How to Wire a Subpanel

แชร์
ฝัง
  • เผยแพร่เมื่อ 3 ธ.ค. 2024

ความคิดเห็น • 196

  • @KevinCoop1
    @KevinCoop1 ปีที่แล้ว +2

    Tim, I need to apologize to you! Your video popped up and I watched it again. I saw my original comment. I am so sorry that I did not tell you how good your video and accurate your information was! Very well done! Respectfully, Kevin

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +1

      Thanks Kevin, I'm glad I popped back into your feed!

  • @kevinwhite3102
    @kevinwhite3102 3 ปีที่แล้ว +4

    I'm an Electrician in Arkansas and we put 2 ground rods on the main service to the house and one on sub panels.

  • @jamesleung1528
    @jamesleung1528 ปีที่แล้ว +1

    very good directions, good teacher for all electrical contractors,

  • @340rps
    @340rps 4 ปีที่แล้ว +10

    The part I needed to see you sped up the video!! ... connecting the main supply wires to the panel.

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +2

      What do you need help with?

  • @mattk.5258
    @mattk.5258 2 ปีที่แล้ว +2

    11:30 Ground rods are super easy with a portable 30lb jack hammer, i've hammered in tons of them that way.

    • @TimWilborne
      @TimWilborne  2 ปีที่แล้ว +1

      Yes, there's an attachment for a hammer drill that works well also. Thanks for watching!

  • @policebo
    @policebo 3 ปีที่แล้ว +1

    Great Great Great video man. seriously I watch a lot of videos on different topics. You nailed this one!

    • @TimWilborne
      @TimWilborne  3 ปีที่แล้ว +1

      Awesome! Thank you!

  • @bsmith8564
    @bsmith8564 2 ปีที่แล้ว +4

    You exceeded code on a couple things, good for you. Ground rods only need 6 feet of separation and NMB needs strapping within 12 inches from the box not 6. I could not tell if the grounding electrode was continuous between ground rods as is required due to ground rod clamps are rated for one conductor only.

    • @thomasmarable6818
      @thomasmarable6818 2 ปีที่แล้ว +2

      12" if cable clamp in box 8" if no clamps

    • @bsmith8564
      @bsmith8564 2 ปีที่แล้ว +1

      @@thomasmarable6818 Correct, he has boxes with listed clamp. So 12" is maximum.

    • @bsmith8564
      @bsmith8564 2 ปีที่แล้ว

      Just been going through my 08 code book and can't find the 8 inch requirement, Got a code reference? Thanks.

    • @thomasmarable6818
      @thomasmarable6818 2 ปีที่แล้ว

      Its in article 334 not sure about 2008 but my state is on 2017 code cycle

    • @bsmith8564
      @bsmith8564 2 ปีที่แล้ว +1

      @@thomasmarable6818I found it. 314.19(C) 334 is NM cable and only references 12 inch.

  • @colbylammers382
    @colbylammers382 3 ปีที่แล้ว +1

    I rarely post a comment but this was precisely what I needed. Also you had a few tips that were spot on

    • @TimWilborne
      @TimWilborne  3 ปีที่แล้ว +1

      Great to hear Colby!

  • @briandonovan6546
    @briandonovan6546 9 วันที่ผ่านมา +1

    The very fact that building codes vary depending on the municipality is why I avoid pulling permits on anything. If the inspectors cannot even agree from city to city, I will do it the way that I see working the best/safest and save the permit fees. And yeah, I am a licensed builder by trade haha

  • @kennethriviere3221
    @kennethriviere3221 3 ปีที่แล้ว +5

    Simple but very informative. Just helped me on a project.

  • @StoicThrower
    @StoicThrower 2 ปีที่แล้ว +4

    I appreciate your mention of the ground rod installation. I believe when my place was done, I may have had one of those vendors that cut the rod short. I'm running into bleed over issues with one circuit on a 100-amp panel and have a few suspicions.

    • @ericwotton2046
      @ericwotton2046 2 ปีที่แล้ว

      I'm curious what you mean by bleed over issues? Could you elaborate?

    • @StoicThrower
      @StoicThrower 2 ปีที่แล้ว

      @@ericwotton2046 Voltage is being split between the neutral and the ground wire without tripping the breaker.

    • @ericwotton2046
      @ericwotton2046 2 ปีที่แล้ว

      @@StoicThrower Interesting, is it just one circuit causing the issue? Your panels are all networked properly with grounds and neutrals separated back to the main service panel (where they combine.) You might have a ground fault within that circuit either an appliance or improper wiring in the brach wiring. A ground rod really wouldnt effect this much unless multiple transformer are involved.

    • @StoicThrower
      @StoicThrower 2 ปีที่แล้ว

      @@ericwotton2046 yep. One circuit. Checked it all. Replaced every receptacle. Wired correctly. Nothing was plugged in. Never did find a definitive reason for it. Ran a new 20 amp circuit with no drama.

    • @seanvandermolen7287
      @seanvandermolen7287 2 ปีที่แล้ว +5

      i don't think that grounding rod should have been installed in the first place. The grounding bond should only be at the mains panel. By adding another ground rod, you can potentially create another path back to source through earth that would cause the issue you're talking about. The bleed is current on ground where it should not be.

