I was asked some questions in my previous interviews, 1. Adani Realty. What are the points given in your Pour card, and Reinforcement checklist ? What do you check in concrete? What happens if 7 & 28 days results appears to be failed ? What if NDT also failed ? What if cut core is failed in compression as well ? Its a slab ..can we break it ? There are 2 other slab over it ...what will you do ? What is soil compaction ? What are the methods ? how much it is required ? > 95 % of what value ? 2. Hiranandani In what terms a skyscraper is different from a regular building apart from its safety precautions and foundation. Why use SCB and not AAC block at certain area and what is the strength of SCB ? What was the cement content of your last used concrete, what was the highest grade of concrete you've worked with ? How slump is different from flow ? What are the reasons for a pipeline choke-up? 3. L&T (my current company) How VDF and Tremix ..mis there any difference among them ? What is the procedure of VDF ? Whats the average thickness of it ? Can you pour during rain ? If no...how are you going to treat the cold joints if the rain remains continued for hours ? If yes..what are the precautions you'll take ? What is a NCR ? Is there any Difference between Observation and NCR ? What makes a NCR different from an Observation ? What are the causes of raising an NCR ? Can a Observation become a NCR ? What is the closing period of a NCR ? 4. Lodha What is QMS ? What will you do if labours are not listening to you (as a quality engineer) ? Can you give training to labours ? Can site engineers be also given training ? What is your power as a Quality Er ? Whats your purpose to be deployed on site ? What is a slab cycle ? What is your current structure's span area ? Why are you not married yet (27) ? 5. Eversendai What is concrete made up of ? As per IS 456 2000, what is the main purpose of concrete ? .. I've forgot many questions. 6. Leighton Describe complete process of footing ? Why to do dewatering ? Whay are the points to taken care of while doing a trench work and checking ? Can't recall..many questions.. Hope this help, its based on my interview throughout the years. Also i have given many small comapny interviews ..they ask very basic questions..so not mentioning it here.
Sir aap ka interview questions Bala play list pura dekhane ke baad minimum 10 tho interview attend Kiya hai sab me select kiye geya hai mere ko . All videos are very informative for the civil engineer
ques ask by ln malviya 1, what is the process of piling 2.what is the density use for bentenoide slurry for piling 3how many span are in major bridge lenght of major bridges
Gd morning sir drawing kese padhte hain uske upare ek vdo bandijiye sir main samjh nehi pa raha hun kese reading karunga please useke upar vdo banadijiye
To prop khulwa hi q rahe ho Sidha 14din per di sab ek sath khul jayega 7 din khol Diya agar beam thoda bend hua by chance to prob kya use utha payega dobara straight position me
Download PDF: 250 Interview QnA for Civil Engineers
learningtechnologyofficial.com/top-250-civil-engineering-interview-qna-for-practical-site-interview/
Thanks sir
I was asked some questions in my previous interviews,
1. Adani Realty.
What are the points given in your Pour card, and Reinforcement checklist ?
What do you check in concrete?
What happens if 7 & 28 days results appears to be failed ?
What if NDT also failed ?
What if cut core is failed in compression as well ?
Its a slab ..can we break it ?
There are 2 other slab over it ...what will you do ?
What is soil compaction ?
What are the methods ?
how much it is required ?
> 95 % of what value ?
2. Hiranandani
In what terms a skyscraper is different from a regular building apart from its safety precautions and foundation.
Why use SCB and not AAC block at certain area and what is the strength of SCB ?
What was the cement content of your last used concrete, what was the highest grade of concrete you've worked with ?
How slump is different from flow ?
What are the reasons for a pipeline choke-up?
3. L&T (my current company)
How VDF and Tremix ..mis there any difference among them ?
What is the procedure of VDF ?
Whats the average thickness of it ?
Can you pour during rain ?
If no...how are you going to treat the cold joints if the rain remains continued for hours ?
If yes..what are the precautions you'll take ?
What is a NCR ?
Is there any Difference between Observation and NCR ?
What makes a NCR different from an Observation ?
What are the causes of raising an NCR ?
Can a Observation become a NCR ?
What is the closing period of a NCR ?
4. Lodha
What is QMS ?
What will you do if labours are not listening to you (as a quality engineer) ?
Can you give training to labours ?
Can site engineers be also given training ?
What is your power as a Quality Er ?
Whats your purpose to be deployed on site ?
What is a slab cycle ?
What is your current structure's span area ?
Why are you not married yet (27) ?
5. Eversendai
What is concrete made up of ?
As per IS 456 2000, what is the main purpose of concrete ?
.. I've forgot many questions.
6. Leighton
Describe complete process of footing ?
Why to do dewatering ?
Whay are the points to taken care of while doing a trench work and checking ?
Can't recall..many questions..
Hope this help, its based on my interview throughout the years.
Also i have given many small comapny interviews ..they ask very basic questions..so not mentioning it here.
Also, one common question was among 4 companies ..how long have you worked on mivan formwork ?
