Super cool pipe handling in drilling rig.. ;)

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ม.ค. 2025

ความคิดเห็น • 49

  • @rzrselliott
    @rzrselliott 7 ปีที่แล้ว +30

    Legend has it they're still drilling this well

  • @sqp1956
    @sqp1956 4 ปีที่แล้ว +3

    Big rig that’s a 5,000 connection :) like watching paint dry ! So much for technology advancement !

  • @rfw700
    @rfw700 9 ปีที่แล้ว +8

    The system is on ship which is designed to drill top hole. The ship when its working properly, will be at sea in open water. It will pitch and roll, so the equipment is designed to overcome the difficulties associated with that. Besides what you see is the equipment being tested before it goes operational. So as it is being tested, it will be slow. Any of you who have worked on a small Drillship in open ocean, will understand why technology designed for land rigs is not going to work at sea. Oh, and it doesn't matter how good the Roughnecks are, they will not be able to work fast if the ship is moving. Having worked as a Driller on a small drillship, I can safely say it's nothing like working on a little land rig.

  • @randyp3675
    @randyp3675 3 ปีที่แล้ว

    Slowest connection I have ever seen. You are FIRED

  • @nokbeen3654
    @nokbeen3654 5 ปีที่แล้ว +2

    We have this excact same system, only larger and more equippement, but we; pick up the pipe, load it in, elevate it, torque it and set slips in 58 seconds.

  • @brucecook4240
    @brucecook4240 ปีที่แล้ว

    So the possibility of a blowout is not a issue anymore where I come from a little speed really helps out on the cost to develop a new well

  • @aryantorahman5838
    @aryantorahman5838 4 ปีที่แล้ว

    Catwalk Machine push the drill pipe, BX Elevator hold and lock it, and lifted up by Top Drive. Ready to go to the well center

  • @deancoleman8969
    @deancoleman8969 9 ปีที่แล้ว

    Posted and then read the comments. Thanks make more sense when the surroundings and conditions are taken into perspective.

  • @jimlayzz2350
    @jimlayzz2350 3 ปีที่แล้ว

    This is good for the newbies but for the old chain singing lads this is also good.

  • @tdx1521
    @tdx1521 4 ปีที่แล้ว +2

    All complain about how slow it is lol. We use this on my offshore oil rig, Trippingspeed of up to 1200m per hour. We don't use the catwalk then but use Hydraracker with stands of 3 pipes from / to the setback. The catwalk is only for laying down / picking up singles for spaceout or special tools.

    • @santoshchaitanya5888
      @santoshchaitanya5888 ปีที่แล้ว

      Hey bro, i want to tqlk to u abt this rig, i have some doubts, since i am working on same type of rig. How to connect u?

    • @jameswahnee-vn5nt
      @jameswahnee-vn5nt 5 หลายเดือนก่อน

      We don't believe you. Anyone who calls a Drilling Rig. An Oil Rig. Is Nothing but a LIAR!

  • @bobcardona4862
    @bobcardona4862 4 ปีที่แล้ว

    Damn r they ever going to make a conection

  • @dongyinglakepetroleumtechn5086
    @dongyinglakepetroleumtechn5086 10 ปีที่แล้ว

    thank you very much for your video , we are chinese company, we have exported 140 drill pipe elevators to our customer

    • @stressbelden5869
      @stressbelden5869 8 ปีที่แล้ว

      I don't know why you said:
      "We are Chinese company."
      ******************************************************************************
      ******************************************************************************
      Your country does not know the word "quality."
      They spell it ...... "kuality.:
      Twice...yes......twice, I 've bought water sprinklers for my yard that
      that one night/evening. That's about 30 minutes of
      service.....for a frick'in water sprinkler. That said:
      HOW CAN YOUR COUNTRY MANUFACTURE ELEVATORS??????
      They are slapped together with pig iron......no quality, whatsoever.
      And also, dangerous. Perhaps someday China might be on the
      level of say Japan as far a quality.....
      but in the interiem, China has a long ways to go to deliver quality
      made products.....ie., oilfield equipment.
      P.S. Those workover rigs made in China.....design was stolen
      from the U.S. & Europe via reverse engineering.

  • @mubinmohd4808
    @mubinmohd4808 6 ปีที่แล้ว +1

    I want the specification on the catwalk machine used . I want model number swl and working angle please anybody help..

    • @mubinmohd4808
      @mubinmohd4808 6 ปีที่แล้ว

      It's cws something like that model number

  • @23099ty
    @23099ty 5 ปีที่แล้ว

    Thread protector is still on....

