  • @pratiktilekar7246
    @pratiktilekar7246 4 ปีที่แล้ว +7

    From india; thank u sir this was so knowledgeable 🖒👍

  • @engineeringworld55
    @engineeringworld55 5 ปีที่แล้ว +1

    may yahi dhund raha tha bhi you tube me bhot din se
    aur ye mil gya kayse sukriya karun aapka may for these video
    thank you very much best video in tmt rainforce ment

  • @rkayakkal1991
    @rkayakkal1991 2 ปีที่แล้ว +8

    Top extra bars that resist negetive bending moment at supports should be anchored in to the column to a length of 50D.

  • @arnavdasaur2577
    @arnavdasaur2577 4 ปีที่แล้ว +6

    Your videos are very informative!
    I have a query, Is it the R/F of beam on the shorter span which will be laid first and then comes the R/F of beam on the longer span above it? Is there any thumb rule about layering of Reinforcement which one will be laid first and which one over it?

    • @Civilwork123
      @Civilwork123 2 ปีที่แล้ว

      Bhai Jaan Amar Channel Duke Video Na Dekhle Thakte Parben na
      #allvideogamingvideo

  • @Nikesh977
    @Nikesh977 4 ปีที่แล้ว +1

    Why not providing development length for extra bars? Is it because of its difficult to bend so many bars at one joint? It was the same way in drawing too?

  • @Zahid40500
    @Zahid40500 4 ปีที่แล้ว +1

    Dear good effort. Should we not bend the stirrup at 135 degrees.

  • @mdraheem6625
    @mdraheem6625 6 ปีที่แล้ว +1

    I hit on like button by pausing video at 2.58 just by seeing your effort😍

    • @umerjaved5764
      @umerjaved5764 4 ปีที่แล้ว

      Full Road construction procedure step by step:
      Important vedio for Site Engineer.
      Watch this vedio in Urdu/Hindi.
      th-cam.com/video/tYsKQnpaU38/w-d-xo.html

  • @imamkhan1344
    @imamkhan1344 6 ปีที่แล้ว

    Sir I have question related to slab bar if contractors apply mobil on slab centring so that bar also become oily it's good for bar or not . plz reply soon .....

    • @FORYOU1
      @FORYOU1  6 ปีที่แล้ว

      Oily bar is not good

  • @EngrTechMisbahUllah
    @EngrTechMisbahUllah 4 ปีที่แล้ว

    i hve some technical question . bro is it necessary to provide hook to anchor bar and not to main bar that u say that not provide to negative bar plz check it out

  • @buliding_basics
    @buliding_basics 5 ปีที่แล้ว +8

    Sir, why there is no 135° hook in stirrups??

    • @PrashantPatel0042
      @PrashantPatel0042 5 ปีที่แล้ว +2

      Because labour cost get increse and if you complain about that to your contractor then you ll loose job and you came at one point that you have to stay at home only.
      It's really hard to stand against uneducated powerfull person, they ll kick you

    • @ConstructionTechandVlogging
      @ConstructionTechandVlogging 4 ปีที่แล้ว

      That's not the case. If zone 2 we can provide but it is always good to provide hooks at 135°. Contractor has nothing to do with the code compliance.

  • @chennareddyindla2349
    @chennareddyindla2349 4 ปีที่แล้ว +1

    Very good. Explained well.

  • @tanmoymondal73
    @tanmoymondal73 ปีที่แล้ว

    Hello sir my name is Tanmoy Mondal from West Bengal.
    In secondery Bea support portion extra top bar are provided it's true or rong

  • @azimmalpekar9916
    @azimmalpekar9916 6 ปีที่แล้ว +4

    All top bars ending in column must have bends equal to development length to be effective. Some top curtail bars have not been provided with bends which makes them ineffective and useless

  • @rnawaz92
    @rnawaz92 4 ปีที่แล้ว +1

    Very informative video but i have one question
    Do beam stirrups require bend if yes then your beams stirrups have no bend plz calrify

