Rat guard done and exterior wall metal started!

แชร์
ฝัง
  • เผยแพร่เมื่อ 28 ส.ค. 2024
  • We started the walls of the shop. First we had to put the rat guard up. Then we started the siding. We use a laser level to set the rat guard height consistently all the way around.

ความคิดเห็น • 4

  • @KyCellRepair
    @KyCellRepair 4 หลายเดือนก่อน

    You wish you had used the thicker faced insulation?

  • @Bamaoutdoors
    @Bamaoutdoors 8 หลายเดือนก่อน

    Looks nice! I'm looking to enclose by barn soon and I always heard the metal wasn't supposed to be in contact with treated lumber? You think it's ok to put the rat garde straight on that bottom board? I'm assuming it was treated wood. Thanks!

    • @runbuildlive5234
      @runbuildlive5234  7 หลายเดือนก่อน +1

      We built it directly to the specs from the plans we got from Menards. It is pressure treated and the rat guard went straight on it.

    • @Justhereforfun1422
      @Justhereforfun1422 หลายเดือนก่อน

      Is the rat guard being installed so that the siding metal will sit below slab level or at the same level of the slab?