I am from Pakistan and literally no one here explain that much well.Lots of love and i appreciate your work. Also Hope that you will make more informative videos related to Civil engineering in future that me and thousands of other poeple can get benefits from them.
Thanks for the video. I want to ask. What about if you do not have any coordinates information, how do you begin survey especially to know the topographic levels?
Hi, create your own local coordinate system, set a random north direction, and do your survey, then later, either get a GPS to locate the national grid coordinates of your stations, or, find existing stations with site coordinates, they are usually on the topographic drawings, or alternatively give the client your own survey as it is.
I am from Pakistan and literally no one here explain that much well.Lots of love and i appreciate your work. Also Hope that you will make more informative videos related to Civil engineering in future that me and thousands of other poeple can get benefits from them.
Best setting out tutorial videos on youtube.
Thanks Philip, just to let you know that we now offer Level 3 Diploma in Engineering Surveying with CSCS Gold card
Fantastic tutorial "Thank you Sir".
Glad it was helpful!
Thank you sir
The video is very helpful
I have a question can you contrast the effects of using a total station and differential. GPS in setting out
GPS is great for surveying and setting out external works, ground works, etc.
Thanks for the video. I want to ask. What about if you do not have any coordinates information, how do you begin survey especially to know the topographic levels?
You transfer them from known Benchmarks, using total station n GPS.
@@KIZZBATABOL no level loop?
You can use GNSS receiver with PPP, CORS or NTRIP depending on your needs
Set autonomous base, run 30sec static/opus for minimum 4hrs. Get a solution, run a level thru all occupied control, be happy.
Hi, create your own local coordinate system, set a random north direction, and do your survey, then later, either get a GPS to locate the national grid coordinates of your stations, or, find existing stations with site coordinates, they are usually on the topographic drawings, or alternatively give the client your own survey as it is.
❤❤❤❤❤
Did any one found a job with this calification (finshely college)
If your doing leveling of 100sq mter how many trips of Mariam enter
You should use Total stations for levelling large areas
i real like it but voice is very low, thus i failed to hear well via my phone
Thanks for your comment, I will shortly add new videos.
Reza Nobakht, FCIM
Director
fantastic tutorial videos on TH-cam
Thanks
Clear colective knowlodge. Nice.
Thanks for your feedback
I need a help
please let me know what you need help with
Life saver
Thanks
Hello
Hi, how can I help you?
قناه جيده ونرجو المزيد بالعربي
Thanks
Good College
Thanks for your feedback
the best one
Follow us on Instagram @finchley college
For more information about our courses go to www.finchleycollege.com