Hi I have a problem, I have a total station Leica TS07 of 1 second and I try to connect with the phone via bluetooth but I have a problem after I put the pin in the phone to do the pairing with the station, the message does not appear on the station yes I accept the phone to connect to the station, and on the display I still have the bluetooth sign with the sign! . I mention that I gave a reset to the station and I deleted all the jobs and still does not go, does not show me that prompt message on the station. Thanks
Hi Sulleyman, the easiest way of setting up back sight is actually manually work out bearing from the station to the back sight point using a calculator or spreadsheet, then sight to the back sight, then in the Quick Survey program of TS06 or TS06+ set the bearing to the one you just calculated then press OK. You must make sure you have sighted to the back sight before pressing OK. Bearing will be on hold until OK is pressed. On the Quick survey which is outside the main programs if you click on the arrow (F4) twice you will get to Set HZ, here you can set bearing to zero or any other angle. Reza Nobakht
thank you for much for the patience !george
thanks Teacher you do good explain and clear speak
Thanks for your feedback Maqa,
thanks from iraq
My pleasure
Thanks
موفق باشی
Thanks
If you edit fixed points after making observation , the measured points automatically change ??? Thanks a lot.
thank you for good explication thank you very much
My pleasure
Hi I have a problem, I have a total station Leica TS07 of 1 second and I try to connect with the phone via bluetooth but I have a problem after I put the pin in the phone to do the pairing with the station, the message does not appear on the station yes I accept the phone to connect to the station, and on the display I still have the bluetooth sign with the sign! . I mention that I gave a reset to the station and I deleted all the jobs and still does not go, does not show me that prompt message on the station.
Thanks
Please contact Leica help desk, they are great
perfect explain
Thanks Ramin, its great to hear form viewers in Iran. Reza Nobakht, Director
Jaise Hamare ko new plot Milta Hai Kahin to uski nothing set Karke a start Kiya Jata Hai vah bataiye
Good morning sir please am in africa cameroon and living in a remote area access to this technology in not easy. So can you help?
How set out points road project using Leica TS06 +data manager
Please use the referencece arc and line program
Please send me how set up back sight point
Hi Sulleyman, the easiest way of setting up back sight is actually manually work out bearing from the station to the back sight point using a calculator or spreadsheet, then sight to the back sight, then in the Quick Survey program of TS06 or TS06+ set the bearing to the one you just calculated then press OK. You must make sure you have sighted to the back sight before pressing OK. Bearing will be on hold until OK is pressed.
On the Quick survey which is outside the main programs if you click on the arrow (F4) twice you will get to Set HZ, here you can set bearing to zero or any other angle.
Reza Nobakht