  • @lowkey1080
    @lowkey1080 3 ปีที่แล้ว +2

    I appreciate this video. Learned something new watching this video. Keep up the good work!

  • @jeffcox9930
    @jeffcox9930 3 ปีที่แล้ว +7

    Good video. Better than most, Maybe in future a video about the theory and differences between wiring a standalone main panel and main panel subpamel. Example why you split the neutral bus and ground bus.

    • @TimWilborne
      @TimWilborne  3 ปีที่แล้ว +1

      Great suggestions Jeff, thanks for watching!

  • @johnbrandon1416
    @johnbrandon1416 ปีที่แล้ว +1

    This video I finally found is like hanging out with your smart friend.

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +2

      Not the smartest but hopefully I help with the basics. Thanks for watching 😁

    • @ziggyjohnston5302
      @ziggyjohnston5302 7 หลายเดือนก่อน

      @@TimWilborne humble. Even better

  • @JeremiahL
    @JeremiahL 2 ปีที่แล้ว +2

    I noticed that your ground wire is significantly smaller than your supply conductors? Are ground wires sized differently than supply conductors?

  • @jaydonballman1135
    @jaydonballman1135 ปีที่แล้ว +1

    Can I add a neutral lug kit where that bonding screw went or is it good enough if it’s on one of the busses, I’m gonna add a grounding bar as well.

  • @Sharpshooter44024
    @Sharpshooter44024 หลายเดือนก่อน +1

    I have a question. I installed a whole house ATS. Im connecting to the breaker which has just become a sub panel. I assume that i have to now install a seperate ground terminal bar in the old breaker on bother sides of the lines. Now I then take a wire from from both ground bars and run it into the ATS using two wires 3 AWG (copper) going to ATS ? I am to move the earth ground from the old breaker over to the ATS. The neutral is already connected through the transfer switch block over to the sub panel. The changes are only on the ground ?
    The breaker is 200 Amp in ATS and old main breaker.

    • @TimWilborne
      @TimWilborne  หลายเดือนก่อน +1

      Improper grounding not only can damage the generator, it can get you hurt. Time to call an electrician. It will be dollars well spent and some localities have different specifics on this so no one here can give you sound advice.

  • @rustycalvera977
    @rustycalvera977 2 ปีที่แล้ว +1

    Is the panel box itself (equipment ground) grounded with just the two screws holding the grounding bar to the panel case? On the face of it, it doesn't seem sufficient.

  • @danielpascoe719
    @danielpascoe719 2 ปีที่แล้ว +1

    This may be a stupid question.. but if one piece of equipment needs like 90 amps... does it draw from the panel as a whole? Or do you need to have like... say a bunch of unused breakers?

  • @AraceaeFanatics
    @AraceaeFanatics 2 ปีที่แล้ว +1

    Okay, this was super helpful.
    We're running a sub panel into our shed to run an ice machine and a time clock, and this video helped with some of our questions, but everything inside the shed will be 120v, so do you have a video of how you connect this inside the main panel to feed the sub panel?
    Inside the shed will only be an ice machine, a time clock, and a couple outlets and 2 led ceiling lights. All 110, so we wouldn't need 240 coming into the shed. We'll have a separate breaker in the main panel for this shed, but how do we connect that breaker for 120v and 100 amps?
    The 100 amps is the bosses decision.

  • @throughoureyes5160
    @throughoureyes5160 2 ปีที่แล้ว +1

    So heres what we have going on. We have a main pole that has 200 amp service to it. We have a shed that is about 350 to 400 feet away and we'd like to install a sub panel to feed an A.C. and a fridge. I think I need a 50 amp breaker at the main box then run #6 UF wire to the sub panel which will have two 15 amp breakers, one to feed an outlet for the A.C. and one to feed the outlet for the fridge. Does this sound like the right set up? Also would I need to worry about voltage drop or would this set up enable The A.C. and fridge to run without fault even with voltage drop. I have literally just started to learn about all this in the last week. Treat me like a toddler when answering please. haha

  • @newday8172
    @newday8172 2 ปีที่แล้ว +2

    Why would you use a white( neutral) wire in combination with a black( hot) wire for a double pole breaker? Shouldn't it be 3 wire,red and black to double pole white to neutral and ground to ground?

    • @TimWilborne
      @TimWilborne  2 ปีที่แล้ว +1

      Not all equipment requires a neutral. In many cases, only 2 legs of 120VAC and a ground are required.

    • @newday8172
      @newday8172 2 ปีที่แล้ว +1

      @Tim Wilborne appreciate your answer.
      Just a quick question. When wiring a sub panel, it should not be wired were the ground and neutral are bonded? What type of panel is that. Does it come not bonded?

    • @TimWilborne
      @TimWilborne  2 ปีที่แล้ว +1

      @@newday8172 That could vary depending on where you are located but for the most part they are only bonded at the main panel, they are separate at sub panels.

  • @Dieselfreek26
    @Dieselfreek26 3 ปีที่แล้ว +3

    This video was great. I'm in the process of wiring a sub panel into my new garage and the panel did not come with a ground buss. Thank you for the solid info

  • @Dukemeistro
    @Dukemeistro ปีที่แล้ว +1

    You are an excellent teacher!

