    Join us as Kelly discusses the differences between the TIGO Rapid Shutdown units, the TS4-A-O, TS4-A-S, TS4-A-F, and TS4-A-2F. She will discuss which components may be best suited for your PV system and why.
    --------------------------------------------------------
    TIGO Optimizer Shading Test
    • Exploring the Function...
    Check out the TIGO TS4 - Inverter Compatibility list below:
    www.tigoenergy.com/inverter-c...
    --------------------------------------------------------
    TS4-A-O:
    signaturesolar.com/tigo-ts4-a...
    TS4-A-S:
    signaturesolar.com/tigo-15a-7...
    TS4-A-F:
    signaturesolar.com/tigo-ts4-a...
    TS4-A-2F:
    signaturesolar.com/tigo-15a-1...
    --------------------------------------------------------
    Recommended Solar Panels:
    signaturesolar.com/shop-all/s...
    Solar Panel Mounting Hardware:
    signaturesolar.com/shop-all/s...
    --------------------------------------------------------------
    Recommended Solar Batteries:
    EG4-LL: signaturesolar.com/shop-all/b...
    EG4 Lifepower4: signaturesolar.com/shop-all/b...
    EG4 PowerPro: signaturesolar.com/shop-all/b...
    --------------------------------------------------------------
    Recommended Solar Inverters:
    EG4 18KPV Hybrid Inverter | All-In-One Solar Inverter | 18000W PV Input | 12000W Output | 48V 120/240V
    signaturesolar.com/eg4-18kpv-...
    3kW Off-Grid - EG4 3000EHV-48
    signaturesolar.com/eg4-3kw-of...
    - Features: 3000W Output | 5000W PV Input | 500 VOC Input
    --------------------------------------------------------------
    Shop Kits & Bundles: signaturesolar.com/kits-bundles/
    Need additional wiring or system components for your DIY Solar Project?
    signaturesolar.com/shop-all/s...
    signaturesolar.com/shop-all/s...
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 37

  • @hesawhat
    @hesawhat 6 หลายเดือนก่อน +8

    This described for me what I needed, and what Tigo's own info could not. Great!

    • @hesawhat
      @hesawhat 5 หลายเดือนก่อน +1

      Just don’t ever try and use the doubles on a flush mount installation. Wire management is impossible, esp. with having to plug in both panels before the string.

  • @darkenergy5686
    @darkenergy5686 9 หลายเดือนก่อน +2

    Nicely done. I'm still learning about solar systems and this is an important area that I was not aware of. Thank you for the demonstration.

    • @SignatureSolar
      @SignatureSolar  9 หลายเดือนก่อน

      Glad it was helpful!

  • @myhificloud
    @myhificloud 9 หลายเดือนก่อน +2

    Good information, very helpful. Thank you for this.

    • @SignatureSolar
      @SignatureSolar  9 หลายเดือนก่อน

      You're very welcome!

  • @mygamertag2010X
    @mygamertag2010X 3 หลายเดือนก่อน

    Absolutely incredible explanation. Thank you so much

  • @TheMorenobarker
    @TheMorenobarker หลายเดือนก่อน

    Great description! Thanks for making this and other videos!

  • @TRYtoHELPyou
    @TRYtoHELPyou 7 หลายเดือนก่อน +2

    Thanks for sharing this

  • @2306cm
    @2306cm 13 ชั่วโมงที่ผ่านมา

    We are talking about TS4-A-S, optimizers

  • @erickbostrom4049
    @erickbostrom4049 3 หลายเดือนก่อน

    very well done, thank you.

  • @55Bigdon1
    @55Bigdon1 9 หลายเดือนก่อน +2

    Very good info !

    • @SignatureSolar
      @SignatureSolar  9 หลายเดือนก่อน

      Thanks! Glad it was helpful!

  • @Issomethinggoingon
    @Issomethinggoingon 7 หลายเดือนก่อน +1

    Hi I’m about to order 6 O versions, will they work without the tap ? Or are they going to need a firmware update? Many thanks

    • @leftlink
      @leftlink 6 หลายเดือนก่อน

      I have read that they work without the tap for the shutdown function but not for the optimization or data logging. but someone should confirm that is more knowledgeable than me!

