Heat Shrink Cable Joint - 11kV 3 Core XLPE & EPR High Voltage Cable Joints

แชร์
ฝัง
  • เผยแพร่เมื่อ 13 พ.ค. 2014
  • THORNE & DERRICK INTERNATIONAL | SHRINK POLYMER SYSTEMS UK MAIN STOCKISTS
    Contact us for Competitive Prices & Fast Delivery from Stocks
    To See The Full Shrink Polymer Systems Range That T&D Offer Click Here -
    www.powerandcables.com/manufa...
    SPS 11kV heat shrink cable joints are tested and specified to joint high voltage 3 core power cables with XLPE or EPR insulation and steel wire armour (SWA) and steel wire braid (GSWB) - cable joints can utilise either compression connectors or mechanical shear bolt connectors.
    To See The Full Range Of High Voltage Cable Joints, Terminations & Connectors Click Here -
    www.powerandcables.com/produc...
    11kV heat shrink cable joints are ideal for direct burial, overhead and vertical cable jointing of 3 core cables.
    T&D provide both stock and manufacturing solutions for a broad range of offshore and marine specification cable joints including standard cable joint products to BS6883, BS7917, NEK606, IEEE1580, MCGH and IEC60092-3, including options for flame retardant and fire resistant cables to IEC-60332 and IEC-60331.
    SPS high voltage cable joint kits are designed and tested to BS7888 and Cenelec HD 628 S1 and HD 629 S1 - HV cable joints kits are available to joint XLPE, PILC, PICAS, EPR and Triplex high voltage power cables at 6.6kV, 11kV, 15kV and 33kV voltages.
    17.5kV, 24kV and 33kV 3 core cable joints utilising heat shrink technology are also available.
    SPS Heat Shrink Cable Joints & Cable Terminations - Quality Performance Testing: Shrink Polymer Systems heat shrink cable joints and cable termination kits are tested to BS7888 which incorporates Cenelec Standards HD 628 S1 and 629.1 S2 : 2006, DIN VDE0279 and IEC60502.
    BLOGS | Cable Joints & Terminations
    High Voltage Cable Joints
    www.powerandcables.com/highvo...
    Some Thoughts On MV HV Heat Shrink Cable Joints & Cable Terminations
    www.powerandcables.com/heat-s...
    MV Cable Accessory Technologies | Heat Shrink, Cold Shrink & Push-on
    www.powerandcables.com/mv-cab...
    3M Terminations | Surface Tracking on Medium Voltage Cable Terminations by 3M Electrical
    www.powerandcables.com/3m-ter...
    Cold Shrink vs Heat Shrink - The Real Difference
    www.powerandcables.com/cold-s...
    #heatshrink cablejoints #11kv
    THORNE & DERRICK INTERNATIONAL
    Thorne & Derrick International are specialist distributors of LV, MV & HV Cable Installation, Jointing, Duct Sealing, Substation & Electrical Equipment - servicing UK and global businesses involved in cable installations, cable jointing, substation, overhead line and electrical construction at LV, 11kV, 33kV, 66kV and EHV.
    Stocking & Supplying Duct Seals | Cable Cleats | Cable Glands | Electrical Safety | Arc Flash Protection | Cable Jointing Tools | Cable Pulling | Earthing | Feeder Pillars | Cable Joints LV | Joints & Terminations MV HV | UK & Export Sales
    Phone: +44 (0)191 410 4292
    Email: uksales@thorneandderrick.co.uk
    www.powerandcables.com/
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 1K

  • @lel5338
    @lel5338 2 ปีที่แล้ว +97

    Today once again the TH-cam algorithm has reunited us here to watch this random video at 3am

    • @Jason-wm5qe
      @Jason-wm5qe 2 ปีที่แล้ว +4

      I can relate to this

    • @marcosramirez7595
      @marcosramirez7595 2 ปีที่แล้ว +1

      Damn right... 1:36am
      I was watching tennis games.... Then this

    • @sincezver
      @sincezver 2 ปีที่แล้ว

      Пор до р за ми для лендинга на о

    • @SpeedomusicSM
      @SpeedomusicSM 2 ปีที่แล้ว

      😅😅😅

    • @charliederrick1583
      @charliederrick1583 2 ปีที่แล้ว

      This is my dads company i too do not know how this has happened

  • @RanmaKei
    @RanmaKei 8 ปีที่แล้ว +335

    Now I can splice my 11kV primary line for my new secret laboratory. I origionally ran my primary too short. This will solve my problem so I can resume taking over the world.

    • @MouseGoat
      @MouseGoat 7 ปีที่แล้ว +33

      Just watch out for annoying sisters and/or midget rivals.