  • @tomsmith2395
    @tomsmith2395 2 ปีที่แล้ว

    I am finishing my basement and was going to add a 100amp sub-panel right next to the current box. What size feeder wire should I use?

  • @aammiranda
    @aammiranda 8 หลายเดือนก่อน +1

    Great video. Why aren’t the neutral and ground bonded in a sub panel?

    • @TimWilborne
      @TimWilborne  8 หลายเดือนก่อน +1

      You need to check your local electrical codes but here, they can only be bonded in one place, the main panel.

    • @usmarinekenny
      @usmarinekenny 3 หลายเดือนก่อน

      They aren’t bonded in a subpanel to eliminate a parallel path of current back to the panel on the ground and neutral. Since the white neutral is the return for current to flow back to the source, if you were to bond the ground to it, it would then share a path with the neutral and share the current flowing back and becomes a current carrying conductor which it was not meant to do. The ground is only suppose to carry current in a fault condition ie short circuit or ground fault. This is why they are separated. I hope that helps and was understandable.

  • @bobridge5271
    @bobridge5271 4 ปีที่แล้ว +5

    You said that live-to-neutral is 120V but that live-to-live is 220V.....shouldn't that be 240V ? Also, is the neutral bonded with earth in the main panel ? Many thanks in advance for your reply.

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +1

      220, 230, 240,... They are all the same depending on the area you live in. Same with 110, 115, 120.
      Yes in the main panel the ground and neutral are bonded together. Nowhere else.

    • @davidhardin1402
      @davidhardin1402 2 ปีที่แล้ว

      There is a long history on what we used in the past as far as volts go. We actually used 100 volts back in the day and the progressed to 110, 115, 120.

  • @thomassmearcheck2819
    @thomassmearcheck2819 ปีที่แล้ว +1

    im confused when you hooked up a white neutral to a breaker

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +1

      The double pole is 220V

    • @thomassmearcheck2819
      @thomassmearcheck2819 ปีที่แล้ว +1

      Nice video tim ! but shouldn't the 3 wire be black and red to double breaker and white to neutral

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว

      @@thomassmearcheck2819 No one said this was 3 wire...that is typically for when your application requires a neutral.

  • @x7warrior735
    @x7warrior735 2 ปีที่แล้ว +1

    Great Job ⭐⭐⭐⭐⭐ What type/size wire to run 115 ft to a sub panel to 200 Amp Main Breaker Box ?

  • @johnbrandon1416
    @johnbrandon1416 ปีที่แล้ว +1

    It seems hard to find a video or information, easy, about wiring/power cables, running from my house to my disconnected garage when my garage is not really disconnected. Its a 1975 house with an attached walkway to the garage with power cables running up in the attic all the way. Im missing something.

  • @drs4649
    @drs4649 3 ปีที่แล้ว +12

    On a subpanel, aren’t neutrals and grounds supposed to be totally separate??

    • @TimWilborne
      @TimWilborne  3 ปีที่แล้ว +3

      Yes there are David.

  • @WhitneyWarsaw-wq3yt
    @WhitneyWarsaw-wq3yt ปีที่แล้ว +1

    Question...installed sub panel into our shop, when testing its running 110v at box and outlets..but nothing is working?

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +1

      How an electrician to check it out. I won't cost much and you'll know everything is safe.

  • @GymChess
    @GymChess 3 ปีที่แล้ว +2

    For anyone new at a workplace or wherever it's needed or required, the "cosmetic" part of it takes a long time to get a feel for. It can really be a pain in the neck to sit for hours bending and twisting cables and wires only for the looks.

    • @TimWilborne
      @TimWilborne  3 ปีที่แล้ว +1

      Yes. I don't know if you ever stop trying to improve on that!

    • @GymChess
      @GymChess 3 ปีที่แล้ว

      @@TimWilborne And don't ask me how I know... I remember being new at a place and how much time it took to mess around with the wiring and to make it look good, etc. The tasks per se weren't difficult even though I'd never set my foot there before let alone worked with those things in my life. Once you knew exactly what to do and how to do it right it was okay. The trickiest might've been reading the charts correctly, like connecting certain components on to the boards. Anyway, to cut a long story short, the job lasted for 2 months when I had to quit. I used too much time in someone's opinion. In MY opinion, kicking someone out after 2 months is ludicrous.

  • @mohavie2360
    @mohavie2360 7 หลายเดือนก่อน +1

    could you hook up the ground of the subpanel to the ground of the main panel instead of running a seperate ground to the subpanel?

  • @Ho_ten
    @Ho_ten 3 ปีที่แล้ว +3

    Great video for sure. Very informative. So I went to the link on determine wire size and distance. I am running a #6 (copper) from the house to my shed sub-panel. it's 165 feet. Probable will running a window unit at some point. Not running anything big, maybe a fridge, computer, small air compressor. So is number #6 to small at that distance or should I run #4? Setting up a 50 amp panel in the shed. Thanks!

    • @dnwrd34
      @dnwrd34 11 หลายเดือนก่อน

      Did you get the link to work? I couldn't.

  • @PaulJones-bo8gt
    @PaulJones-bo8gt 3 ปีที่แล้ว +1

    Excellent video

    • @TimWilborne
      @TimWilborne  3 ปีที่แล้ว +1

      Thank you very much!

