Drill and Blast Sequence [Fuzor Method Statement]
ฝัง
- เผยแพร่เมื่อ 22 ส.ค. 2022
- Drill and blast method is a common practice used in the rock excavation. The cyclic nature of this method requires good work site organization. Fuzor produces detailed sequence animations to help the workforce to better understand the works ahead and highlight the potential challenges before going to the site. This video illustrates the Brill and Blast sequence.
If you would like to know more about Fuzor, please feel free to contact us at www.kalloctech.com/contact.jsp
Fuzor tools applied: Material Library, Content Library, Graphic Settings, 4D Simulation, Sequence Animation, Fly Through, GIS, Visibility Override, 3D Location Marker, Multi-Track
Keywords:
#Fuzor, #VDC, #AEC, #construction, #constructionsequencesimulation, #aecsoftware, #4D, #4Dsimulation, #constructionsequenceanimation, #virtualdesignconstruction, #4Dworkflow, #5D, #tunnel, #NATM, #Drilling, #Blasting - วิทยาศาสตร์และเทคโนโลยี
They sprayed shotcrete before bolting and then shotcreted again? This is backwards
Not really. There mines that do exactly that. One mine used to spray 100mm before meshing and 50mm after meshing. It all depends on the rock conditions.
which software you used?
It is Fuzor Virtual Design Construction. You can visit www.kalloctech.com for further details.
.