  • @VlogwithNumanSK
    @VlogwithNumanSK 3 ปีที่แล้ว

    MashaAllah outstanding job sir keep it up

  • @hcnobin
    @hcnobin 5 ปีที่แล้ว +2

    very informative thanks you very much for your video uploading

  • @rayanbandara7899
    @rayanbandara7899 4 ปีที่แล้ว

    Meay sri lanka sey dekthahu.
    Achcha hey teek hogiya

  • @IqbalAhmed-e6h
    @IqbalAhmed-e6h 4 หลายเดือนก่อน

    Very Nice. Lecture. Thanks sir. For remind me

  • @muhammadsamofficial1076
    @muhammadsamofficial1076 4 ปีที่แล้ว

    Sir I want to know I can't saw crank bar bent up from upper face to bottom face and there is also not provided hook

  • @pramodtambat6134
    @pramodtambat6134 6 ปีที่แล้ว

    Look at the both sides of column steel, beam steel is not straight but going down. Will it not create trouble after casting of beam?

  • @nisarahmedandco8650
    @nisarahmedandco8650 4 ปีที่แล้ว +1

    Nice work and great information

    • @Civilwork123
      @Civilwork123 2 ปีที่แล้ว

      Bhai Jaan Amar Channel Duke Video Na Dekhle Thakte Parben na
      #allvideogamingvideo

  • @mohammedyaseen1839
    @mohammedyaseen1839 6 ปีที่แล้ว +6

    sir in my opinion u should also add some pictures at some points showing the clear picture how beam joins the other if possible ..as the movement of camera in video will be way fast to understand..

    • @Civilwork123
      @Civilwork123 2 ปีที่แล้ว

      Bhai Jaan Amar Channel Duke Video Na Dekhle Thakte Parben na
      #allvideogamingvideo

  • @nicesweetcake7767
    @nicesweetcake7767 6 ปีที่แล้ว

    One good thing is that we can still catch some key english words. nice work, thanks for sharing!

  • @punitswarnkar1430
    @punitswarnkar1430 5 ปีที่แล้ว

    Sir kya ye beam aise hi rahega ya niche jaega i mean agr slab casting hui to bahut jyada beam ke height tak cast krna padega kya??

  • @karanroy7865
    @karanroy7865 6 ปีที่แล้ว +1

    Beam and column junction specially at end, Ld ( Development length in tension) apply nahi Kya gya...Which is most important for seismic point of view...btw thanks for this video...

  • @mikesardea3809
    @mikesardea3809 4 ปีที่แล้ว +2

    thanks for the video. but, i think the lateral ties at the beam-column joint should be much closer. seismic hook is also not provided.

  • @matloobawan823
    @matloobawan823 4 ปีที่แล้ว

    What are the arrangements of steel once beams cross each other.what way beam will take load.regards dear

  • @tehseenullahafridi3580
    @tehseenullahafridi3580 5 ปีที่แล้ว

    Sir can I use 12 mm bar in beam of 10 feet span where I want to give stirrups c/c 6" and , 3 bars in bottom and 3 in top and 2 extra bars in sides ??? Answer me plz

  • @mmkdma
    @mmkdma 5 ปีที่แล้ว +1

    Brother app ne jo beam main stirrups use kie hain. corners pe un ki spacing kam or mid main zyada hai.
    Please guide us about that...??

    • @RAJATKUMAR-nu2ph
      @RAJATKUMAR-nu2ph 5 ปีที่แล้ว +1

      Mid me less shear force and corner pe jyada shear force.. hota h

  • @Gajenswargiary
    @Gajenswargiary 5 ปีที่แล้ว

    Sahi mai ye video Mere liye bahut hi helpful rha.. thanks

    • @umerjaved5764
      @umerjaved5764 4 ปีที่แล้ว

      Full Road construction procedure step by step:
      Important vedio for Site Engineer.
      Watch this vedio in Urdu/Hindi.
      th-cam.com/video/tYsKQnpaU38/w-d-xo.html

  • @scientasticguru6861
    @scientasticguru6861 4 ปีที่แล้ว

    Sir,
    Column me jo ties dete he, unki hook ki position kese deni chahiye?
    Kya hum 4 sides me alternate de skte he ya fir 2 sides me alternate only.
    And same doubt for beam stirrups too.
    Shukriya sir.