  • @chongxiong2491
    @chongxiong2491 ปีที่แล้ว +1

    Would there be a case were a residential complex would have 480 coming in

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +1

      Maybe on large chillers used for the whole building, elevators, etc but not inside the dwelling.

  • @Stevenyoung100
    @Stevenyoung100 3 ปีที่แล้ว +1

    Literally the best teacher.

  • @Mark-m9z4q
    @Mark-m9z4q 2 ปีที่แล้ว +1

    Thank you for such a good video. God Bless.

  • @KevinCoop1
    @KevinCoop1 4 ปีที่แล้ว +3

    I'm not a controls guy, I worked as design engineer for contractors and consultant from 1983-2018. Since you mentioned it in your video, what is your perceived purpose for the one or two ground rods in the electrical system? Not all sub-panels get them as stated, only if in a different building. Respectfully, Kevin

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +3

      Hi Kevin. As far as one vs two ground rods, NEC 250.56 requires a second ground rod if the ground has a resistance of 25 ohms or more.
      I don't want to get into the argument of whether all sub panels should have grounds or not.

    • @KevinCoop1
      @KevinCoop1 4 ปีที่แล้ว +5

      Tim Wilborne I totally agree with you on higher than 25 ohms requires second rod. In my code classes, it was suggested that it is cheaper to just drive two and forget it. Testing time would be higher cost than installing the second rod.
      What I meant by not all sub panels need ground rods, keeping this conversation in dwelling units, if you have a 200 amp main service panel in a dwelling, it is required to have all available grounding electrodes connected to it. Now put a 100 ampere sub panel in the middle of the dwelling next to the kitchen. No ground electrodes are required. Put another 60amp sub panel in a detached garage, a connection to grounding electrode is required. Note: this requirement of ground electrodes in separate buildings flip flopped back and forth several times between 1981 and 2005 NEC.
      Not looking for any arguments. Hope this clarifies my comment.
      Respectfully, Kevin

    • @ericwotton2046
      @ericwotton2046 2 ปีที่แล้ว

      @@KevinCoop1 I beleive the main purpose of the ground rods in a simple dwelling is for lighting protection. Thats why a sub-panel in an annex building needs a ground rod. It gives a bath for nuisance current to bleed off the system. It also helps the whole electrical system have a reference to work with, one common ground. This becomes important in large buildings with multiple tranformers and sensitive equipment.

    • @KevinCoop1
      @KevinCoop1 2 ปีที่แล้ว +1

      @@ericwotton2046 Sorry I did not get back to you earlier! You are correct!

    • @tenkill
      @tenkill ปีที่แล้ว

      @@ericwotton2046 if you are running 50 feet out to a garage underground and in plastic conduit. would a secondary rod be needed to ground the sub panel from lightning generated electricity coming through the main panel and out to the garage?

  • @heroknaderi
    @heroknaderi 4 ปีที่แล้ว +2

    I appreciate your time. I’m installing a few in my house.😁👍😎 I have a split bus panel. And I’m using my skills and still keeping the rule of six😁

  • @tablatronix
    @tablatronix 2 ปีที่แล้ว +1

    Do feeder terminals have to be torqued for copper?

    • @TimWilborne
      @TimWilborne  2 ปีที่แล้ว +1

      ALL screw terminals are supposed to be torqued.

  • @montimitchell5931
    @montimitchell5931 ปีที่แล้ว +1

    So you’re saying a sub panel needs ground rods driven into the ground and not ran back to the main panel?

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +1

      No. In my locality, sub panels that are in separate buildings must have both a ground from the main panel and a ground rod. You need to check your local laws and codes.

  • @briannorton3205
    @briannorton3205 2 ปีที่แล้ว

    Great video, Tim!

  • @ProjectDadLife
    @ProjectDadLife 3 ปีที่แล้ว +1

    Great video! Subscribed.

  • @oralreid7714
    @oralreid7714 9 หลายเดือนก่อน +1

    You are really good.. thank you sir..

    • @TimWilborne
      @TimWilborne  9 หลายเดือนก่อน +1

      Thank you :)

  • @elsolitario8020
    @elsolitario8020 3 ปีที่แล้ว

    Thanks for the video it helps a lot for my next project. Actually what size of wire i can use from the main panel to the subpanel? Thanks again.

  • @eagle5720
    @eagle5720 4 ปีที่แล้ว +1

    Why a inverter put out current through its neutral leg? I wire a 120v inverter to a two circuit 70amp breaker box and I'm get current through the neutral but I return the inverter cause its 3000watt pure sine wave inverter and can't start my vaccum and my other 2500 watt pure sine wave inverter could run my entire house.

  • @theallaroundguy2399
    @theallaroundguy2399 3 ปีที่แล้ว +1

    What is the main difference between a main panel and a sub panel? Is it just that in a sub panel the ground and the neutral wires have to be on their own bars?

    • @TimWilborne
      @TimWilborne  3 ปีที่แล้ว +2

      Basically. The neutral and grounds must be isolated and a sub panel is powered out of a main panel.

    • @theallaroundguy2399
      @theallaroundguy2399 3 ปีที่แล้ว

      @@TimWilborne I also have another question if you have time. If you were to open up a panel on a new home with three pin wiring and you were to open up a panel on an older home with only two pin wiring how would you tell the difference right off the bat just by looking? Not for sure if you understand this question or not.

