I 'm an inspector myself and I come back an consult these videos that Garry puts on and its all great info. Thank you Garry for taking the time out of your day to help people out.
Excellent and concise presentation and explanation , D1.1 is laid out in a less than organized manner, and it is very easy to misinterpret the meanings laid out by the code writer. This why it is important to read the entirety of the code for a full understanding. This understanding of the code you more than demonstrate, I look forward to your other videos.
Dear Mr. Harry PACE, thank you for awesome and magical practical knowledge sharing regarding prequalified wps which is part of AWS D 1.1, however I want to corrected one issue about steel quality in Turkey (Istanbul) (video time regarding with issue 28:08 ) , Turkish steel quality is much better than chinese because of my company is exported all of the our manufacturing of steel pile pipe to Europe and USA, up to now we did not face any nonconformance related with 3.1 Mill Test Certificate or any type of material nonconforma ce from our Client or Customer in USA, BEST REGARDS
wps=recipee pqr we get it i have to check every video to see if weve moved on i kinda apreciate it you are a wealth of knoledge. thank you just over repetitive
True statement - these have been put together over a couple of years and there never was a really detailed master plan. So sometimes material gets hit more than once.
well done impresive xplanation, hope you can response to my question, we have now a build up beam the flange thickness is 60mm and web thickness is also 60mm it is a CJP , the grove preparation angle is 60 degree i think it is to much already all we know the standard grove angle for tee butt joint is 30 to 35 degress is that possible or fall under any AWS clause, thank you in advance for those who can adress my concern cheers.
Hi , How do I set short arc, globular or spray transfer in a same equipment ?. Does it requires a special machine or can I do it with a regular ESAB MIG 400i cccv etc ?
@@gpacex Thanks ,By chance is there any standard reference from where we can get those values directly ?. I am looking to weld 20 mm low carbon steel plates in a tee joint filled weld. Appreciate your help...
Hi, A small query. Electrode dia is an essential variable for pre-qualified WPS. Can I use multiple diameter in a WPS which is less than the Max dia allowed. Example for SMAW, 2.5/3.2 in a WPS or separate WPS for each dia? Thanks
@@arjunbabuchala I'm a little late but if you ask 5 different people you will get 5 different answers, but general short circuit is 18-22 volts/7525 gas and globular is 22-28v/7525 gas and spray is 28v and above min 80% Ar mix
Dear Garry Pace I am making a WPS in acordance with D1.1 but I encounter a hard situation that dont know where in D1.1 I shall follow Could you please give me an advice or instruction My WPS I have to make: + Position: 2F + Materials: Plate A36 +Round bar S45C + Method: FCAW Thank you so much
I’ve been looking everywhere for a video JUST LIKE THIS haha thank you!!
I 'm an inspector myself and I come back an consult these videos that Garry puts on and its all great info. Thank you Garry for taking the time out of your day to help people out.
Excellent and concise presentation and explanation , D1.1 is laid out in a less than organized manner, and it is very easy to misinterpret the meanings laid out by the code writer. This why it is important to read the entirety of the code for a full understanding. This understanding of the code you more than demonstrate, I look forward to your other videos.
Thanks for all the excellent videos!
Full of information and very well explained!
IS2062 250BR which Group Assume please clarify
Thank you for sharing your knowledge, this video is very good and I'm sure it will help many professionals, just like it helped me.
Success friend
Dear Mr. Harry PACE, thank you for awesome and magical practical knowledge sharing regarding prequalified wps which is part of AWS D 1.1, however I want to corrected one issue about steel quality in Turkey (Istanbul) (video time regarding with issue 28:08 ) , Turkish steel quality is much better than chinese because of my company is exported all of the our manufacturing of steel pile pipe to Europe and USA, up to now we did not face any nonconformance related with 3.1 Mill Test Certificate or any type of material nonconforma ce from our Client or Customer in USA, BEST REGARDS
Thanks a lot ! Garry , it is very interesting information. Regards from Perú.
Very well presented. Thanks Gary
wps=recipee pqr we get it i have to check every video to see if weve moved on i kinda apreciate it you are a wealth of knoledge. thank you just over repetitive
True statement - these have been put together over a couple of years and there never was a really detailed master plan. So sometimes material gets hit more than once.
well done impresive xplanation, hope you can response to my question, we have now a build up beam the flange thickness is 60mm and web thickness is also 60mm it is a CJP , the grove preparation angle is 60 degree i think it is to much already all we know the standard grove angle for tee butt joint is 30 to 35 degress is that possible or fall under any AWS clause, thank you in advance for those who can adress my concern cheers.
Thanks Gary
excellent presentation, thank you.
Can you please share a video on AWS VS ASME welder & WPS qualifications?
Which one we have to prepare first? WPS or PQR?
Saan dito sa pilipinas makuha ang d1.1
amazing video thank you for this!!
AWS WQT & ASME WQT Both are same or different?
Hi , How do I set short arc, globular or spray transfer in a same equipment ?. Does it requires a special machine or can I do it with a regular ESAB MIG 400i cccv etc ?
It is by cranking up the voltage - you will need a shielding gas with a minimum of 80% argon for spray transfer.
@@gpacex Thanks ,By chance is there any standard reference from where we can get those values directly ?.
I am looking to weld 20 mm low carbon steel plates in a tee joint filled weld.
Appreciate your help...
Hi,
A small query.
Electrode dia is an essential variable for pre-qualified WPS. Can I use multiple diameter in a WPS which is less than the Max dia allowed. Example for SMAW, 2.5/3.2 in a WPS or separate WPS for each dia?
Thanks
@@arjunbabuchala I'm a little late but if you ask 5 different people you will get 5 different answers, but general short circuit is 18-22 volts/7525 gas and globular is 22-28v/7525 gas and spray is 28v and above min 80% Ar mix
Dear Garry Pace
I am making a WPS in acordance with D1.1 but I encounter a hard situation that dont know where in D1.1 I shall follow
Could you please give me an advice or instruction
My WPS I have to make:
+ Position: 2F
+ Materials: Plate A36 +Round bar S45C
+ Method: FCAW
Thank you so much
Google Texas welding engineering Garry Pace send me an email
My concern if i qualify prequalify wps in 3g position with backing so what will be my qualifeid positions for wps
Buy a copy of AWS D1.1 from the aws.org website. It will show you what is qualified.
WPS , PQR and WQT depends upon material thickness(plate and pipe) how will prepare?. Please provide your contact detail also
Thank you sir
Now my life becomes easy