Delhi Meerut RRTS Corridor Extended to Haridwar | Rapid X | Namo Bharat Train | Papa Construction
ฝัง
- เผยแพร่เมื่อ 27 ม.ค. 2024
- Title- Delhi Meerut RRTS Update | Meerut Metro | Rapid Rail Projects in Delhi NCR | Papa Construction
Suggested Video-
Delhi Meerut Expressway- • Delhi Meerut Expresswa...
Delhi Meerut RRTS - • NCRTC || Delhi Meerut ...
Delhi- Gurugram RRTS- • RRTS - Delhi- Gurugram...
Rapid Rail Project- • NCRTC-Rapid Rail RRTS ...
Delhi Dehradun Expressway- • Delhi Dehradun Express...
---------------------------------------------------------
To subscribe the channel- / @papaconstruction
Facebook Page- / papa.constrn
Instagram- / papa_constrn
Twitter- / papa_constrn
Email- papa.constrn@gmail.com
----------------------------------------------------------
The Delhi-Meerut Regional Rapid Transit System (Delhi-Meerut RRTS) is an 82.15 km (51.05 mi) long, semi-high speed rail corridor currently under construction which will connect Delhi, Ghaziabad, and Meerut. It is one of the three rapid rail corridors planned under Phase I of the Regional Rapid Transit System (RRTS) project managed by the National Capital Region Transport Corporation (NCRTC). With a maximum speed of 180 km/h (111.85 mph), the distance between Delhi and Meerut will be covered in less than 60 minutes. The project will cost ₹30,274 crore (US$3.8 billion) and will have 24 stations, including two depots at Duhai and Modipuram. Length of the corridor: 82 km (51 mi)
No. of stations: 14
Names of stations: Sarai Kale Khan, New Ashok Nagar, Anand Vihar, Sahibabad, Ghaziabad, Guldhar, Duhai, Muradnagar, Modinagar South, Modinagar North, Meerut South, Shatabdi Nagar, Begumpul and Modipuram.
No. of depots: 2
Names of depots: Duhai and Modipuram.
8 stations were constructed exclusively for local transit services in Meerut: Partapur, Rithani, Brahmapuri, Meerut Central, Bhaisali, MES Colony, Daurli and Meerut North. 4 stations for which both RRTS and local transit services in Meerut will be provided: Meerut South, Shatabdi Nagar, Begumpul and Modipuram. Of the entire length, 68.03 km (42.27 mi) is elevated, 14.12 km (8.77 mi) is underground. and 1.45 km (0.90 mi) will be at grade for connections to two depots to be located at Duhai and Modipuram. In densely populated areas of Delhi and Meerut the route will be underground including near the Yamuna river. The entire route is designed for a maximum speed of 180 km/h (111.85 mph), with an operating speed of 160 km/h (99.42 mph). The average speed (when taking stops into account) will be approximately 100 km/h (62.14 mph).
YOGA HEALTH INDUSTRY in Rishikish/Haridwar will be greatly boosted by this connection. Students from across the world can fly into Delhi and simply take a 2 hour Namo Bharat Train to their yoga school.
@@Confucianism03030 All international travelers. It's the best option for Haridwar/Rishikesh. Delhi Airport to Metro to Namo Bharat
@@Confucianism03030 mini bullet train kya hota hai bhai?? Woh RRTS se sasti hogi kya??? Ticket price kam kardo aur fhir poora system hi ghate main jai hai na?? Pehli baat toh , haridwar NCR main padta nahi hai aur agar RRTS ban bhi gaya , toh fhir bhi iske beech main bahut stations padenge. Jaldi bhi pahuchna hai aur ticket ke zada paise bhi nahi dene aisa nahi ho sakta. Poora system debt main jayega fhir. Kisi koi kuch faida nahi hota usse long run main.
@@Confucianism03030 arey bhai pehle line poori banne toh doh. train khali jayegi toh govt/authorities most probably apne ap hi kiraya kam kar degi . yeh train waise bhi daily passengers ke liye hai . students and working class mainly.
जब केंद्र में भ्रष्टाचार नहीं होता है तो इसी तरह की तरक्की होती है देश में और रोजगार मिलता है
जब केंद्र में कांग्रेस की सरकार होती थी तो खूब भ्रष्टाचार होता था और देश में कोई तरक्की नहीं होती थी ना कुछ डेवलपमेंट होता था ना एयरपोर्ट हॉस्पिटल रेलवे स्टेशन डेवेलोप होता था
आज रेल्वेस्टेशन होटल जैसा लगता है
कांग्रेस मर जाए।
ALL FUTURE RAIL SHOULD BE SUPER HIGH SPEED IF WE WANT TO BE SUPER POWER UP TO 2047.....
bhai aapki video dekh ker dill khush ho gaya
RRTS shiuld be further extended upto Rishikesh Yog Nagri station which will provide direct connetivity to Rishikesh Rudraprayag Railway line.