  • @zakirzaki6260
    @zakirzaki6260 5 ปีที่แล้ว +3

    Hi brother information about Construction joint and earthquake joint very important
    Thanks

  • @valahn1712
    @valahn1712 6 ปีที่แล้ว +30

    Can you say it in English or make subtitle.. it'll be very useful for some of us..

  • @L145channel.
    @L145channel. 3 ปีที่แล้ว

    Mantap sekali bang ❤️👉👉💯💯💯👍👍

  • @aakanshaggarwala878
    @aakanshaggarwala878 6 ปีที่แล้ว

    Cranked bars are provided at top or bottom of beams ?

  • @akbarmover6227
    @akbarmover6227 3 ปีที่แล้ว

    Masha Allah very nice video
    Im Indian

  • @kiransahu9339
    @kiransahu9339 5 ปีที่แล้ว

    By bar arrangement how will we know whether it is fixed support or hinge support

  • @premdhami9233
    @premdhami9233 4 ปีที่แล้ว +1

    stirrups are not bend in 135° Its more important in earthquake and if extra bars are bend same like main bar at the end of column its good

    • @civilbrains
      @civilbrains 4 ปีที่แล้ว

      th-cam.com/video/5yNmlBEJnNI/w-d-xo.html

  • @UltimateGuruGaming
    @UltimateGuruGaming 3 ปีที่แล้ว

    Hmen kese pta chalega ke knsa beam rest karega dusray beams pe. I meant beams ki rebars dusra beam pe rest krti hain. Longer beam shorter pe rest krti ya wise versa ?

  • @jmspacerwillfixforthat8045
    @jmspacerwillfixforthat8045 6 ปีที่แล้ว

    Are those lapping for columns are in the lapping zone?

    • @michaelgu9907
      @michaelgu9907 3 ปีที่แล้ว

      Hahaha it so bad my work😅

  • @noushadkhan5294
    @noushadkhan5294 6 ปีที่แล้ว +5

    Helpfull sir...goodjob👍

  • @lapakana
    @lapakana 2 ปีที่แล้ว

    My question : I have 6 continuous 12 mm rods in beam. What if i bend 4 side rods in 'c' or 'u' shape (180 degree) and 2 mid rods in 'L' shape (45 degree) ?

  • @syedmahmood2372
    @syedmahmood2372 4 ปีที่แล้ว

    In Continuous Beams where we should give overlapping in compression zone and in tension zone as Per standards and codes ❓❓

  • @bloxyboy3777
    @bloxyboy3777 4 ปีที่แล้ว

    Why stirrup hook has not bent to 135 degree. Stirrup makes no sense what you have executed at present beam.

  • @dr.ajaysarkar5652
    @dr.ajaysarkar5652 6 ปีที่แล้ว +5

    Thanks for the video learn about the bar arrangement of abeam . the movement of the camera should be slow to follow aand understand thebar arrangement. I am going to construct a tie beam of about 16 ft length and 15 inch height and 10 inch thickness . If I use 16 mmTiscon bar , how the bar should be arranged ? Show me in cross sectional view.

  • @laxmansoren3000
    @laxmansoren3000 4 ปีที่แล้ว

    Wall side Beam me slab bar crank hona jaryri hai yaa nahi please reply ....

  • @Believer232
    @Believer232 6 ปีที่แล้ว

    Sir... mid column beam junction m 90 degree bend dena ya lap deke aage badana

  • @usmansumbalactivity
    @usmansumbalactivity 4 ปีที่แล้ว

    Sir
    Agr two columm 18/18 ka ho to ak colum sa dosra colum ka distance kitna hona chaya?