    • @suibora
      @suibora 7 ปีที่แล้ว +3

      dexters laboratory lol

    • @user-rn5ip9ec6j
      @user-rn5ip9ec6j 4 ปีที่แล้ว

      @Eìon O'hInneirghe ha ha ha ha ha haa

    • @pammullinsx6026
      @pammullinsx6026 4 ปีที่แล้ว +1

      Learn how to spell "originally" first, then think about taking over, please.

    • @trevorvanbremen4718
      @trevorvanbremen4718 4 ปีที่แล้ว +4

      Just a heads up for ya on your 'world conquest'.
      It's going to take a LOT of effort to get past my 500kV energised faraday cage I've built as a 'panic room'.
      I guess you COULD just wait for the batteries to run down, but since Elon Musk grabbed all the Li-Ion cells, I chose to use a Thorium-based LFTR inside the cage instead.
      Given the half life of my Thorium stockpile, I think I should be god for about 13 or so billion years

  • @rafdavfl
    @rafdavfl 9 ปีที่แล้ว +178

    Being a retired electrician, I can tell you that is a back breaking job out in the real world. That cable weights a lot and it man handles YOU. Vid is a good one for showing how it's done, and I wish it was just as easy in the real world. He did a great job on that cable.

    • @FoodOnCrack
      @FoodOnCrack 7 ปีที่แล้ว +14

      yeah this video is a best case scenario, inside, cable nicely elevated from the ground and supported....

    • @samuelencanacion74
      @samuelencanacion74 5 ปีที่แล้ว +6

      Definitely not that easy in a manhole/vault, and that's me doing single conductor 1mil mcm

    • @davep6977
      @davep6977 5 ปีที่แล้ว +11

      When I did 3 phase splices, I always staggered my butt joints

    • @wb5mgr
      @wb5mgr 5 ปีที่แล้ว +17

      I've seen it done standing in a trench while a sump pump was running to remove the water the guy was standing in... not exactly laboratory conditions...

    • @nh2805
      @nh2805 4 ปีที่แล้ว +3

      @@davep6977 this is a high voltage joint,you cannot place connections where u would want..there are strict measurements the jointer must follow

  • @atnstn
    @atnstn ปีที่แล้ว +1

    Look at how methodical this gentleman is with every point of the work process. This is almost medicinal.
    Electrical high voltage installations deserve the utmost attention and highest standards. Long-term safety first.

  • @nielsdaemen
    @nielsdaemen 3 ปีที่แล้ว +167

    How many layers of protection do we need?
    Engineer: *YES*

    • @gorillaau
      @gorillaau 3 ปีที่แล้ว +1

      Engineer2: More Layers!

    • @ArthursHD
      @ArthursHD 3 ปีที่แล้ว +8

      11kV 3 Core XLPE & EPR High Voltage ⚡ If you do it above the ground than one layer of air is sufficient :)

    • @nwgd
      @nwgd 3 ปีที่แล้ว +1

      @@gorillaau more!

    • @mohammedvlogs1978
      @mohammedvlogs1978 3 ปีที่แล้ว

      What is need for safety this connection after not any problems

    • @badwyahmed9446
      @badwyahmed9446 3 ปีที่แล้ว

      @@ArthursHD فبررر

  • @phuturephunk
    @phuturephunk 8 ปีที่แล้ว +187

    I don't know what it is, but these industrial cabling demonstrations are friggen fascinating to no end.

    • @MrSheaonemillion
      @MrSheaonemillion 8 ปีที่แล้ว +3

      +phuturephunk i have little to no experience in anything electrical. i'm kind of handy, do my own work on the car. For some reason i've been watching the shit out of these!

    • @GTOMEX110
      @GTOMEX110 8 ปีที่แล้ว +5

      Yes they are I'm an electrician and this are very critical connections you have to be trained how to do them

    • @DoRC
      @DoRC 7 ปีที่แล้ว +4

      phuturephunk ok good I'm glad I'm not the only one that fell down this rabbit hole.

    • @aayushrathod4029
      @aayushrathod4029 7 ปีที่แล้ว

      phuturephunk

    • @bigmike1009
      @bigmike1009 7 ปีที่แล้ว +2

      Live LV jointing is more fun especially on old lead cables

  • @tengkusulaiman
    @tengkusulaiman ปีที่แล้ว +3

    To all electrician in this world, you have done great job to keep this world running.

    • @lobbyhoe01
      @lobbyhoe01 23 วันที่ผ่านมา +1

      since no one said it yet, on behalf of every proud electrician: thanks!

  • @EqualsThreeable
    @EqualsThreeable 3 ปีที่แล้ว +86

    Me: “I’m not going to watch the entire things.”
    Also me: *watches entire thing*

  • @99beta
    @99beta 8 ปีที่แล้ว +759

    That would be a pain in the ass if you connected the wires and forgot to slide the shrink wrap on first.

