They leave a little sand on the river side, then cut channel to the ocean, then come back to river side a take the last couple of scoops and then watch as the river flows through.
About 20 full sticks of dynamite pushed down about 3m at regular intervals, with about 1 second delay between each shot, starting from the river end would have cleared this in a few minutes, and been watchable.
And didn’t actually show the river mouth being opened.
Government job. Slow operator and a surveyor to assure the downhill slope.
Great footage of a machine and someone's back!
driver:“I‘ve been digging sand here, since I was 2
About 20 full sticks of dynamite pushed down about 3m at regular intervals, with about 1 second delay between each shot, starting from the river end would have cleared this in a few minutes, and been watchable.
use the whole bucket
Gettin paid by the hour.damn that guy is slow.
Running commentary from Captain Obvious.
Wow, that operator was terrible.
he needs to get off his phone and get it done...
This could’ve gotten done faster with multiple people
👍👍👌👌
Must get paid by the hour
how frequently does this have to happen?
Rick Cruz every time the river fills up to the maximum level of water