The difference between crusher run and 3/4 limestone gravel

แชร์
ฝัง
  • เผยแพร่เมื่อ 4 พ.ย. 2024

ความคิดเห็น • 57

  • @moparedtn
    @moparedtn ปีที่แล้ว +4

    As somebody who's owned a rather steep gravel driveway for 25 years, I can tell you that crusher run is nice
    to keep graded and for regular passenger cars to drive on.
    What it is *not* good for is staying in place during summer storms - rain washes crusher run off pretty easily.
    We really don't have much choice but to use 57 stone (3/4"), especially on steeper parts of our road.
    - Ed on the Ridge

  • @espy0008
    @espy0008 7 หลายเดือนก่อน

    One of the most overlooked products in creating gravel drive ways and parking spots is the use of geo grid.

  • @lakelivingb8409
    @lakelivingb8409 2 ปีที่แล้ว +1

    Thank you for info as I am looking to add a back out addition to a slight incline.Going with crush and run.

  • @JeepArmyUSA
    @JeepArmyUSA ปีที่แล้ว +1

    I like using a 1-2” layer of 3/4 Clean to dress the top of the driveway. 3/4 Clean does not have all the dust and fines in it, 3/4 Minus does. So heads up if you’re new to this.

  • @dwaynekoblitz6032
    @dwaynekoblitz6032 ปีที่แล้ว +1

    That explains so much. Actually. Thank you

  • @OriginalWhiteDevil
    @OriginalWhiteDevil ปีที่แล้ว +4

    Crusher run is only mildly dusty once it gets compacted. It's one of the cheapest bases you can buy and also the most effective.

  • @jeffcarter8160
    @jeffcarter8160 3 ปีที่แล้ว +1

    Hey, that helped me trying to get both. Just a thin layer on top. Thanks

  • @denjhill
    @denjhill ปีที่แล้ว +6

    Hate to differ with you but my experience is different. The base layer I use is always the bigger stone, all the way up to 3-4" with no fines. This is topped with 1.75" to fill the voids and lock the big rock in place. On top of that goes the 5/8" with fines to build a very smooth cemented together surface. Here in the far NE Washington state area the soil is clay. Small rock simply sinks into it and is gone forever without providing a benefit. The best solution is to use road fabric to stop everything from sinking into the mud.

    • @again5162
      @again5162 11 หลายเดือนก่อน

      The roadworkers use that barrier fabric here, good luck to the next guy reworking that spot

    • @jejoko
      @jejoko 11 หลายเดือนก่อน

      In Florida the process is similar but not the same. It's all about the soil you have in the area or lack of it and the materials you have to work with.
      Here, all we have is crushed cement or limestone. 57 rock is our best bet for top layer since it rains so much.
      In other areas people would never use crushed cement (1 1/4 minus) as a base layer but here it's used all the time on top of 3 to 4 inch rock to create a base and then 57 rock (3/4 clean) on top of that.

  • @tclodfelter8789
    @tclodfelter8789 ปีที่แล้ว +3

    Crusher run WILL wash out on ANY incline with a hard rain! It's a good base but I need heavier rocks like #57, or heavier, that won't wash away in moderate rainfall...

  • @BRIANVANDUYN
    @BRIANVANDUYN 2 ปีที่แล้ว +2

    3/4 can compact under the right circumstances. I have heavy dump trucks driving on my driveway and it does compact down but it doesn’t really cement together like crusher run

    • @BRIANVANDUYN
      @BRIANVANDUYN 2 ปีที่แล้ว

      The biggest benefit of 3/4 is you don’t get the mud slinging up like you do with crusher run , it also hides the water on the road better

    • @OriginalWhiteDevil
      @OriginalWhiteDevil ปีที่แล้ว

      ​​@@BRIANVANDUYNI made a driveway out of crusher run and have no mud slinging around. I park a log truck on that weighs 21,000 lbs when loaded. The benefit of 3/4 is it looks a lot better, but because it doesn't compact, heavier vehicles create ruts if it's layered too thick.

  • @billyflanagan9657
    @billyflanagan9657 ปีที่แล้ว +2

    I understand the dust can cause eye and skin iritation according to the msds. I am doing a dog kennel and my landscaper put it down as a base.Its a mess

  • @swiss6253
    @swiss6253 2 ปีที่แล้ว +6

    How many tons can I put in the back of my Miata?
    I went to go pick up some, I said 15 tons please and they refused.