    • @freddiemaxwell8959
      @freddiemaxwell8959 8 ปีที่แล้ว +48

      +99beta Exactly what I was thinking. That step should have been in the first part of the video.

    • @PlasmaHH
      @PlasmaHH 8 ปีที่แล้ว +38

      +FREDDIE MAXWELL you mean the part at 0:11 ?

    • @yavvkolev7502
      @yavvkolev7502 8 ปีที่แล้ว +19

      Not a big worry, there is zip heat shrink, that can fit on a cable without sliding.

    • @KurtRichterCISSP
      @KurtRichterCISSP 7 ปีที่แล้ว +6

      What a world! :D

    • @Engineer9736
      @Engineer9736 7 ปีที่แล้ว +5

      yavv kolev It may exist (good info!), but your boss probably wants you to follow the company workinstructions :-)

  • @JohnBobrek
    @JohnBobrek 8 ปีที่แล้ว +429

    Can't believe I watched that whole video.. and enjoyed it. How did I end up here anyway?

    • @SD-pu5yp
      @SD-pu5yp 8 ปีที่แล้ว +4

      This is true, but it might be more of a sales pitch. There are lots of manufacturers of cable joints so they were probably demonstrating how there joints are done. Compared to say a raychem, sicame or tyco joint. Someone might see this and say that's quicker than the joints they use. Or it might be a training video for apprentices.

    • @IsaacOLEG
      @IsaacOLEG 8 ปีที่แล้ว +3

      +John Bobrek they did get the bad guy and send him to jail :)

    • @hokiepokie333_CicadaMykHyn
      @hokiepokie333_CicadaMykHyn 5 ปีที่แล้ว

      And can you believe, that this guy gets paid only in tips!
      That's why the women become dancers.

    • @derek-stader3445
      @derek-stader3445 4 ปีที่แล้ว

      It’s funny you said that John Borneo as I was thinking the same thing!! Haha! I’m in the electrical industry so naturally, I was mesmerized ✌️🤓

    • @pascalcoole2725
      @pascalcoole2725 4 ปีที่แล้ว

      Same here

  • @Blackjack4141
    @Blackjack4141 8 ปีที่แล้ว +292

    im just here soldering 12v dc connections

    • @Devil_inside-
      @Devil_inside- 5 ปีที่แล้ว +4

      😄😄😄😄

    • @stevenkaiellie5821
      @stevenkaiellie5821 4 ปีที่แล้ว +2

      😂😂😂😂

    • @Lewdacris916
      @Lewdacris916 4 ปีที่แล้ว +5

      hope you are using heat shrink :P

    • @TronicYaka
      @TronicYaka 4 ปีที่แล้ว +1

      @@Lewdacris916 or at least heat sleeves :D

    • @ElectroniQ
      @ElectroniQ 3 ปีที่แล้ว

      Heavy Duty 12v DC connections xD

  • @bummler1
    @bummler1 2 ปีที่แล้ว

    Diese Montage in der Nacht bei strömenden Regen unterm Zelt, da fängt der Spass erst an......

  • @americanpirate2091
    @americanpirate2091 4 ปีที่แล้ว +6

    Oh god , this takes me back to watching AEP safety videos , those guys are always working in a perfectly dug out ditch with no mud or water , rubber blankets everywhere with plenty of wipes , 🤭😂🤣😂 that never happened for me at any point in my career. Still kept the power on for people tho 👍🏾 , people are always happy to see the power guy as long as he is there to turn you back On and not Off .

  • @thebishtable
    @thebishtable 3 ปีที่แล้ว +3

    Some day, I'll be out drinking and the power will go out. That's when the skills I learned today will come in handy.

  • @FreeZLO
    @FreeZLO 5 ปีที่แล้ว +75

    Синей изолентой сверху забыл.

  • @PatrickBaptist
    @PatrickBaptist 6 ปีที่แล้ว

    I won't even be doing something even close to this big ever so I dunno why I watched but it was fun! Best job I ever seen done !

  • @ianbrown1089
    @ianbrown1089 4 ปีที่แล้ว +25

    And I thought I was a hero when I repaired the end of a garden hose this weekend...

  • @gowdsake7103
    @gowdsake7103 3 ปีที่แล้ว +5

    Love to see this done in a howling gale and lashing rain ! . Its a big boys version of what I would do on a mains cable

    • @mfx1
      @mfx1 2 ปีที่แล้ว

      You wouldn't do it in those condition, you'd set up a tent or worst case wait for better weather.

    • @booboo699254
      @booboo699254 2 ปีที่แล้ว +1

      @@mfx1 I'm sure that's what he meant... with a tent. But howling gale and lashing rain would still be happening and making the work difficult.

