Coba pakai alat gitu kn ndak rusak tu jalan alny rata rata penggalian pipa pdam dan pipa seluler bikin jalan rusak emang ditambal tp tak padat an bikin jalan bergelombamg
I had an experience to use the method over 3.4 kms. This is only useful for crossing river or structure. My project was for waste water pipe line network. The staffs who use the method in Vietnam promised it's really good method for network pipeline in soft ground. They advertised it proudly. However, Manhole installation must be matched with it. They expressed that Manhole installation would be carried out by Top Down method not Open Cut method. Eventually they ended up to carry out open cut. They hadn't any experience the manhole work. They took some money for pipe installation and gave up all the remaining works. I was really disappointed their attitude.
Sisa-sisa kenang-kenangan Bos
nice presentation
Good job bro....salam satu profesi
Salam satu propesi
Coba pakai alat gitu kn ndak rusak tu jalan alny rata rata penggalian pipa pdam dan pipa seluler bikin jalan rusak emang ditambal tp tak padat an bikin jalan bergelombamg
I now every things about this work
Good job
Euh. Tipikal pekerja lapangan +62.... Sambil udud.. 🤪🤪😁😁
Mantap
Форвард RX 11*44 ✌
Все чотко.молодцы!!
Could of chosen better music hahahaha
David Smith I was thinking the same thing hahaha
Yep.. Lol
video yang keren bang, bagi saya yg masih newbi. oh iya kalo untuk analisa harga satuan HDD ini didapat dimana ya bang? terima kasih sebelum nya
Pak sya mau tnya klw hdd untk pipa 300mm itu tembakan 200mtr memakan waktu brpa hari y
Itu buat ditanami kabel traffic light ya?
ESSA E FRAQUINHA PRA ESSE DIAMETRO IDEAL SERA XZ180
dimana bisa sewa alat itu ya? perlu untuk jarinngan FO
Pipa untuk air individu bisa nggak kira kira? Berapa tatifnya?
To many people for those small shots
sehari bisa boring sampe berapa meter om mesin hdd nya?
It detects sound waves sent by drill head
Im 5 years operator and scanner ..
Music is annoying !
долго ох как долго, я за 1 день 200 метров делаю 110-ки
all day long to cross that street? ,looks like they fused 300 mts just to cross a30 mts street
Hahaha.....
The marking on the pipe said 54m.
Buat pemasangan pipa hdpe
I had an experience to use the method over 3.4 kms. This is only useful for crossing river or structure. My project was for waste water pipe line network. The staffs who use the method in Vietnam promised it's really good method for network pipeline in soft ground. They advertised it proudly. However, Manhole installation must be matched with it. They expressed that Manhole installation would be carried out by Top Down method not Open Cut method. Eventually they ended up to carry out open cut. They hadn't any experience the manhole work. They took some money for pipe installation and gave up all the remaining works. I was really disappointed their attitude.
Correct Broo..Hdd technology is not accurate in the case of drainage works..The pipe slope and gradient is not correct.
Itu buat apaan
pcc d mana pa da yg bs d hubungi tim...
Klo tanya sewa alat hubungi kemana y
I looking for a job I am machine operator for vermeer and ditch witch somebody is interested to give me a job let me know
Where are you located
Hlo
Fungsinya dari digitrak buat apa bang?
berapa harga sewanya pak? nomor yg bisa dihubungi berapa?
Berapa biayanya?
Hey I don't think that pipe is supposed to be jerking around like that when you start your pullback. But what do I know 😅🤙
i need HDD machine for rent with man power for visakapatnam
No exit pit either
Child's play
Maaf boss, kalau kita mau sewa ala ini bisa hubungi siapa? Terima Kasih sebelumnya
Buat di mana pak....kami menyewakan mesin hdd pak..
Hitungan sewa nya gimana ya pak untuk daerah cikarang perlu
Di sub kan saja pak, kami siap mengerjakan
I am tracker..5yars.i need job.
Too long. here in the US this service would take a maximum of 2 hours
They were paid by the hour thats why it took too long.
还招工人吗?我想去应聘
Cara mengarah ujung drillnya agar sesuai dgn lintasan yg telah di tentukan,bagaimana pak???misalkan pola lintasannya letter S...
Trm ksh
Itu di ujung bor nya ada semacam sensor bisa di control kedalaman dan arah nya dari alat yang di atas
Hahaha hahaha, they don't know how to do this job.
explain, please.