I hope this video helpful to all Billing Engineers, Note - Height of Slab considered for both case from the Bottom / Soffit of Slab. Don't forget to like this video, thank u
Sir thank you so much , thanks for your valuable information, My another request that pls make a series regarding escalation with full details and secured advance and recovery , step by step with model excel file
Sir, great explanation. I have one issue for billing. If contract is given in built up area and contractor claiming extra height (contract height- 10' 5"& workdone HT 14') then how to resolve . Contractor claiming b/u area rate x 30% extra.
Suppose, in drawing the lift well is to be closed with slab at suppose 5th floor level and if contractor uses some other method (jugaad) for staging of 5th floor slab from intermediate suppose 4th floor slab by arranging and positioning ISMB, ISC etc according to his convenience rather than conventional method to setup scaffolding from Ground floor level, then whether contractor is payable for extra height or not, and if yes then upto which height? Your suggestion and comment will really be grateful.
Sir slab height 4.2 hai G.L to 1st floor top slab level but between G.L to 1st floor slab Mezzanine floor slab hai 2.1 m p sir..... To contractor ko kya 1st slab k jo v area hai ahyega wo double area kr k dena hoga??? Ya single area dena hoga RCC contractor ko sir. Aur mezzanine floor ka payment kaise dena hota hai sir RCC contractor ko.... please please make 1 video on this sir
I hope this video helpful to all Billing Engineers, Note - Height of Slab considered for both case from the Bottom / Soffit of Slab. Don't forget to like this video, thank u
yeah sahi bataya apne M3M me bhi shuttering ki yeahi unit extra item ki
In our project we claimed it but I wasn't aware about cpwd guideline. Thank you for sharing this.
Thank u so much sir, No. 1 channel for civil engineers
Sir,
it's Very useful knowledge
🙏🙏🙏
Very informative video, I requested you about this topic in your QnA session. Finally you made this for all of us.. Thank you. 🙂
Sir thank you so much , thanks for your valuable information, My another request that pls make a series regarding escalation with full details and secured advance and recovery , step by step with model excel file
I have already uploaded video..check in playlist
Love you sir ❤️❤️❤️ thanks
Thank you sir , keep going
Thanks sir ji
Thank you sir
Thank you so much for this video
very good video just explain the Plain area Is is it covered area or we can consider balcony in plain area
Thanku sir very nice video
Sir sloped RCC slab mein shuttering rate different hoga ?
Great Work...🙏👌
Nice & effective.
Nice video sir
Thank you
Thanks 🙏
If internal beam is also incude in the height upto 4m then side shuttering of beam is also claimed or not?
Sir,
We wait for you......
Really
Sir me Example- plaster repair for 1.2 RMT than how to rate analysis
Slab Back propping is payable in extra item?
How to claim additional height for brick and plaster work for scaffolding as per CPDD... please explain how would I claim in bill
Please make one video on how to do costing of glass in facade.
Sir material and labour escalation pe video banaiye
thanks ,sir
Sir me ne ek unit dekhi the site ki boq me board ki ( per cm depth per 100m) please ise easy way me explain kro muje samj nhi aarha hai
Sir can we claim extra height for column shuttering
Namaste sir
Can i claim extra rate for brick work & plaster work when height exceed 3.60 m
Thanks sir, is there as document proof for same to measure the height from slab bottom as cpwd language say floor height means slab top to slab top
Column ka size deduct karna hai ya nahi jab hum extra slab height m shuttering claim karte hai toh
No
For sloping slab how to calculate
Sir, great explanation. I have one issue for billing.
If contract is given in built up area and contractor claiming extra height (contract height- 10' 5"& workdone HT 14') then how to resolve .
Contractor claiming b/u area rate x 30% extra.
Please tell me extra height specifications details
Suppose, in drawing the lift well is to be closed with slab at suppose 5th floor level and if contractor uses some other method (jugaad) for staging of 5th floor slab from intermediate suppose 4th floor slab by arranging and positioning ISMB, ISC etc according to his convenience rather than conventional method to setup scaffolding from Ground floor level, then whether contractor is payable for extra height or not, and if yes then upto which height?
Your suggestion and comment will really be grateful.
Not applicable for this case
Sir how do we claim extra height for column only .
How to measure Double Scaffolding for payment as per cpwd
Sir 9m hight slab covered area rate shuttering and steel 30 floor residents tower
Claim ka format kaise bnega sir?
Can we claim chajja or any other projections in additional height (not asking about balconies) ?
Yes u can
@@FactualCivilEngineering is it written on any book as i haven't seen anywhere in any codes.
Sir, how to Claim all extra itmes of the project.pls make vedio on this topic
Sir height kese bdegi agr 3500 hi rkhni h to kese jyada height ho jayegi
Narayan Bless you
Niceee..
Vacancy ka koi info dijiye plz
Sir their is difference in measurement in 1st option and 2nd option.kindly clarify the height to be measured it's from slab bottom or top of slab.
From bottom of slab.
Thank you sir, but how you have taken 150 rs. Could you pls tell....
Sir slab height 4.2 hai G.L to 1st floor top slab level but between G.L to 1st floor slab Mezzanine floor slab hai 2.1 m p sir.....
To contractor ko kya 1st slab k jo v area hai ahyega wo double area kr k dena hoga??? Ya single area dena hoga RCC contractor ko sir.
Aur mezzanine floor ka payment kaise dena hota hai sir RCC contractor ko.... please please make 1 video on this sir
how i contact you?
Mivan me starter bhara jata hai
How to claim Extra for R.C.C./ B.M.C/ R.M.C. work above floor V level for each four floors or part thereof.
🙏🙏🙏🙏🙏🙏🙏
Earth work per meter depth , bataiye sir
Supv sir
Cum.mai bhi hote hai additional hight
tpoic not clear
Urgent required
Thank you sir
Thank you