    • @PedroPerez-gn6jl
      @PedroPerez-gn6jl 3 ปีที่แล้ว

      Lee Sales kk

  • @aammiranda
    @aammiranda 8 หลายเดือนก่อน +1

    Thank you very much; you are awesome

    • @TimWilborne
      @TimWilborne  8 หลายเดือนก่อน +1

      Happy to help!

  • @user-pt8dz7uk7e
    @user-pt8dz7uk7e 3 ปีที่แล้ว

    Dear Tim
    I have a detached garage 40 foot from the house. I understand that I need a ground bar seperate from the neutral bar. Can I run a seperate grounding rod to this garage subpanel grounding bar? What is a floating ground? Can I run the conductors from the house to the lugs on the sub panel or do I need a seperate disconnect at the subpanel? Thanks

    • @thomasmarable6818
      @thomasmarable6818 2 ปีที่แล้ว

      Yes you run it to the groundbar plus a ground conductor from your main panel

  • @joshuacassino7297
    @joshuacassino7297 3 ปีที่แล้ว +1

    Hello. I currently have a 40amp sub panel and need to accommodate an extra 60amps in it.
    In the 40amp sub panel there is a 15 amp and a 30amp.
    What size breaker do I need in the main?

  • @RighttothePointDIY
    @RighttothePointDIY 4 ปีที่แล้ว +3

    Thank you for a very well done video. I’m putting in a sub panel for a basement apartment. It will have a dryer and an electric stove so I’m going to have a sub panel. My question is related to the ground rod. I initially was going to put my panel on an inside wall but that would mean I would need to run the ground right up through the ceiling and then down to the outside. Can I assume that’s not ideal and I should put the panel on an outside wall? Also, can ground rods be drilled through the concrete slab and into the ground underneath the slab? I’m thinking no but I thought I would check.

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +3

      Definitely want to check with local codes on the ground rod. At least here you could have it one an inside wall and run the ground to the nearest outside wall. I have no idea on the concrete slab, never ran into that situation. I would consult a local electrician, you'll be dollars ahead.

    • @RighttothePointDIY
      @RighttothePointDIY 4 ปีที่แล้ว +1

      Tim Wilborne Thanks Tim. I will do that.

    • @dannycalk8051
      @dannycalk8051 4 ปีที่แล้ว +3

      When you're past your outside main you do not run a ground from the panel to the outside, if you do you're defeating your purpose of having a ground path back to the main panel where the power supply enters the residence, if you ask an electrician be sure and ask someone who knows the code and has experience with installing sub-panels.

    • @Alphasig336
      @Alphasig336 3 ปีที่แล้ว +4

      Having two grounds creates a potential for a ground loop within same building. You can use your main panel ground.

  • @christopher_roger
    @christopher_roger ปีที่แล้ว +1

    No main on the sub panel?

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +1

      Not required but can be there. Remember this varies by locality so check codes applicable to your area.

    • @christopher_roger
      @christopher_roger ปีที่แล้ว +1

      @@TimWilborne it does vary. A requirement for some, a convenience for all. You can back feed a breaker equal to or larger than than the feeder breaker in the main if the sub doesn’t have a main.

  • @David-zv2em
    @David-zv2em 4 ปีที่แล้ว +1

    when you use a double pole, why do some people refer to it as 240 and some refer to it as 220 like you did. What is the difference? Thanks.

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +3

      Nothing. 220, 230, 240, and occasionally the label 200 VAC single phase are all the same. Even across the US there are variations on which term is used

    • @mdhsabh
      @mdhsabh 4 ปีที่แล้ว +6

      @@TimWilborne 110V used to be the standard, so power was called 110/220. Since the standard is 120, it's 120/240. 240=2*120.

  • @MrWaalkman
    @MrWaalkman 4 ปีที่แล้ว +2

    I was going to tell you to stay in your lane, but you're already there. Looks like you've done this a time or two. :)
    I'm not saying that I'm an old electrician, but I still remember doing new installations using TW wire (and thank your lucky stars if you haven't had to pull that garbage into a conduit - however, it does do a great job of pointing out if you haven't reamed your conduit properly).
    I was taught to strip the sheathing off of the Romex cable prior to running it into the panel, and it does make for a little bit tidier of a job. But that's really just how my Journeyman beat it into me, rather than any personal preference (my personal preference being not to be beaten anymore than I had to be).
    Anymore, I would just go ahead and run the second ground rod and be done with it. Copper water lines into the house is a thing of the past.
    And to anyone who wants to do their own wiring, I would suggest visiting a construction site under the guise of being potential buyers and look around to see how the "AHJ" (Authority Having Jurisdiction) wants it done. But be fully prepared to have your job turned down even if you have done your wiring the exact same way as the pros. It's just a homeowner thing, and complaining to the AHJ is only going to make it worse.
    Oh, and:
    1) Bring donuts and coffee.
    2) Show up just before first break.
    3) Keep a sharp eye out for the boss, and if he/she is not there, chat up one of the electricians to see if they would be interested in helping you out. Keep in mind that some shops treat "side work" as a firing offense, which is why you have to make sure that the boss is elsewhere.
    4) Don't be a jerk. Pay in cash.
    And in slow times like these, the AHJ will turn down everyone's jobs pretty regularly to keep his inspector buddies from getting laid off. As an electrician, shop owner or otherwise, it is in your best interest to pay this bribe since what you don't want to see is your normal inspectors having to move on and then you have to break in a new one.