  • @jesusprado6394
    @jesusprado6394 2 ปีที่แล้ว

    Top driver's pipe handler elevators should be turned 180 to latch pipe properly, it'd be safer, easier and more efficient.

  • @legaliseme
    @legaliseme 9 ปีที่แล้ว +1

    Fuck me, sure it looks safe but look at the same operation with 2 roughnecks a pair of manual elevators where they store the drill string at 30 degrees and the same operation takes about 1/10th of the time

    • @theredking2495
      @theredking2495 9 ปีที่แล้ว

      +legaliseme Agreed, but the point here, I think, is there is no personnel at the V-door. Which is safer.

  • @tr4nsg0th1ca
    @tr4nsg0th1ca 5 ปีที่แล้ว

    This is an equipment test and not an actual connection. Being run slow on purpose to make sure everything's in working order.

  • @juddstephens8408
    @juddstephens8408 2 ปีที่แล้ว

    I dont even know how that is feasible. Its so slow

  • @venkataswamyharish939
    @venkataswamyharish939 9 ปีที่แล้ว

    thank you very much for your elaborate presentation. I am an engineer designs Gear box for Industrial application

  • @screamingdemon2453
    @screamingdemon2453 6 ปีที่แล้ว +1

    All these billion dollar technologies just to make it easy could have already made a connection

  • @dixirkt
    @dixirkt 8 ปีที่แล้ว

    Me, I'd have shown some initiative. Have that worm run scoop up a case of Ether and saturate them air intakes down man it's Beer 30. Time ta go

    • @dixirkt
      @dixirkt 8 ปีที่แล้ว

      Read my post embarrassed offended and judgey all at once... Fuck off ya fat fuck

  • @frozenofferings8361
    @frozenofferings8361 5 ปีที่แล้ว

    Lol when the pipe is at that angle you need to latch it from the top

    • @dennislandt9212
      @dennislandt9212 3 ปีที่แล้ว

      How you gonna do this with this type of rotator? Latch the BX from the top is not allowed for safety reasons. 👍🏼

  • @rrs1074
    @rrs1074 2 ปีที่แล้ว

    Very very slow to.pick up one joint.

  • @yudikristiawan7751
    @yudikristiawan7751 3 ปีที่แล้ว

    So slow the pipe will be stuck in drilling operation

    • @achbarrahawarin3938
      @achbarrahawarin3938  3 ปีที่แล้ว

      Well, the video was actually taken during testing of the items so it took quite some time 😁

  • @deancoleman8969
    @deancoleman8969 9 ปีที่แล้ว +1

    This is like watching paint dry. Awkward and so slow. God Bless the Poor Guy who bid this well, if he is lucky they will have it done by retirement.

    • @qu11n
      @qu11n 3 ปีที่แล้ว

      This is litterly how it works on any offshore rig here in Norway.

  • @gregg4164
    @gregg4164 7 ปีที่แล้ว

    Might help if they actually knew how to use that fancy machine.

  • @cajunfamily5227
    @cajunfamily5227 9 ปีที่แล้ว

    Yea clutch it and come up flip watch paint dry geze

  • @rafaelsaenz36
    @rafaelsaenz36 6 ปีที่แล้ว +1

    SUPER SLOWWWWW!!!!!
    ZZZ ZZZ ZZZ ZZZ ZZZ ZZZ ZZZ ZZZ ZZZ ZZZ

  • @codyprice1987
    @codyprice1987 6 ปีที่แล้ว

    Waste of good steel

  • @ryanburbridge
    @ryanburbridge 9 ปีที่แล้ว

    That looks like a waist of time.

  • @aasimpathan4155
    @aasimpathan4155 3 ปีที่แล้ว

    Not Super cool. But slow and not necessary.

  • @uglagps
    @uglagps 9 ปีที่แล้ว

    Very slow....

  • @talebmakhlouf9741
    @talebmakhlouf9741 2 ปีที่แล้ว

    very slow

  • @kraujoe
    @kraujoe 9 ปีที่แล้ว

    wtf that's slow

  • @MrCustomerAdvocate
    @MrCustomerAdvocate ปีที่แล้ว

    To much time is waisted

  • @N9NEfingers
    @N9NEfingers 2 ปีที่แล้ว

    Slow as fuq

  • @aryantorahman5838
    @aryantorahman5838 4 ปีที่แล้ว

    Catwalk Machine push the drill pipe, BX Elevator hold and lock it, and lifted up by Top Drive. Ready to go to the well center