ขนาดวิดีโอ: 1280 X 720853 X 480640 X 360
แสดงแผงควบคุมโปรแกรมเล่น
เล่นอัตโนมัติ
เล่นใหม่
looks nice
I’ve been having a hard time with my lines for the evap system. Would you be willing to do a video on where all of the lines go?
On the next episode I'll try doing a video removing the air cleaner assy and exposing the vauum lines. Luckily, we haven't had to deal with those too much.
looks nice
I’ve been having a hard time with my lines for the evap system. Would you be willing to do a video on where all of the lines go?
On the next episode I'll try doing a video removing the air cleaner assy and exposing the vauum lines. Luckily, we haven't had to deal with those too much.