    • @civilbrains
      @civilbrains 4 ปีที่แล้ว

      th-cam.com/video/hzhVwP0LKBs/w-d-xo.html

  • @cybersecurity3
    @cybersecurity3 5 ปีที่แล้ว +1

    Thank you. I have one question. I have removed front side one colume, is there any effects on total building structure?

    • @kidslearninguni56
      @kidslearninguni56 4 ปีที่แล้ว +1

      Its depends on length between two coloumn&load

    • @kidslearninguni56
      @kidslearninguni56 4 ปีที่แล้ว +1

      You need to check the design and do discuss with your sinior

    • @cybersecurity3
      @cybersecurity3 4 ปีที่แล้ว

      @@kidslearninguni56 thank you sagar Ji..

  • @souravbhandari7348
    @souravbhandari7348 4 ปีที่แล้ว

    please tell me the difference between the top extra support bars and side support bars in a beam...

  • @maskratnaratna7240
    @maskratnaratna7240 6 ปีที่แล้ว +1

    Thank you sir...good knowledgeable video..

  • @mahesharya3030
    @mahesharya3030 4 ปีที่แล้ว

    kya jab ground floor pura car parking k lia open rakhna ho to bar extra dalte hai kya

    • @civilbrains
      @civilbrains 4 ปีที่แล้ว

      th-cam.com/video/5yNmlBEJnNI/w-d-xo.html

  • @shivdeyal6815
    @shivdeyal6815 6 ปีที่แล้ว +12

    सर आप बहुत अच्छे से और समझाने की कोशिश करे जाहा पर आप समझाते हो वहा पर विडियो को और भी अच्छी तरह से देखाने की कृपा करे I सर मुझे सीढ़ी बनाना नहीं आता सीढ़ी बनाने के लिए सीढ़ी का गणित समझाये (a टू z) ऐसे समझाये की एक नार्मल से नार्मल मिस्त्री भी सीढ़ी का नक्शा निकाल के सीढ़ी bana सके। thank you sir.

  • @vishvajeetsingh9239
    @vishvajeetsingh9239 6 ปีที่แล้ว

    bind is necessary on end point or not??

  • @psktechandnature8650
    @psktechandnature8650 5 หลายเดือนก่อน

    🎉thanks sir ye hi to chahiye tha muze .sir slab mesh wala batayiye aur foundation mesh aur leg kitna kya lena he batayiye

  • @DeepakShukla-gy2rr
    @DeepakShukla-gy2rr 6 ปีที่แล้ว

    Pls tell what size of bars are used in tie beams & in footing.

  • @seuaoleaupepe7057
    @seuaoleaupepe7057 2 ปีที่แล้ว +2

    That’s easy mate

  • @nagdow5042
    @nagdow5042 6 ปีที่แล้ว +1

    hello very nice video.However one question-is there enough at the column for adequate amount of concrete as it appears very compact?

  • @shirish367
    @shirish367 6 ปีที่แล้ว +9

    Why don't you make video on rooftop waterproofing.

  • @phyohtetkoko929
    @phyohtetkoko929 5 ปีที่แล้ว +3

    Noted, thank you sir 👍

    • @umerjaved5764
      @umerjaved5764 4 ปีที่แล้ว

      Full Road construction procedure step by step:
      Important vedio for Site Engineer.
      Watch this vedio in Urdu/Hindi.
      th-cam.com/video/tYsKQnpaU38/w-d-xo.html

  • @bhawaniantarvedi4099
    @bhawaniantarvedi4099 5 ปีที่แล้ว +1

    Sir supporting bar 90°pe bend end connection pe hi kyu kia jaha dono taraf se bars aarhi..??
    Starting mai to sirf main bars ko hi bend kia tha aur supporting ko straight choda tha..

