Changing Power Pole in Double Springs AL.
ฝัง
- เผยแพร่เมื่อ 7 พ.ย. 2024
- Alabama power changing out power pole in front of Winston County Board of Education to make room for new sidewalk. Filmed at Fraziers service station, narrated by Wayne Daniels and fet. Tom Frazier. 06 Dec 12
That’s one hell of an operator right there !!
Fast truck. Good operator. That truck is overkill for a pole that size. Easy job when theres no lines overhead to deal with.
SMOOOTH, Tho they have some pretty easy soil They dig In. , no rock no tree roots no UG utilities to worry about
They installed that pole really quickly. Those guys are down with that sh*t.
that pole looks like its leaning a little bit!!
The pole goes in deep.
That's what your wife said last night
38 Surrey Road Wanganui New Zealand power pole is
i may have been part of the team to build that truck. welder
U work for altec?? I have a good question regarding a fracture on an Altec T40b. It was a tubular stress crack on maybe some 1 inch at best . Id like to pickur brain on if that would need a specialized or certified welder for a basket. Telecom line Worker here.. they ended just replacing the whole basket since it was under warranty still. some 6 years old which i was surprised at
When's smoko
I just laugh at the 2 guys on the right side
Piss poor tamping job if you ask me. whats the point of tamping the last foot LOL
that type of soil aka sand cant really be compacted . THe initial DIRT sure but type C soil not gonna do much tamping it. You ever tamp sand hydraulicly especially dry sand?
Dayday i haved work on a power line before
Trying to act like dot workers where 4 or 5 is just standing around leaning on a shovel and only 1 doing the work
steve smith was
my nigga
This is a funny fideo
All for nothing. This species will go extinct.
4 men for a 2 or even a 1 man job. Been there done that. Lol
2A' ZZ trust me this is not a 2 man job and sure as hell not a one man job. This is about as easy as it gets and what do you think they have to do after they set the pole? There are energized wires up there that they have to transfer
Boring