Thank you sir
Sir I need your help sir
Great.. you remember all these
This video is really helpful
Answer -712.5mm
As Usual Your Each And Every Video Are Informative & Knowledgeable...
Sir aap ka interview questions Bala play list pura dekhane ke baad minimum 10 tho interview attend Kiya hai sab me select kiye geya hai mere ko . All videos are very informative for the civil engineer
Great
Sir thank you bahut logo ki help ho jati h😊
First of all you are a good person sir
It's very important points of site work.
712.5
Very informative video sir sir pls make one video on shear wall and outrigger system
The answer of question is -(b)-715 mm
What is the reading on staff? Ans:715mm
Sir bas mic achha kr lijiyega baki
Sab kuch excellent hai channel pr ❤❤❤
Thank you so much. Very elaborated info video. 🙏
Dear sir, finishing interview ke questions kya hote hai,woh video post kijiye n
ques
ask by ln malviya
1, what is the process of piling
2.what is the density use for bentenoide slurry for piling
3how many span are in major bridge lenght of major bridges
I really wish these videos were there when I was doing my BE. Teachers only gave us trauma and zero knowledge.
😂
was Dying of fear....
Thank you Sir apko bhut bhut dhannabat
Sir, mock test pe ek video banaiye 🙏
which one is consider having more strength in transfer of loads. if need to choose 1. Lapping 2. Welding?
Lapping
2:52 main video starts
712.5 mm sirji its all time right....
Option A) 712.5 mm
Sir for hook length 135 ⁰ angle, it will be 8D or 75 mm which is greater as per is code 13920 2016 amendment 1. Is it ok??
Ans. Is B.715 mm bcz least count is 5mm
A) 712.5 mm.
Thank you❤ for educating sir..!!
Sir,
Please make a video on Mivan shuttering interview Q&A including manufacturing companies.
Pls.
Guide Code IS:1200 Regd. Quantity Surveyor...
Staff reading is 712.5 mm
You are provide the great knowledge
Option- (a)712.5 mm
Screenshot lene ke liye time nahi diya,Side nahi hue sir,Jaisa aap starting me bole the
Bhul gaya tha bhai
Sirji please add Qn A for Project Manager role for a company
ok
Thanku sir, for making us understand these simple civil engineer in our minds. Whole country salute u sir. We need u sir u r genius
Keep Learning and Sharing
Very helpful video sir ❤️❤️❤️
Brick work plaster kuchh video daliye
Staff reading answer is b 715 mm
Sir plz survey k upper videos uplaod karo survey kaise karte hai
(B) 0.715 m or 715mm
Staff reading is 712.5 mm
Congratulations sir
Sir app ko clg life sey app ko follow Karta hoon....sir app Abhi video Nahi date Hain....a achga Nahi lagta Hain..plz app daily video post koriye ji
Video ATI hai bhai every alternate day
What is construction joint... ???? The Using material of construction joint....??
Gd morning sir drawing kese padhte hain uske upare ek vdo bandijiye sir main samjh nehi pa raha hun kese reading karunga please useke upar vdo banadijiye
The staff reading is 712.5 mm
Sir pqc beam test q Kiya jata hai ,kya hota hai,kaise bharna hai hai kb test krna hai eski jankari pr ek video pls
Very useful
Sir aap institute me training dete kya ya our jobs placement bi hai kya
Please make a video on type of cracks with its reason.
What is civil engineer execution???
Option (a) 712.5 mm
B option is the right answer 715 mm
T Shape column how many side check saoul
Thank you Sir a lot..
712.5 correct answer
What is bend deduction as per IS 2502 ,how to find value of R, sir isme bahot confusion hai please clear kariye
Ans.(b) 715 mm
Ans :- 712.5
A)712.5(.7125 m)
Right answer is = 712.5mm
Option a 712.5
the answer is option b of last question
Plz share Vdo on Basic to advance structural formulas....
Answer b 715mm
712.5mm staf reading
answer is a) 712.5
b) 715mm
B)715mm
Answer is A
0.712
a) 712.5mm
Ans: B 715
ans is B
Good 👍
B answer hoga sir
Knowledge Questions
Sir please make a topic on the Non Structure Wall
Helpful video❤
Plz make video on how to check warpage and bend of tile and what is its tolerance limit as per IS code
To prop khulwa hi q rahe ho
Sidha 14din per di sab ek sath khul jayega
7 din khol Diya agar beam thoda bend hua by chance to prob kya use utha payega dobara straight position me
a)712.5
Thank you sir
Welcome
A)712.5mm
190*90*90mm
Answer is (a) 712.5 mm
Thanks❤ jii
722.5
A is the answer.
Sir interior design ka jo civil engineer ke liye right hota hii
Good ❤
(a) 712.5 mm
a)712.5mm
Sir please ek video quality all documents ke liye bana dijiye
B 715mm
Ham log to 12d rakhte hai 90° ke liye 10d
Answer Is A) 712.5mm
B) 715 mm
A = 712.5 mm
Sir thank you
715 mm staff reading
0.714 MTR