“Insertion of SEJ on running lines" "चल रही लाइनों पर एसईजे का सम्मिलन"

แชร์
ฝัง
  • เผยแพร่เมื่อ 12 ก.ย. 2024
  • While remodeling of yards generally new x-overs shall be provided, some of yard locations as per remodeling shifting of SEJs i.e. insertion of new, removal of existing SEJs and regarding i.e. 1in400 etc.
    SEJ means Switch Expansion Joint shall be inserted end of LWR to permit expansion/contraction of the adjoining breathing lengths due to temperature variations.
    After buffer rails various design of SEJs for wider gaps from 80mm single gap, single gap improved to double gap.
    Presently using Conventional (single gap) and improved (double gap) SEJs.
    Chose the correct location of insertion i.e. chainage as per LWR plan
    As per plan suited at site or any shifting as per LWR manual permitted locations i.e. obligatory points like LC, P&C, Bridges, Curves etc.
    But in cont but situations Conventional SEJ permitted up to 0.5º curve, where as Improved SEJ up to 2º curve but not in transition curve.
    Preliminary arrangements;
    Inspection of site where SEJ to be inserted, location shall be ensure that distance between joints 6.5m and wear on rails as per site conditions.
    present location one side rails have cyclic wear to avoid that 2 options one changing location, other one is replace of adjacent rail also.
    All SEJ components as per drawing, then shifting and assembling at site on both sides kept ready including AT welding team.
    जबकि यार्ड की रीमॉडलिंग आम तौर पर नए एक्स-ओवर प्रदान किए जाएंगे, एसईजे की रीमॉडलिंग शिफ्टिंग के अनुसार कुछ यार्ड स्थान यानी नए का सम्मिलन, मौजूदा एसईजे को हटाना और यानी 1in400 आदि के संबंध में।
    एसईजे का मतलब है स्विच एक्सपेंशन ज्वाइंट को एलडब्ल्यूआर के सिरे पर डाला जाएगा ताकि तापमान में उतार-चढ़ाव के कारण सांस लेने की लंबाई के विस्तार/संकुचन की अनुमति मिल सके।
    बफर रेल के बाद 80 मिमी सिंगल गैप से व्यापक गैप के लिए एसईजे के विभिन्न डिजाइन, सिंगल गैप को डबल गैप में सुधारा गया।
    वर्तमान में पारंपरिक (सिंगल गैप) और बेहतर (डबल गैप) एसईजे का उपयोग कर रहे हैं।
    सम्मिलन का सही स्थान चुनें अर्थात LWR योजना के अनुसार जंजीर
    साइट पर उपयुक्त योजना के अनुसार या एलडब्ल्यूआर मैनुअल अनुमत स्थानों के अनुसार किसी भी स्थानांतरण जैसे एलसी, पी एंड सी, ब्रिज, वक्र इत्यादि जैसे अनिवार्य बिंदु।
    लेकिन परिस्थितियों में लेकिन पारंपरिक एसईजे 0.5º वक्र तक की अनुमति देता है, जबकि बेहतर एसईजे 2º वक्र तक लेकिन संक्रमण वक्र में नहीं।
    प्रारंभिक व्यवस्था;
    साइट का निरीक्षण जहां सेज डाला जाना है, स्थान यह सुनिश्चित किया जाएगा कि जोड़ों के बीच की दूरी 6.5 मीटर और साइट की स्थिति के अनुसार रेल पर पहनें।
    वर्तमान स्थान एक तरफ रेल में चक्रीय पहनने से बचने के लिए 2 विकल्प एक स्थान बदलते हैं, दूसरे को आसन्न रेल की जगह भी बदल दिया जाता है।
    ड्राइंग के अनुसार सभी एसईजे घटक, फिर दोनों तरफ साइट पर शिफ्टिंग और असेंबलिंग को एटी वेल्डिंग टीम सहित तैयार रखा गया।
    Disclaimer- Some contents are used for educational purpose under fair use. Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use. All credit for copyright materiel used in video goes to respected owner.

ความคิดเห็น • 24

  • @krishnamurthy9868
    @krishnamurthy9868 2 ปีที่แล้ว +1

    Thank you sir 🙏🙏chala baga clear ga chepparu🌹🌹

  • @srikarvemu5945
    @srikarvemu5945 3 ปีที่แล้ว +2

    Please continue teaching and share your valuable experience through channel

  • @tamannabegum2251
    @tamannabegum2251 9 หลายเดือนก่อน +1

    Great sir ji

  • @ankeshjha5979
    @ankeshjha5979 2 ปีที่แล้ว +1

    Very nice teacher

    • @subbaraorailway
      @subbaraorailway  2 ปีที่แล้ว

      Thanks Sir for the support and suggestions thanque very much Sir

  • @KaushalKumar-kh7gs
    @KaushalKumar-kh7gs 3 ปีที่แล้ว +1

    Very good sir...pls keep teaching us

  • @anilkumarvemu604
    @anilkumarvemu604 3 ปีที่แล้ว +1

    Thank you so much sir.🙏🙏🙏🙏🙏🙏

  • @DEVBRATSHRIWAS
    @DEVBRATSHRIWAS 3 ปีที่แล้ว +1

    Useful information sir

  • @srinivasrao2859
    @srinivasrao2859 ปีที่แล้ว +1

    Please try to explain in telugu language
    Then it will be super

  • @balajimd482
    @balajimd482 3 ปีที่แล้ว +1

    Information to be provided up the mark
    Some information not provided

  • @souhardsingh5495
    @souhardsingh5495 ปีที่แล้ว

    Sir why long toungerail should be opposite to direction of traffic.

  • @aruproy8793
    @aruproy8793 2 ปีที่แล้ว +1

    Rao Sir, I still do not understand how the two track changing rails move. I can understand how the switches move but not the other end of the two rails.

    • @subbaraorailway
      @subbaraorailway  2 ปีที่แล้ว

      Good Afternoon Sir kindly note all your doubts then call me please

    • @aruproy8793
      @aruproy8793 2 ปีที่แล้ว

      @@subbaraorailway Sir, how do I call you pl

  • @srinivasrao2859
    @srinivasrao2859 ปีที่แล้ว +1

    Sir can't u speak in telugu