  • @nejamuddinshaikh596
    @nejamuddinshaikh596 6 ปีที่แล้ว

    Sir
    Mera ghar me total 12 kollam diya gaya hai
    Or place hai 23 phut by 20 phut ka
    12 kollam me 10mm ka 4 br diya gaya hai . So please sir mujhe zankari chahiye
    ki ish me Kitna manzil upar leza sakte hai

  • @j.schannel3898
    @j.schannel3898 6 ปีที่แล้ว

    Plainth beam ki cornr mai bar ko l shape jo diya hai wo agar 1inch short ho jaye to koi dikkot hoti hai kya aur, extra ghar banane k e liye plinth beam nikal ke jo rakte hai wo kya L shape deke rakh na chahiye ya fir aise histraight, aur kitni lambai mai rakhni chahiye

  • @dominicvillanueva7493
    @dominicvillanueva7493 4 ปีที่แล้ว +4

    Ideally the L bend for all the beam bars should point downward that is to have the best anchorage to the column.

  • @rahmathullah5280
    @rahmathullah5280 6 ปีที่แล้ว +1

    sir , please make your videos in good clearity....thanks

  • @Jaagtahindustan
    @Jaagtahindustan 5 ปีที่แล้ว

    Kon si company ki bar h

  • @ForensicCats
    @ForensicCats 5 ปีที่แล้ว

    The shear at the center spam column appears lacking...

  • @dhrubajyotibora2180
    @dhrubajyotibora2180 4 ปีที่แล้ว

    What is transverse reinforcement. Spacing@125mm c/c

  • @rajavelvino
    @rajavelvino 6 ปีที่แล้ว +3

    Really very nice but if can possible please post English translation very useful for other race people thanks

  • @sudiptaduttaroy3370
    @sudiptaduttaroy3370 3 ปีที่แล้ว

    Outside portion of column clear space is 40 mm and beam clear space is 25 mm then how does it maintain both in column beam junction ? Pl. Clarify?

  • @claypot699
    @claypot699 6 ปีที่แล้ว

    Bhai plz yeh bta dyn k kya 20 ft tk beam agr rakhna hoo too hmy kitni baar beam dalni chaey r colum kitny by kitny ka hoo.

  • @maiyuri7921
    @maiyuri7921 4 ปีที่แล้ว +2

    Can you provide an english subtitle for your videos? I really want to know what you're saying.

  • @amitkumarsah9435
    @amitkumarsah9435 4 ปีที่แล้ว

    Dont u know that hook in stirrup should be at 135deg?

  • @nandkishore3045
    @nandkishore3045 ปีที่แล้ว

    What will be when beam length more than 40 feet as bar length only 40 feet.

  • @karthiks8010
    @karthiks8010 6 ปีที่แล้ว

    Sir I need design 19ft width 39ft length, high 18fts need to cover full roof no walls only need to cover with help of columns can u design steal for both columns bems n roof pls

  • @shabirshaikh1559
    @shabirshaikh1559 5 ปีที่แล้ว +1

    Sir mai lebar Thekedar hon sir ek beam 27 fite colume se sentar to sentar hai length kitna hona aor bare kitne mm hona chahiye please ripley

  • @anilsaroj666Official
    @anilsaroj666Official ปีที่แล้ว

    Bhai ye batao beam ke neeche approxe 1fit ka dig kyo hota hai, ekdam flat kyo nahi rakhte hai slab ke....

  • @AmarKumar-pf4vv
    @AmarKumar-pf4vv 6 ปีที่แล้ว

    Sir beam will be under the slab...why in this case beam is designed on slab or above the slab

    • @infotone2061
      @infotone2061 6 ปีที่แล้ว

      clapping for your question ...

  • @lisadas698
    @lisadas698 4 ปีที่แล้ว

    Bina chhath dale ghar banwa chuki hun aur ab usse ghar ko tode bina chath dalwana chahti hun lekin koi column yeah beam Diya hua nahi hai chhath kaise dalvaien please reply

  • @vishvajeetsapkal6664
    @vishvajeetsapkal6664 5 ปีที่แล้ว

    Good sir achchi jankari hai ,sir four bar yane main Bai hai kya

  • @civilworksvideos248
    @civilworksvideos248 5 ปีที่แล้ว

    can you explain about the lap provide .. mtlb ka mainBar ka lap kaha dana ha yanii kaha ja ka cut krnii ha length steel ka beam main or spurt bar ka length kaha ja ka cutt krnii ha mtlba ka column ka kaha ja ka cutt krni ha agr throughout length nahi ha hmra pass...