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +1

      Early in my career I pulled some 500 MCM wires one time, I realized really quickly that I better stick with controls.

    • @MrWaalkman
      @MrWaalkman 4 ปีที่แล้ว +1

      @@TimWilborne Oh yeah, that's a workout. Not to mention running the conduit for those cables, including busting a hole for two 4" conduits *horizontally* through a concrete footer. Ever run a jackhammer horizontally? No fun...

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +2

      I never have found the programming port on a jack hammer to make it work.

    • @MrWaalkman
      @MrWaalkman 4 ปีที่แล้ว +2

      @@TimWilborne LOL! The programming port was where my journeyman was going to put his boot if I whined about running the jackhammer. :)
      That really was the installation from heck. We had a heavy rain the day before it was to be inspected (so it was still open for inspection), and the ditch where we had our two 4" PVC runs got completely backfilled with sand. The conduits, being empty, naturally rose to the top of the ditch and were sticking out every fifty feet or so. So we had to hand dig the ditch again, this time being careful not to break our conduits.
      I was happy to see that run get finished.
      Pulling the wire wasn't too bad, we used a capstan puller, and each of us young bucks got to pull the wire off of one spool each. I've been involved in worse pulls... :)
      Another really bad ditch was one that fed a pad mount transformer and went down the center of an alley to the vault. It had eight "known" crossings. A combination of water, telephone, cable TV, power, as well as a sewage line below all of it. It also had one "unknown" crossing which the city neglected to locate for us, and we naturally found it, and removed it, for them. It was an abandoned water line that the city had simply capped off rather than removing. We ripped the unmarked line right out of its corporation (what the city water crew called the connection between the main and the smaller water line).
      Ever see how much water can come out of a 3/4" hole at 800 PSI? It's prodigious...
      The city tried to blame us, claiming that we were responsible for items that they had missed. Right.
      Our company wasn't having any of that nonsense, and the city got to fix and pay for the damage. It wouldn't have been as bad but the corporation was mounted at about twenty degrees from horizontal and the water pressure undercut a large portion of the parking lot to an attorney's office which collapsed into the ditch.
      Of course the ditch filled up in no time at all, and that little hole was now providing the center of Colorado Springs with a decent sized stream for the kids to play in. So there's always an upside.
      And this was also one of those runs that had to be encased in concrete, so we had that to deal with as well once the carnage got cleaned up.
      We also had to run a ditch for our power behind a strip mall that we were wiring. We had contracted a guy to cut the trench with his Ditch Witch. The only located line was a telephone line marked for us by Ma Bell. As the dutiful apprentice, I offered to hand dig that section out for him. He said "Don't bother, I can feel the cable with my stinger". Nonetheless I went to the truck to get a shovel, but by the time that I had gotten back the stinger on the Ditch Witch was wrapped up in an array of multicolor wires from the cable.
      Kinda reminded me of a Christmas tree...
      He had hit a one thousand pair cable that carried the long distance calls from Colorado Springs to Denver. As well as being used for communications to and from Norad. So yeah, not a good cable to have an accident with...
      Ma Bell (Mountain Bell) employees started popping up like popcorn all over the place. They were easy to spot, white shirts, black slacks, and all with unpleasant looks on their faces.
      The downtime was $1,000 a minute. The bonding company refused to cover the damage, citing "stupidity". That was the end of his company, and much of his personal possessions. My boss did a back door deal with him to buy his Ditch Witch so that he could have a bit of cash to live off of until he could sell his house to cover (a portion of) the damages. Ma Bell wasn't taking any prisoners on this one.
      He offered to help cut a new ditch, which had to go thirty or forty feet in both directions from the damaged spot (you have to remove a large section because the wire insulation gets ruined closer to the cut). The Ma Bell splicers said "Thanks, but you've done enough".
      The first thing that the splicers did when they had their new ditch dug, was to dig out "thrones" for themselves in the wall of the ditch to provide a place for them to sit while they made their splice. Pretty obvious to me that they were going to be there for awhile. It took them thirty hours to splice in a new section.

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว

      @@MrWaalkman Yes I knew I guy that hit one of those 1000 pair cables. Not fun.

  • @Roadglide911
    @Roadglide911 3 ปีที่แล้ว +1

    220v arc welder and a 220v air compressor. What size sub panel and gauge wire should I use? Approx 150’ run from disconnect to building.

    • @mikey4016
      @mikey4016 3 ปีที่แล้ว +2

      Not all 240V arc welders are the same and not all 240V air compressors are the same. First you would need to know the maximum amperage draw from them, then you would need to go to a voltage drop calculator such as: www.southwire.com/calculator-vdrop
      I think the NEC allows a maximum voltage drop of 5%, but I would shoot for no more than a 2% voltage drop, even though Southwire recommends a 3% voltage drop.

  • @jw6829
    @jw6829 4 ปีที่แล้ว +1

    I’m putting a breaker box in a cargo trailer and using a 50 amp rv plug would I wire the breaker box the same way

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +3

      RV wiring has it's own section of NEC code, check it out.

