Second Garston bridge removal ( crane set up )
ฝัง
- เผยแพร่เมื่อ 28 พ.ค. 2019
- This was the start of part two to remove and replace the church road rail bridges in Garston Liverpool, a special crane and lifting gear was brought in due to over head lines.
More Videos from this job. • Garston rail bridge Re...
Why didn`t that truck at 11.30min drive in there backwards? Lifting that track over his cab aint safe working..This isn`t realy a Professional way of working at all..
Great job, you cover each and every aspect of the action, plus you caught all the railroad action. For a railfan, I couldn't ask for more.
Thank you always wanted to see one of these put together.
Well done, great photography, almost like being there combined with the noise of the diesels ticking over. Thankyou, Bob, New Zealand.
Nice video Paul. Wonder what soft of safety record Ainscough have.
Nice camera work Paul! Very patient :-)
Absolutely fantastic video. Great work all around.
Soy conductor y transporte un saludo desde República Dominicana para ese gran equipo
Very fine ihave seenthis vedioo what a wonderful thanks to tele cast
Thank you for sharing video
Great machines guys, good job 100%.
Im back up liverpool next week going to have a look at the progress made since my last visit. Without a drone a trip up the liverpool one tower seems to give a good perspective even though a distance away
Great video. Those cranes are fairly easy to put together just big and heavy bits . Myself a rigger and crane driver used to put together 250 and 300 ton crawler cranes in 3 to 4 days worst part was reeving the hook a truly horrible job
That is one huge machine!
These lads do a proper job
I've seen similar size Bridges lifted with smaller craines so why the big one interested to know what other things determine what type of crain is needed grate video
good job
When you need a big crane to assemble a bigger crane, you know it’s going to be an interesting lift.
Eselente trabalho
Thanks for sharing