Sir same doubt here, for example if Run time is 50 minutes and peak eluted 20 minutes.than what is criterea of (h) value .near peak OR take up to 50 minutes .
It should be over a distance>or = to 5 times width at half height of main peak Ex. Main peak height is 50 cm so at 25 cm measure width, suppose it comes 2cm so you take > or = to 10cm on both side of main peak
Sir want to know during integration of LOQ solution peak in empower what should be start time and end time for baseline noise . Plaese must reply and give me your contact no. I want to talk to you
Thanks sir for sharing your valuable information
Very good and Exact explained, thanks sir
Excellent explanation chacha
Nice information sir
Thanks for clearity
Very nice and clear but in some videos the background music is quite irritating, my suggestion would be to remove them.
How do you get H in the first place? Is that from the average value of h?
your videos so useful sir, thanks lot
Sir download the mechanism for measuring the quantum yield of carbon dots using quinine sulfate as standard please
Excellent sir ..
Great Sir
What's the limit of S/N ratio
Why validation is required pls explain sir
Thank u sir this video is very useful
Can you please repeat why the 2 factor is there?????
It's mean u have to indicate capital -H2&H2 instead of for noise base line (h2&h2)
Is it method 1 or method 2 sir?
I agree with your disclaimer 😂
Please sir give one lecture on how to select dissolution parameters and dissolution media
Sir please take classes on stability study's
Sir, i have a doubt about the limits of LOQ and LOD limits
i.e., LOQ is 10:1
LOD is 3:1
why we should consider these limits why not the other?
Amazing sir
Sir same doubt here, for example if Run time is 50 minutes and peak eluted 20 minutes.than what is criterea of (h) value .near peak OR take up to 50 minutes .
It should be over a distance>or = to 5 times width at half height of main peak
Ex. Main peak height is 50 cm so at 25 cm measure width, suppose it comes 2cm so you take > or = to 10cm on both side of main peak
please explain how LOD= 3 x [C]/(S/N), LOQ= 10 x [C]/(S/N)
Sir, from which reference book I can learn all this technical concept apart USP?
Snyder book for method deve6
Limit of detection s n ratio
👍👍
Sir want to know during integration of LOQ solution peak in empower what should be start time and end time for baseline noise . Plaese must reply and give me your contact no. I want to talk to you
Why calculated s/n
One example
Hplc calibration