3:38-4:37 Did the Crown Valley Road railroad crossing in Acton get its original mechanical bells reinstalled by any chance? The latest Google Street View images from January 2024 show the crossing still had electronic bells, a Safetran Type 2 and a WCH Type 4. But now the video shows the crossing back with its original mechanical bells, WCH and Safetran (fast ringing).
I've never seen Metrolink look so clean. I think the F100 locomotive is much more attractive then the Siemens since it's considerably slimmer!
Great video
Nice video love you're vids
Excellent Colin!!
An absolute masterpiece!!!
the single bombardier bilevel in the middle bothers me lol. At least its perfectly centered in the consist!
3:38-4:37 Did the Crown Valley Road railroad crossing in Acton get its original mechanical bells reinstalled by any chance? The latest Google Street View images from January 2024 show the crossing still had electronic bells, a Safetran Type 2 and a WCH Type 4. But now the video shows the crossing back with its original mechanical bells, WCH and Safetran (fast ringing).
Maintainer put them back up for some reason
@PasadenaSubColin That's strange. A lot of us as railfanners prefer mechanical railroad crossing bells instead of the electronic ones.