Delhi to Haridwar within 2 hours wow ❤
Well done , haridwar must be in this network , another means to add up to haridwar .
Love from Muzaffarnagar ❤❤❤
Bhai sahab ager gaziabad NCR me nahi hota to vo gaon hi hota or muzaffarnager bhi Saharanpur se chhota h
Nice useful information ji.Thanks.
Extension till Haridwar will be a super hit plan . Al Delhi NCR commuters will travel through Rapid mtero
इसे नैनीताल तक भी एक्सटेंशन करना चाहिए।
पाकिस्तान तक ले जाए क्या😂😂😂 नैनीताल पहुंचने तक 50 साल लगेंगे। अभी पानीपत और अलवर तक का काम शुरू नही हुआ और तुम बात कर रहे हो नैनीताल की
So amazing hai bhai ❤❤❤❤❤
Please provide details about delhi panipat rrts also. When will the work start for the same
Meerut ur Hardwar ke beech padnai walai stations kon sai hongai.
Iss better h ki existing rail network ko upgrqde karke semi-bullet train chalao.
Delhi alwar rrts pey Kab kaam start hoga sir aur ispey central government sey approval aagaya kya?
Usse better haridwar tak vande bharat chaloa do muzaffarnagar tak thik hai kyu ki wo ncr mei hai
haridwar tak vande bharat to already hai (dehradun tak actually)
delhi to haridwar vande bharat se 4hr lagte hai, rroughly 800rs, agar ye kaam RRTS se 2hr mai aur ek affordable price mai ho payega to maza aa jayega
Saabaas Beta Construction
Dehradun tak extend karna chahiya.. tourism ko bhadhava milega..
must be extended upto Dehradun and Rishikesh.
Muzaffarnagar se Panipat Mila do circle ban jayega #rapidrail #rrts #ncrtc
Muzzfarnagar tak
baki ky rrts ky corridor mei construction kb strt hogi
Sir Delhi to SNB,Alwar ka kya update h
Bhi abhi election ki vjh se declare kar rhe
Start to tb samje ki jamin pr kam sure ho
Why not Dehradun?
March to aa gya 35 km he chali Hui ha
Bhai ye meerut se aagey nh jaygi.
RRTS till Muzaffarnagar may be feasible but it will be an overkill to expand till Haridwar.
Actually we can skip muzaffarnagar and take train to haridwar rishikesh. Lot of people go there everyday
@@jamesbond4045 wah what a suggestion. Kaha se laate ho aisi brilliant ideas???? Muzaffarnagar is part of NCR. haridwar is outside of NCR and u want to skip muzaffarnagar and extend directly to UK??
@@akshaykumar-zz1mk which means that parts of UK will come under NCR then or will an SPV be formed to build this?
@@akshaykumar-zz1mk thats what im saying that NCRTC is specifically for NCR region only. since when did roorke, haridwar , rishikesh etc become a part of NCR ??? have u read the NCRPB act ???
@@jaguarunleashed4935
Abe mera matlab hai muzaffarnagar par stop nahi kare, aage tak leke jaein. I know route to hardwar from delhi goes via muzaffarnagar roorkee.
😂😂😂क्या यह इसी जन्म में चालू हो जाएगा? हमारे सहारनपुर जिले में कुछ भी नहीं काम चल रहा है 😂😂😂😂😂
अगर आप 80-85 के हो गए हो तो आपके अगले जन्म में ही चालू होगा,😂
@@anishverma4533 😂😂😂अभी तो हम पचास साल में चल रहे हैं। क्या अब भी हमें अगले जन्म में रेलवे का काम होना शुरू होगा 😂😂😂😂
@@vijaypaltyagi3042sharanpur bijnore walo ne gand macha rakhi dehradun masoori tehri me or rampur muradbad walo ne haldwani us nagar me kash ye roorki manglore block laxar or us nagar ni hota uk me or baki jagah fje bhoo kanoon hota
82km 1 hr 😢😢
Saharanpur tak bhi hona chahiye
saharanpur gaon hai
Sharanpur me mulle sab tod denge 😂
1999me haridawar ka jila Saharanpur hi tha
@@NITINKUMAR-jd5ie accha but saharanpur top 10 city me bhi nahi ata hai up me
Haryana ki govt kya kar Rahi hai, sonipat ka budget pass pehle hua tha, kuch bhi nhi hua idhar meerut Tak chal bhi padegi
किराया बहुत महंगा है भाई कोई नी जाएगा इसमें