  • @Freedom_soup
    @Freedom_soup 9 หลายเดือนก่อน +1

    Thanks !

  • @boriskeller1669
    @boriskeller1669 3 หลายเดือนก่อน +2

    sad, that there is no device for Optimization AND Fire Shutdown AND Monitoring. Yes, you can combine them, but who wants to clip 2 modules behind the pv modules with all the risks of defects (and of course the price when using many pv modules).
    So the m device can really NOT separate the module from the string by command?

    • @SignatureSolar
      @SignatureSolar  3 หลายเดือนก่อน

      Yes, the only way to get all 3 would be to mix and match the TIGO TS4-A-F and the TS4-A-O.

    • @jessiej3991
      @jessiej3991 2 หลายเดือนก่อน

      There is no device like that because they need your money and not because they can't actually make a single module that does all 3 tasks

  • @neomatrix2722
    @neomatrix2722 4 หลายเดือนก่อน

    Thank you for sharing I have a question since I'm in ground Mount therefore I don't need these however I do like the idea of being able to optimize having said that I will have a high voltage array with eight panels 480 watts each combined with a Schneider Electric 100 amp 600 volt charge controller what will you recommend for me and how many of these would I need thank you

    • @SignatureSolar
      @SignatureSolar  4 หลายเดือนก่อน

      Hi @neomatrix2722 - I would recommend that you complete a design form and speak with our design team! signaturesolar.com/system-design/#/Welcome

    • @brucey5585
      @brucey5585 หลายเดือนก่อน

      You would need 8 tigo ts4 a O for optimizing. 1 tigo per panel, since 1 of your panel is pretty much the limit of 1 tigo. Then you will also need the tap module and rss module.

  • @2306cm
    @2306cm 13 ชั่วโมงที่ผ่านมา

    Is it possible to proceed with I-V Curve measurements if there are installed optimizer units in the string?

    • @SignatureSolar
      @SignatureSolar  13 ชั่วโมงที่ผ่านมา

      Unfortunately, IV Curve tracing will not work for any Tigo devices (whether RSD is activated or not). The Tigo MLPE units receive their functional power from the PV Module, and the IV Curve test will present conditions that range from Isc to Voc. This effectively starves the MLPE from its running power and (if sustained) the unit will shut down.
      support.tigoenergy.com/hc/en-us/articles/215790098-Testing-Methods-for-Tigo-Flex-MLPE-Systems

  • @Tiersmoke92555
    @Tiersmoke92555 5 หลายเดือนก่อน

    Safety looks expensive. Do I need to add this type of system to remote ground and none occupied structures?

    • @SignatureSolar
      @SignatureSolar  5 หลายเดือนก่อน

      Whether or not your PV panels require module level shutdown is up to your local AHJ, and you are correct, you would need a TS4 for each solar panel.

    • @brucey5585
      @brucey5585 หลายเดือนก่อน

      Even if you dont have each panel shutdown. Still get an expensive shutdown switch for the array.

  • @scrapyardwars
    @scrapyardwars 9 หลายเดือนก่อน +1

    Excellent results from TS4 here.
    Optimisation is giving me the edge in a shaded array.
    Recomended if any shading I have 20 of them.

  • @billingridgreen3749
    @billingridgreen3749 5 หลายเดือนก่อน

    how long are the cables

    • @SignatureSolar
      @SignatureSolar  5 หลายเดือนก่อน

      There's 4 referenced in the video, which one do you need the dimensions of so we an better help?

    • @williamgreen6889
      @williamgreen6889 5 หลายเดือนก่อน

      TS4-A-2F

    • @williamgreen6889
      @williamgreen6889 5 หลายเดือนก่อน

      Portrait model

    • @SignatureSolar
      @SignatureSolar  5 หลายเดือนก่อน

      You can find the dimensions here: signaturesolar.com/content/documents/TIGO/TS4-A-2F.pdf Let us know if you have any other questions!

  • @davehasenford3985
    @davehasenford3985 หลายเดือนก่อน

    I'm not an installer. But I've heard from installers that Tigo products are crap. And yet others seem to think they are great.

    • @SignatureSolar
      @SignatureSolar  22 วันที่ผ่านมา

      Since February 2022, Tigo has made up for less than 0.5% of our support tickets.