  • @technologygurureddy1946
    @technologygurureddy1946 4 ปีที่แล้ว

    Super work by tht builde

    • @civilbrains
      @civilbrains 4 ปีที่แล้ว

      th-cam.com/video/hzhVwP0LKBs/w-d-xo.html

  • @rkbinadevi5486
    @rkbinadevi5486 4 ปีที่แล้ว

    How many steel bar fe 550+ sd in grade beam of 5storey building

  • @gulfbuildingconstruction8353
    @gulfbuildingconstruction8353 4 ปีที่แล้ว +1

    Very good knowledge, great job

  • @buddhakishan2822
    @buddhakishan2822 6 ปีที่แล้ว

    बहुत बडिया हे सर

  • @harshshah9828
    @harshshah9828 6 ปีที่แล้ว

    How to make tender and details about some basic rate of item...

  • @navasthekumpurath7630
    @navasthekumpurath7630 2 ปีที่แล้ว

    Sooper 👌

  • @alerivera2437
    @alerivera2437 5 ปีที่แล้ว

    No le entiendo nada pero x la imagen de su armado buen trabajo sólo me gustaría q el alambre con q amarran sus estribos fuera más grueso

  • @Nathokimaya
    @Nathokimaya 6 ปีที่แล้ว +1

    sir 24×28 era me 24 feet wala era latak beem dalna hoto ..ham usme kase sariya lagaye ge

  • @shyamkumarmehra7323
    @shyamkumarmehra7323 ปีที่แล้ว

    Extra bar ki length l/3 or l/4 ke baad beam ki width ke aage bhi lejana h and bend sahit kitni cutting length hona chahiye please bataiye sir

  • @neeleshmishra7418
    @neeleshmishra7418 5 ปีที่แล้ว

    Sir junction pai lapping provide kar sakte hai

  • @chatpatgamingyt2707
    @chatpatgamingyt2707 2 ปีที่แล้ว

    Beam cover is being 2", does it make any sense?

  • @johnsafi1104
    @johnsafi1104 5 ปีที่แล้ว

    This was pretty good, but it could have been more effected by some further information,

  • @adhirajpatil1726
    @adhirajpatil1726 6 ปีที่แล้ว

    Make videos on installation of WC, water proofing , painting

  • @manojniwal5758
    @manojniwal5758 6 ปีที่แล้ว

    How to calculate the curtail length of extra top and bottom bars.... Sir please answer it

  • @aliasgarchallawala8852
    @aliasgarchallawala8852 5 ปีที่แล้ว

    Hello,....boss beam ke end pe jo 90 °L- bend kyun lagaya jata ..hey or us bend ko na lagaye to chale...?

    • @RAJATKUMAR-nu2ph
      @RAJATKUMAR-nu2ph 5 ปีที่แล้ว

      Nhi. Agar na lagaya to bar slip hone ke chance ho sakte h

  • @shamsofficial179
    @shamsofficial179 3 ปีที่แล้ว

    Sir ye beam to niche jaayega na to phir ye beam uper utha hua q dikh rha senting mein sir please bata skte h

  • @sageerkhan6144
    @sageerkhan6144 3 ปีที่แล้ว

    Sar im saggeer plz mujha malom karna ha ka bheem kitne thik ka hona lazim ha 50bay 65 . 6 folor

  • @mariacastro7355
    @mariacastro7355 4 ปีที่แล้ว

    Why don't the struts have a 180 degrees at the ends

  • @abhirajeditingvideo3549
    @abhirajeditingvideo3549 2 ปีที่แล้ว

    Bim rod binding very nice