Ecotec Head Installation & Torque Sequence (Part 4)

แชร์
ฝัง
  • เผยแพร่เมื่อ 5 ก.ย. 2024
  • Continued on the build for the Cobalt SS. Set the head on the block and torque down the studs to ARP SPECS OF 80 FT LBS. The two stage torque down sequence for factory head bolts however are: 1st stage is 22 lb ft of torque for all 10 head bolts. 2nd stage is 155 degrees for all 10 bolts. As always please like and subscribe to receive the latest content on the Cobalt build and or if you are an Ecotec/Cobalt enthusiast!! Thanks ya'll for visiting and hopeto see ya'll soon. Feel free to give me any pointers in the comments below.

ความคิดเห็น • 74