  • @HighRoad317
    @HighRoad317 ปีที่แล้ว

    Appreciate the education!!

  • @vburke9232
    @vburke9232 3 ปีที่แล้ว +3

    thank you very much

    • @edujanddad6099
      @edujanddad6099 3 ปีที่แล้ว

      Your welcome, glad it was helpful

    • @gravelhub3429
      @gravelhub3429  3 ปีที่แล้ว

      Glad it helped

    • @samuelliao9216
      @samuelliao9216 2 ปีที่แล้ว +1

      Dear manager,
      Longyi New patented built-in classifiers dry grinding machines already put into mass production.
      1.Powder from 325~4000mesh, fineness is adjustable
      2.Built-in high efficiency classifier, no more investment cost for classifying system.
      3.Smart PLC operation system, and integrated control system: 1 computer could operated max 6 machines, saving management cost.
      4.No particle air pollution, more environment-friendly.
      5.Compact structure to save factory space and lower foundation construction cost.
      For limestone
      The whole grinding system power is around 370Kw, the real working power is 80% 296KW
      1.D97=23um (600mesh) Output: 10tons/h Energy Consumption: 29.6Kw/Ton
      2.D97=16um(800mesh) Output: 8tons/h Energy Consumption: 37Kw/Ton
      3.D97=10um (1250mesh) Output: 4.5tons/h Energy Consumption: 65.7Kw/Ton
      4.D97=6.5um(2000mesh) Output: 2.5tons/h Energy Consumption: 118.4Kw/Ton
      For Talc powder,
      Longyi powder grinding mill power is 250Kw, the real working power is around 200~225Kw, including classifying system.
      A. D90=10.5~10.7um output: 4 tons/hour
      B. D90=9.8~11um output: 3 tons/hour
      It is suitable for processing nonmetallic minerals such as calcium carbonate, calcite, Kaolin, clay, barite, talc, gypsum, limestone, calcium oxide, bentonite, dolomite etc.
      Samuel
      MP/Wechat/whatsapp: +8615105956429

    • @sdhillon901
      @sdhillon901 6 หลายเดือนก่อน

      What do you recommend for semi truck parking lot …

  • @BarryHull
    @BarryHull ปีที่แล้ว

    Excellent!

  • @potawatadingdong
    @potawatadingdong 3 ปีที่แล้ว +1

    Will laying a thin layer of 3/4 on top of crush help it with running water? Part of my driveway is going to have a dip in it which may have running water through it in heavy rain. I'm trying to keep from using concrete and it's too small for a culvert.

    • @stevenferro
      @stevenferro 2 ปีที่แล้ว

      over time water and heavy rain ruins everything. You haven't really given enough information for someone to give you good advice. It sounds like you need a small culvert with small headwalls at inlet to prevent erosion. If you can't do this then maybe look into placing excavating, placing geotextile to prevent weeds, placing riprap or 4" clear stone, then placing geotextile again and then placing your driveway granular on top. If you do this the water will run right through your rip rap area which is sandwiched between the earth and your driveway so it's held in very tight and the big stones wont move. Also, you can always use a culvert you just need to build the driveway up over a longer distance.

  • @W333dm4n
    @W333dm4n 3 ปีที่แล้ว

    is 3/4&2"Crushrun mix good for drainage? I don't want a bunch of water chilling under my pavers then freezing and lifting them all up or should I just do 3/4 clear and HPB especially because I dont own a gas compactor plate.

    • @HuyTran-tc8cw
      @HuyTran-tc8cw 3 ปีที่แล้ว

      Ditto...would also like to know. I would like to install this under artificial turf in a contained area bit worried about drainage and pooling water.

    • @stevenferro
      @stevenferro 2 ปีที่แล้ว

      @@HuyTran-tc8cw crusher run is not good for drainage because you are taking a giant rock and crushing so you basically get stones/grains of every size. This means all the gaps are filled. If you only get stones of 1 size it means that there are a lot of gaps so this will drain. You should be using HPB which is high performance base under you pavers because it doesn't compact and it drains very well and it is very strong even though it doesn't compact.

    • @stevenferro
      @stevenferro 2 ปีที่แล้ว

      it's very important that when you are finished excavating and before you place the gravel you have to slope the subgrade. This way water that gets into your granular base will drip down until it his the subgrade and then because the subgrade is sloped it will run to the sides and you can keep your granular base dry. Make sure that it doesn't pond once it drains to the sides of your driveway. You need a way for that to drain out.

