Hi, he is hammering in the anchors into the ground and then bolting them to the legs of the swing set. The anchors keep the swing set from rocking but I recommend digging 6 inches into the ground where the legs come in contact with the dirt, adding the anchors and you are good to go. Thanks for watching!
What was he hammering at the swing set base... the feet?
Also - is he worried at all that the swing set will bend sideways?
Hi, he is hammering in the anchors into the ground and then bolting them to the legs of the swing set. The anchors keep the swing set from rocking but I recommend digging 6 inches into the ground where the legs come in contact with the dirt, adding the anchors and you are good to go. Thanks for watching!