    • @jw6829
      @jw6829 4 ปีที่แล้ว

      Thank you I’ll check it out

  • @ozzmann3217
    @ozzmann3217 3 ปีที่แล้ว +1

    What do I do if I have a full main breaker box and want to add a sub panel ? Is there a Way to grab one of my other breakers for the sub panel? I’m not going to use this as my only source just want to see if my project is even possible I basically have a full breaker and the original basement outlet and so many others outlets and lights are on one single 15 amp breaker so I wanted to add a circuit for basement for my workshop and sub panel seems the only choice i have

  • @camandbrenny
    @camandbrenny 4 ปีที่แล้ว +1

    Hey great job Tim thank you much for sharing... found this very helpful.. and from a guy whose just getting started on some youTube content myself truly enjoyed it.

  • @richardmclendon8314
    @richardmclendon8314 4 ปีที่แล้ว +3

    Can I run a subpanel from another subpanel? I have a subpanel about 20 feet from where I want to install one. My main breaker panel is about 100 feet away.

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +2

      Probably but your should get an electrical to have a look to determine if you can for sure

  • @goose1451
    @goose1451 4 ปีที่แล้ว +2

    You mentioned a link to calculate the wire size based on load and distance. Do you have that available? I’ll be running to a sub panel 100’ run from the main. I’m unclear on exactly what type of feeder breaker I need. But will need at least 75 amp feeder.

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +1

      Hi Wes. See link below.
      www.theautomationstore.com/wiring-determining-wire-size-and-voltage-drop-for-amps-240-120-vac/

    • @goose1451
      @goose1451 4 ปีที่แล้ว

      @@TimWilborne 2AWG it is! Thank you

    • @4RyanEck
      @4RyanEck 2 ปีที่แล้ว

      @@TimWilborne thanks Tim, do you also have a chart that shows the size for neutral and ground for the sub panel?

  • @LightWalker03
    @LightWalker03 9 หลายเดือนก่อน +1

    Thank you much

    • @TimWilborne
      @TimWilborne  9 หลายเดือนก่อน +2

      You are very welcome

  • @atrank
    @atrank 4 ปีที่แล้ว +1

    I have a sub panel in a garage, fed by 4 wires (2 hot, neutral, and ground). The neutral bar in the sub panel is not bonded to ground and I believe/read it should NEVER be bonded in a sub panel. I have 3 things attached to the sub panel- a three prong outlet for a compressor, an air conditioner (3 wire), and an electric garage heater (3 wire). All are 240v (or 220?). I do not have a separate grounding rod for the sub panel. The sub is 4 feet from the main panel and I added a grounding bar to the sub panel. *****The question is... should the ground for each of the 3 connections be connected to the ground bar or neutral bar in the sub panel? I cannot find the answer anywhere!!! Thanks!

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +4

      Ground should always be connected to ground. Ground is a non current carrying conductor. Neutral is a current carrying conductor. Never mix them up.

    • @atrank
      @atrank 4 ปีที่แล้ว

      @@TimWilborne thanks!

  • @jspeed51
    @jspeed51 4 ปีที่แล้ว +4

    I liked the Napoleon Dynamite dancer in the last scene there.

  • @daniielzarate
    @daniielzarate 4 ปีที่แล้ว +1

    Hello Tim So I would like to know if it legal and not against the code to come out from a 200A 208y/120v 3phase panel to a 100A 208y/120 single phase?

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +2

      Yes it is legal but reach out to a local Electrician so you can get the details right

  • @homershamlimited2889
    @homershamlimited2889 2 ปีที่แล้ว +1

    Where can I get your T-shirt?

    • @TimWilborne
      @TimWilborne  2 ปีที่แล้ว +1

      We never put that shirt out publicly but we get enough request that we should! Here are the shirts we have.
      timwilborne.creator-spring.com/

  • @rikityrik
    @rikityrik 2 ปีที่แล้ว +1

    Don’t quit your day job there buddy…. Oh wait, nevermind. Jk lol.
    Enjoyed this, good information and well put together. Thanks for sharing!
    Btw that panel you flashed on the screen looked killer!!🤩

    • @TimWilborne
      @TimWilborne  2 ปีที่แล้ว +2

      Haha, I know to stay in my lane. That panel that I showed was artwork and that takes many years of practice.

  • @wildwoodtop
    @wildwoodtop 3 ปีที่แล้ว +2

    4:38 also some child tamper-resistant / idiot protective safety built in 😊

  • @x7warrior735
    @x7warrior735 2 ปีที่แล้ว

    Excelent Job ⭐⭐⭐⭐⭐

  • @spencerwyche2552
    @spencerwyche2552 4 ปีที่แล้ว +2

    I like to go close to the back of the stud so I won have toi use nail plates.

    • @taylorlightfoot
      @taylorlightfoot 3 ปีที่แล้ว +2

      You then have to worry about nails from the outside siding into the "back" side of the stud. Always drill an appropriately sized hole in the middle of the stud. If you're using the correct size drywall screws, you don't need to worry about nail plates.

  • @robertknull456
    @robertknull456 3 ปีที่แล้ว

    I need to add more circuits. I have a 100 amp fuse box and I would like to add a sub panel with about 16 to 24 circuits. Can I add a sub panel rated for 125 amps to a 100 amp main panel?