  • @jejoko
    @jejoko 11 หลายเดือนก่อน

    Thank you for this video! Is crusher run the same as 1 1/4 minus?

  • @seanhaardt
    @seanhaardt 2 ปีที่แล้ว

    Thanks for the video. I've got a muddy parking area for 4 cars. 3 of the spots are fine. One on the corner is a litte muddy. Do I need to put down crussher run before or just go with the 3/4? Thanks for the vid.

    • @jeremygourde9880
      @jeremygourde9880 2 ปีที่แล้ว +3

      3/4 will pack down into the soft dirt and firm the base back up

    • @seanhaardt
      @seanhaardt 2 ปีที่แล้ว

      @@jeremygourde9880 Thanks so much Jeremy! Learned a lot.

    • @samuelliao9216
      @samuelliao9216 2 ปีที่แล้ว

      Dear manager,
      Longyi New patented built-in classifiers dry grinding machines already put into mass production.
      1.Powder from 325~4000mesh, fineness is adjustable
      2.Built-in high efficiency classifier, no more investment cost for classifying system.
      3.Smart PLC operation system, and integrated control system: 1 computer could operated max 6 machines, saving management cost.
      4.No particle air pollution, more environment-friendly.
      5.Compact structure to save factory space and lower foundation construction cost.
      For limestone
      The whole grinding system power is around 370Kw, the real working power is 80% 296KW
      1.D97=23um (600mesh) Output: 10tons/h Energy Consumption: 29.6Kw/Ton
      2.D97=16um(800mesh) Output: 8tons/h Energy Consumption: 37Kw/Ton
      3.D97=10um (1250mesh) Output: 4.5tons/h Energy Consumption: 65.7Kw/Ton
      4.D97=6.5um(2000mesh) Output: 2.5tons/h Energy Consumption: 118.4Kw/Ton
      For Talc powder,
      Longyi powder grinding mill power is 250Kw, the real working power is around 200~225Kw, including classifying system.
      A. D90=10.5~10.7um output: 4 tons/hour
      B. D90=9.8~11um output: 3 tons/hour
      It is suitable for processing nonmetallic minerals such as calcium carbonate, calcite, Kaolin, clay, barite, talc, gypsum, limestone, calcium oxide, bentonite, dolomite etc.
      Samuel
      MP/Wechat/whatsapp: +8615105956429

    • @DKSorg
      @DKSorg ปีที่แล้ว +1

      @@seanhaardt You might need to dig out the muddy section and start again as well.... The KEY is WATER Management.... Does the water POOL or Drain? You might need to check out French Drains to help the water shed,

  • @chhouksophuan6848
    @chhouksophuan6848 3 ปีที่แล้ว

    How Density Crushed Stone 1Cum3 To Kilogram?

    • @stevenferro
      @stevenferro 2 ปีที่แล้ว

      You have to perform a proctor test to find that out. Every gravel is slightly different so you can't just use the same density for all crushed stone. it's usually around 2300kg/m3

  • @willielowe6895
    @willielowe6895 ปีที่แล้ว +3

    Still waiting to here how to chose 🤔

    • @stephanie5249
      @stephanie5249 ปีที่แล้ว +3

      Listen to his list of pros and cons of each, and what application they’d be appropriate for… then apply that knowledge to your project 🤷‍♀️

    • @willielowe6895
      @willielowe6895 ปีที่แล้ว

      @@stephanie5249 👍🏾

  • @samuelliao9216
    @samuelliao9216 2 ปีที่แล้ว

    Dear manager,
    Longyi New patented built-in classifiers dry grinding machines already put into mass production.
    1.Powder from 325~4000mesh, fineness is adjustable
    2.Built-in high efficiency classifier, no more investment cost for classifying system.
    3.Smart PLC operation system, and integrated control system: 1 computer could operated max 6 machines, saving management cost.
    4.No particle air pollution, more environment-friendly.
    5.Compact structure to save factory space and lower foundation construction cost.
    For limestone
    The whole grinding system power is around 370Kw, the real working power is 80% 296KW
    1.D97=23um (600mesh) Output: 10tons/h Energy Consumption: 29.6Kw/Ton
    2.D97=16um(800mesh) Output: 8tons/h Energy Consumption: 37Kw/Ton
    3.D97=10um (1250mesh) Output: 4.5tons/h Energy Consumption: 65.7Kw/Ton
    4.D97=6.5um(2000mesh) Output: 2.5tons/h Energy Consumption: 118.4Kw/Ton
    For Talc powder,
    Longyi powder grinding mill power is 250Kw, the real working power is around 200~225Kw, including classifying system.
    A. D90=10.5~10.7um output: 4 tons/hour
    B. D90=9.8~11um output: 3 tons/hour
    It is suitable for processing nonmetallic minerals such as calcium carbonate, calcite, Kaolin, clay, barite, talc, gypsum, limestone, calcium oxide, bentonite, dolomite etc.
    Samuel
    MP/Wechat/whatsapp: +8615105956429

