count. 6:16. Westside, Sand Hill Lateral Pipeline project. Bottom. Good view of the reamers. 6:45. Westside, Tunnel Project. 8 bored shafts. Pile footing for a small structure? 8:12. EOL, Transport yard. Permanent power supply to the office being connected. 12:15. New switchyard/substation. New framework matches existing. 12:53. Tesla Road, west. Fresh asphalt. 15:25. Casting, diagonal corner. Apron. Bottom left. Another furnace tender vehicle. Appears to be the yellow one. 15:33. Casting, Baghouse structure. Internally lined duct being installed through the wall. Aiming for the heat-exchanger. 15:50. BIW, apron. Text-book 80/20 rule example. There’s always 20% to be completed.
Please Like and Subscribe to this channel. Click the bell for notifications.
Needed support can be given at this link: www.paypal.com/donate/?hosted_button_id=2BRVFKB9ER6A4
Incrível esse documentário
Thanks!
Merci👍👍👍
Thanks Brad!
South expansion - westside:
@ 3:31 Excavation to finish the perimeter grade beam across the gap. We will soon lose our view.
Substation expansion project:
@ 12:16 Installation work for the new 345 kV switches. I think the switches themselves have been temporarily moved to 12:09 (right) between the trailer and the fence?
Note: the ground wires grounding the work vehicles.
Nice video! Thank you!
Thanks Brad.
*Sort by Newest First or Top Comments if only the first few lines are visible*
1:08. Southend, east. Tank farm, Level 1. Bottom right. Insulated pipework enters the ground.
2:00. Southend, east. Level 1. Left. Retaining wall concrete placement. Frames for 2 x double pedestrian doors, and a roll-up door behind.
Right. Bulk insulation to the delivery bay wall.
Top. White insulated pipe originates at 1:08.
2:16. Southend, south. Fire Escape Passages. Concrete ramps complete.
3:22. Southend, west. Excavating to complete the perimeter grade beam. Might loose the view in through that gap also.
4:46. Westside, storage. Top centre. Gradeworks, and an office trailer delivery. A new contractor yard perhaps. New permit for Stamping 2 Hot Stamping 2. Blue wrapped items adjacent are speculatively that press.
Triangular storage yard. 3 transformers being delivered.
5:18. Westside. Triangular storage yard. 70 Prolec transformers by my count.
6:16. Westside, Sand Hill Lateral Pipeline project. Bottom. Good view of the reamers.
6:45. Westside, Tunnel Project. 8 bored shafts. Pile footing for a small structure?
8:12. EOL, Transport yard. Permanent power supply to the office being connected.
12:15. New switchyard/substation. New framework matches existing.
12:53. Tesla Road, west. Fresh asphalt.
15:25. Casting, diagonal corner. Apron. Bottom left. Another furnace tender vehicle. Appears to be the yellow one.
15:33. Casting, Baghouse structure. Internally lined duct being installed through the wall. Aiming for the heat-exchanger.
15:50. BIW, apron. Text-book 80/20 rule example. There’s always 20% to be completed.
Excellent Brad thanks again!
18-10-2024.
Thank you Brad, more pretty please.😊
Thank you! Great videography. Still enjoy your music selections.
Yeah ❤ the music.
Thanks Brad.
Wonderful, cheers mate. I'm hoping for a seriously strong Q4 and so far so good.
Soooo what exactly is going to be made on the new south end? (Besides the super computer)
Awesome Video Salute 🫡
Thanks!