Asiagroup | Terex AC1000 HA50 luffing | Luffing Installation
ฝัง
- เผยแพร่เมื่อ 17 ธ.ค. 2024
- Here we have Asiagroup's Terex AC1000 configured with the HA50 50m boom and with luffing jib fitted and was deployed to lift roof trusses for the church project. This was filmed back in 2015.
This is Part 2 of 3 videos. This segment shows the installation of the luffing jib of the crane.
Watch Part 1 here:
• Asiagroup | Terex AC10...
Subscribe to my channel!
/ sgheavyvehicles
To see more photos of such heavy cranes in action, please visit my good friend’s page on Flickr too!
flickr.com/pho...
Very nice video brother thanks nice crane job very very good
Belo equipamento. Parabéns. 🇧🇷
I ❤️❤️❤️ mobile crane 👌🏻👌🏻👌🏻👌🏻👌🏻 good job
great job, but one tip, most videos show the mast & jib being erected FIRST, leaving the hook on the ground!, then raising the hook block!- is it because the weight is not rated while the mast is not in 'erect position', aka valid load charts??
The boom and jib has to be assembled first. Only then, can the hoisting rope be treaded over, and reeving of the hook can then begin.
thanks, very interesting video!)) now I will watch your videos
Wow you guys need to take better care of your cranes.
Examples grease boom pins or at least carry some inox marine spray.
And slow down best jobs are done smoothly
Stay safe brothers of the hook 🪝
Awesome 👏🏻👏🏻
Thanks man
Wow
I seem to think these foreman and supervisors are really picky and bossy. I see that the worker's aren't even done putting in the boots and these guys are already moving the crane around before it's even set. @12:55
🤓🙋♂️👍
My datok atek working don play play ahhh
印度人馬來人說國語!