    • @ziabashir
      @ziabashir ปีที่แล้ว

      Thank you for valued comment

  • @bleesed7878
    @bleesed7878 ปีที่แล้ว

    Mr.johnson Felipe drink in the job again

  • @thomasneessen9125
    @thomasneessen9125 3 ปีที่แล้ว

    What happens when some yahoo wants to spin his tires on the 3/4? Or do donuts on the weekend? That’s going to fling it all over, won’t it?

    • @jeremygourde9880
      @jeremygourde9880 2 ปีที่แล้ว

      Yup gonna sling it all over and make ruts in the stone if it’s laid thick enough

  • @ида0101
    @ида0101 3 หลายเดือนก่อน

    What is that accent?

    • @Rick-the-Swift
      @Rick-the-Swift 3 หลายเดือนก่อน +1

      You must be from up north or the big city. He's obviously from Arkantexahoma. I can tell that and I'm from Kentuckiana 👋🤠

  • @Midnitexowboy
    @Midnitexowboy 3 ปีที่แล้ว

    BY GOLLIE

  • @stevenferro
    @stevenferro 2 ปีที่แล้ว +4

    Crusher run and 3/4 limestone are the same thing. In order to get 3/4 limestone you have to crush it. Your nomenclature is very laymen like and you aren't explaining what's going on here. The difference between the two gravels that you are showing is that the second one has all the fines washed out of them. When you call something 3/4 gravel or 3/4 limestone gravel you are just naming the largest size of the stone. So that's why I am saying that 3/4 crusher run is the same as 3/4 gravel. The only difference is that someone told the gravel pit that when they order 3/4 gravel they don't want any grains of gravel less than 5mm or 1/8" in the mix. That's the important part of all this. Now with this information you can go to any gravel pit and order exactly what you want. If you go to any gravel pit and order 3/4 limestone all you are doing is saying that you want limestone type gravel and the largest size of the stone is 3/4". Unless there is a standard in your area, you are going to get a slightly different product where every you go because some placed will make the cut off point at the low end at 1/8" or 1/16' etc. What you are missing is the gradation curve for gravel. google it and you will understand.

    • @samuelliao9216
      @samuelliao9216 2 ปีที่แล้ว

      Dear manager,
      Longyi New patented built-in classifiers dry grinding machines already put into mass production.
      1.Powder from 325~4000mesh, fineness is adjustable
      2.Built-in high efficiency classifier, no more investment cost for classifying system.
      3.Smart PLC operation system, and integrated control system: 1 computer could operated max 6 machines, saving management cost.
      4.No particle air pollution, more environment-friendly.
      5.Compact structure to save factory space and lower foundation construction cost.
      For limestone
      The whole grinding system power is around 370Kw, the real working power is 80% 296KW
      1.D97=23um (600mesh) Output: 10tons/h Energy Consumption: 29.6Kw/Ton
      2.D97=16um(800mesh) Output: 8tons/h Energy Consumption: 37Kw/Ton
      3.D97=10um (1250mesh) Output: 4.5tons/h Energy Consumption: 65.7Kw/Ton
      4.D97=6.5um(2000mesh) Output: 2.5tons/h Energy Consumption: 118.4Kw/Ton
      For Talc powder,
      Longyi powder grinding mill power is 250Kw, the real working power is around 200~225Kw, including classifying system.
      A. D90=10.5~10.7um output: 4 tons/hour
      B. D90=9.8~11um output: 3 tons/hour
      It is suitable for processing nonmetallic minerals such as calcium carbonate, calcite, Kaolin, clay, barite, talc, gypsum, limestone, calcium oxide, bentonite, dolomite etc.
      Samuel
      MP/Wechat/whatsapp: +8615105956429

    • @nastybastardatlive
      @nastybastardatlive ปีที่แล้ว +3

      They also sell washed and unwashed stone in my local quarry.