Orange Line Metro Train Lahore | How to Turn Around Orange Line Metro Train | iEngineer Ali |
ฝัง
- เผยแพร่เมื่อ 25 ต.ค. 2020
- Orange Line Train Lahore, First Public Day of Orange Line Train Lahore | Do you know how to turn the Orange Line Train | First officially day of Orange Line Train Lahore |
Orange Line is an automated rapid transit system in Lahore, Pakistan. The line is Pakistan's first metro train since the Karachi Circular Railway which had closed its operations during 1999. The line spans 27.1 km with 25.4 km elevated and 1.72 km underground.
Operator: Lahore Metro
Stations: 26 (24 elevated, 2 underground)
Operating speed: 80 km/h (50 mph)
Track gauge: 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Status: Completed (Operational 2020)
Line length: 27.1 km (16.8 mi)
Electrification: Third rail 750 V DC #iEngineerAli #OrangeLineTrain #OrangeLineTrainLahore #LahoreOrangeLineTrain #Orange #Line #Train #Lahore #OrangeTrainLahore #LahoreOrangeTrain #OrangeLineMetroTrainLahore #LahoreOrangeLineMetroTrain #OLMT #LahoreOrangeTrain #OrangeLineLahore
Mashallah very Nice
Assalam o Alaikum brother ALLAH PAK ka A or HAZRAT MUHAMMAD ﷺ ka M capital likhta ha or MASHA ALLAH SUBHAN ALLAH ka spelling b Sahi likha Kara plz 🤲🤲🤲🤲🤲
Shahbaz Sharif Zindabad
Ma to aj tak yahi sochti k ya line Kesy change krti mtpb wapis jaty to plateform dosri trf hota ha na
Bhai ma Lahore ma rhta ho lekin mane ye cheese kabi nahi dheke
How electricity is provide to train?through batteries or some other mean?
Desi Technology 😂😂😂
Nee how 😃😃
😀😀
You're wrong. It's not automatic and can't be operated without train opertaor (driver).
hmmmm
tu yeh driverless nahi hai?
Automatic bi hai or Driver bi control kr skty hain
@@iEngineerAli we will proud then we will drive and make metros in pakistan.
of course
Job k bare me b btao ager is me job krni ho to ?
krni hai
@@iEngineerAli g sir krni he
Please give me the details sir
Mene ICOM Kia huwa he or BCOM Ka student Hun
Pmln Zindabad