College Softball Field Footing

แชร์
ฝัง
  • เผยแพร่เมื่อ 28 ม.ค. 2025

ความคิดเห็น • 6

  • @MixerandplantpartsMfg
    @MixerandplantpartsMfg 3 ปีที่แล้ว +1

    Thank you for sharing

  • @psidvicious
    @psidvicious 3 ปีที่แล้ว

    They’re fairly stringent with concrete testing down here in S. FL. We’re required a test and a batch of cylinders made, every 50yds. Usually 4 or 5 cylinders for every test, depending on how quickly you need breaks done.

  • @GHOSTRIDERHASS88
    @GHOSTRIDERHASS88 3 ปีที่แล้ว +1

    That was super smooth, you make it look so easy. These type of footings always make me sweat because of the damn rebar everywhere and some clown yelling when I get too close. I’m around 4 months into my concrete journey, usually learning the hard way on a daily basis. How long did it take you to get a good feel for everything?

  • @jasongiard3533
    @jasongiard3533 3 ปีที่แล้ว

    How long have you been driving a mixer