  • @Montanafield
    @Montanafield 3 ปีที่แล้ว

    When running the feed from main panel to sub panel is the conduit required if inside wall?

  • @masterroaster1109
    @masterroaster1109 4 ปีที่แล้ว +2

    So I'm running a 12/2 to a 20 amp in my sub, do I connect white and black to the breaker screw and the ground bar?

    • @masterroaster1109
      @masterroaster1109 4 ปีที่แล้ว +2

      And the ground to the ground bar?

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +6

      No. You should consult an electrician before proceeding. It will be a small price to make sure you don't burn anything up.

  • @classicv8dude268
    @classicv8dude268 ปีที่แล้ว

    I’m using white wire for 20 amp breakers

  • @mipuntodevista3988
    @mipuntodevista3988 3 ปีที่แล้ว

    Question: Is it ok to add a subpanel to the main panel even so the main panel does not have a main breaker? Hope my question makes sense. Thanks in advance!

    • @wiley0714
      @wiley0714 2 ปีที่แล้ว

      Your main panel would have a main breaker. Then in your main panel you would install another breaker which would send power to your sub panel.
      If you put in a 200 amp panel you would have two 100 amp breakers. On one leg of that panel you could install let's say a 50 amp breaker and then run power from that into a subpanel.

  • @blackseabrew
    @blackseabrew 4 ปีที่แล้ว +1

    I'm and automation engineer who live on a farm. Been upgrading wiring and panels. The most recent of which was installed almost 50 years ago when I was three. One question...why does the ground rod need to be at least 6' from the panel? As in what's the real purpose of the distance? Not the NEC answer.

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +3

      Where does it say that in NEC code? It is suppose to be a few feet from the structure, I assume so it is truly grounded and not up against the footers of the building and if you have two ground rods then they must be 6' apart, but I've never heard that they have to be 6' from the panel.

  • @traceyfrink6574
    @traceyfrink6574 10 หลายเดือนก่อน +1

    That bit is called an AUGER BIT

    • @TimWilborne
      @TimWilborne  10 หลายเดือนก่อน +1

      I can't recall, did I call it something different in the video?

  • @wiley0714
    @wiley0714 2 ปีที่แล้ว +1

    Ya lost me.
    If I had a double pole breaker. That means I have one breaker that has two outputs. I would put my black wire into one of them. And then I would put my red wire into the other pole.
    Let's say I had 12 three wire. I would have a bear ground wire, a red wire and a black wire, and the white wire would be the neutral wire.
    I don't understand why you would put a white wire which is generally a neutral wire into your breaker?

    • @TimWilborne
      @TimWilborne  2 ปีที่แล้ว +1

      Not all 220VAC requires a neutral. For example this is a common dryer plug that you would use a 2 w/ ground...black, white, ground.
      amzn.to/3SJ7GpD

  • @adamwagner7105
    @adamwagner7105 2 ปีที่แล้ว +1

    Not bad, but still need to watch another video to pull the power and run the conduit. Not a full subpanel install video. Basic "wire any panel" with the exception of the ground bar being different in a sub panel.

  • @pramodkarande9855
    @pramodkarande9855 4 ปีที่แล้ว +1

    What is gfci outlet

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +3

      Gound Fault Circuit Interrupter... Depending on where you are located they may be referred to as a Residual Current Device.

  • @bradleycoles8273
    @bradleycoles8273 3 ปีที่แล้ว

    what size subpanel are you using in the video?

  • @urhuck1eberry
    @urhuck1eberry 4 ปีที่แล้ว +4

    You got a lot done in 12 mins. Lol

    • @TimWilborne
      @TimWilborne  4 ปีที่แล้ว +2

      Yes I usually do a half a days work while drinking my coffee :)

  • @Rico702Vegas
    @Rico702Vegas ปีที่แล้ว +1

    So 120V + 120V = 220?? Man I need more math lessons lmfao. You are definitely not an electrician.

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +1

      Here is your video #jerkalert 😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂😂 😂😂😂😂😂😂😂😂
      th-cam.com/users/shortsCjHqWe-JZpg

  • @joro18d93
    @joro18d93 ปีที่แล้ว +1

    You didn’t explain wiring the right side as you said you would.

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +1

      Seems like I did, what parts was unclear?

  • @danschuster5187
    @danschuster5187 3 ปีที่แล้ว +2

    I didn't know u knew electrical too my man

    • @TimWilborne
      @TimWilborne  3 ปีที่แล้ว +1

      Just the basics, not the art of doing it like an everyday electrician :)

  • @jakearmstrong4563
    @jakearmstrong4563 ปีที่แล้ว +1

    I don’t mean to be that guy I just would absolutely never use that bit it is just too comically large to even justify picking up instead of a paddle bit. Seriously a whole set of diablos is like $20

    • @TimWilborne
      @TimWilborne  ปีที่แล้ว +1

      You mean spade bits? Nah, I can't agree with you on that one. An auger bit takes less effort. Let the rolls do the work. And I have shorter ones for tight spaces but this one is much easier on the body.

    • @jakearmstrong4563
      @jakearmstrong4563 ปีที่แล้ว +1

      @@TimWilborne alright fair enough i concede