Reworking The Track Plan! | O Gauge Layout Build Series Update 10

แชร์
ฝัง
  • เผยแพร่เมื่อ 4 พ.ย. 2024

ความคิดเห็น • 24

  • @RolandForest
    @RolandForest ปีที่แล้ว

    Thumbs up. Credit to you being flexible in your design

  • @1800clyde
    @1800clyde ปีที่แล้ว

    That is an interesting set-up; IMHO being able to continuously run and do switching is the way to go. Sometimes a swing-and-a-miss leads to a homerun; you're on your way now. Look into building kits. I know Lionel has some for houses, but there may be some older industrial kits that are a fraction of the price, and it's not a total kitbash task. Some spray paint and glue and good-to-go. Thanks for sharing your work.

    • @triplertrains
      @triplertrains  ปีที่แล้ว +1

      Funny you say that because I just ordered a kit as well as some old Lionel pieces to assist in some scratch building metal shingles.

  • @TwistedMacGyversTrains
    @TwistedMacGyversTrains ปีที่แล้ว

    I really like the new track plan and I also like the idea of not having a town. Something about lots of track sidings and switches are what I like as well. Keep up the great work!

  • @MatecaCorp
    @MatecaCorp ปีที่แล้ว

    I really like the new track plan. If you wanted to you could add a loading/unloading platform for the tank cars and maybe a few tanks so it's kind of another industry

  • @tobystubbystrains5206
    @tobystubbystrains5206 ปีที่แล้ว

    I like it, having a switch yard and passing track and 2 loops. I've been trying to think of a good layout with a switch yard. I do like the small switcher engines too, I want Lionel new 0-6-0 tank engine with the electro mag couplers.

  • @Stussmeister
    @Stussmeister ปีที่แล้ว

    A very nice video and layout. I'd also like to add that flexibility and adaptability are useful skills to have in model railroading, as the layout plan I have currently is much different than the one I started with when I first got into model railroading about five years ago.

  • @Rob1_5
    @Rob1_5 ปีที่แล้ว

    The ideas with the storage tracks going into the mountains are definitely unique. I've been to the Former K&T railroad in Stearns Kentucky, it was coal and lumber hauling short line railroad back in the day. You should research that for inspiration on your lumber mill and coal mine, while the standard Guage cars don't go into the mountains it's still a pretty good prototype for your infrastructure like the coal tippel and things, you could even put the tippel building on the mountain and have the chute that loads the cars go down into the mountain and load the car s while the cars are in the mountain.

  • @brucegibbs2118
    @brucegibbs2118 หลายเดือนก่อน

    Very nice

  • @williamkaczmarek3996
    @williamkaczmarek3996 ปีที่แล้ว

    I like your layout. I've got a 4X12 foot table and I'm trying to figure out how to set it up for two main lines and some areas for switching operations too.

  • @johnknippenberg-LandmarkYards
    @johnknippenberg-LandmarkYards ปีที่แล้ว

    Looking good! 😎👍

  • @brucegibbs2118
    @brucegibbs2118 7 วันที่ผ่านมา

    Nice

  • @LiamBMP
    @LiamBMP ปีที่แล้ว

    Cool video. 👍

  • @deweyhall712
    @deweyhall712 ปีที่แล้ว

    The hobo union called. They said, that you're missing the hobo camp..

  • @northpennvalleysteamrailroad
    @northpennvalleysteamrailroad ปีที่แล้ว

    Awesome 😊

  • @Gilstrains
    @Gilstrains ปีที่แล้ว

    👍🚂🚞🚞🚞🚞✌Great intro, great video.

  • @allanmartinez1190
    @allanmartinez1190 ปีที่แล้ว

    Did you ever think about using Lionel 48 radius Remote switches? This way you wouldn't have to go everywhere on the Layout too throw the switches just stand by your transformer & switch controls. Do you think you will be interested in making a video segment or a two-part episode on wiring your Layout? That is my weakness. I have no idea & knowledge on wiring a Layout? BTW Your Layout is looking Great I want to see a lot more

    • @triplertrains
      @triplertrains  ปีที่แล้ว

      The cost of those O48 remote switches was a bit out of the realm of what I wanted to spend unfortunately.
      Also O48 switches would have left me with less yard room on an already cramped layout.

  • @RolandForest
    @RolandForest ปีที่แล้ว

    yikes...not much room left for structures? Will you consider adding another table making this a "L" layout?...add the mining operation on that table

    • @triplertrains
      @triplertrains  ปีที่แล้ว +1

      I do actually have plans to add on but we will see 🤞🏻

    • @RolandForest
      @RolandForest ปีที่แล้ว

      @@triplertrains best of luck …will keep watching

  • @kingjulian9496
    @kingjulian9496 10 หลายเดือนก่อน

    Any new layout updates since this one

    • @triplertrains
      @triplertrains  10 หลายเดือนก่อน +1

      Been working on the upper loop mountain on the left side. I’ve been super busy with work and life but hopefully making an update video soon.

    • @kingjulian9496
      @kingjulian9496 10 หลายเดือนก่อน

      @@triplertrains very cool. I've watched your videos from the very start. I was one of the first 40 to your channel. I'm always impressed with how your coming along with the layout. Anyways happy holidays you and your family. Look forward to the next udate.