  • @louisnel894
    @louisnel894 2 ปีที่แล้ว +2

    Very amazing tbh, did not think its so complicated. Alot of work going into this :)

  • @mohammedtarik6293
    @mohammedtarik6293 ปีที่แล้ว +2

    Bravo pour l'électricien qui a raccordé cet câble 👍

  • @1800Supreme
    @1800Supreme 7 ปีที่แล้ว +132

    me when I'm trying to glue my headphone wires back together.

  • @dantheman20127667
    @dantheman20127667 4 ปีที่แล้ว +158

    This is how engineers imagine it's done in the field

    • @MrKristyon
      @MrKristyon 4 ปีที่แล้ว +8

      How does it actually work in the rain and mud?

    • @element-1254
      @element-1254 4 ปีที่แล้ว +8

      @@MrKristyon pretty badly

    • @bigredc222
      @bigredc222 4 ปีที่แล้ว +24

      Try doing it without all those special tools, just a utility knife and a tape measure.
      We were replacing a five kv line at a veterans hospital that shorted out, we worked about 30 hours strait, half of it in the rain, I made up one end, another guy made up the other end in a vault underground, I guess he was too tired, we turned it on, and it blew the man hole cover about 50' in the air, so I had to do his splice all over, it held the next time we turned it on, that was a bitch.

    • @Guust_Flater
      @Guust_Flater 4 ปีที่แล้ว +5

      @@MrKristyon Yes. In the field they build a tent first.

    • @mikewillard4073
      @mikewillard4073 3 ปีที่แล้ว +2

      20mins per joint - this video proves it

  • @TheJonathanc82
    @TheJonathanc82 9 หลายเดือนก่อน

    Love watching these types of videos. It is an art to be able to do this kind of work cleanly and precisely.

  • @fdc_zotei52
    @fdc_zotei52 ปีที่แล้ว

    One of the coziest video in my collection. Often watching it before sleep

  • @Tangobaldy
    @Tangobaldy 9 ปีที่แล้ว +6

    I so enjoy watching nonfiction videos.

  • @porousorificePilot
    @porousorificePilot 6 ปีที่แล้ว +8

    So two really big wire nuts are out of the question, I'd imagine !

  • @SocietyUnplugged
    @SocietyUnplugged 2 ปีที่แล้ว

    With 4.6m views and 20K likes it's fair to say that nobody was looking for this but everybody needed.

  • @akash-zg4vj
    @akash-zg4vj 4 ปีที่แล้ว

    Look at that work man looks flawless

  • @mikelboi87
    @mikelboi87 8 ปีที่แล้ว +8

    I dont have the slightest idea what any of this video is about. OR why I watched the entire thing completely mesmerized.

    • @daveissound
      @daveissound 8 ปีที่แล้ว +3

      +Michael Stevens (LeFevre) its the music

    • @MrSheaonemillion
      @MrSheaonemillion 8 ปีที่แล้ว +1

      +Michael Stevens Same, check out High voltage cable termination vids, its like porn i dont get it, but its So Good.

    • @DavidG2P
      @DavidG2P 5 ปีที่แล้ว

      @@MrSheaonemillion is this a new trend, like watching ASMR?

    • @MrSheaonemillion
      @MrSheaonemillion 5 ปีที่แล้ว

      @@DavidG2P if it is I wouldn't know, i have never known what's cool or trending.

  • @Copper.Cowboy
    @Copper.Cowboy 8 ปีที่แล้ว +6

    I was waiting for him to pull out a huge heat gun lol. I use a lighter to melt my shrink wrap, his was a little larger.

  • @rajeshkrtewari2543
    @rajeshkrtewari2543 4 ปีที่แล้ว

    Extremely Excellent
    You proved, Practice makes a man perfect.

  • @Terribleguitarist89
    @Terribleguitarist89 5 ปีที่แล้ว +17

    *pulls out massive soldering iron* I've got this guys!

  • @vlvrad21
    @vlvrad21 4 ปีที่แล้ว +46

    На стенде конечно хорошо, а посадить этого спеца в канаву, где по щиколотку воды со снегом, сверху дождик. Если наращивал, один вопрос, а если ремонт обрыва - где маркировка фаз?

  • @oscarmapalad2053
    @oscarmapalad2053 2 ปีที่แล้ว +1

    I was a retired electrician too and experienced high voltage cable splicing ,it's very delicate and complicated steps to follow to perform this job .

  • @stevendouglas3860
    @stevendouglas3860 4 ปีที่แล้ว +1

    I love these (pre- Internet) VHS videos demos.

  • @ocsrc
    @ocsrc 5 ปีที่แล้ว +32

    This is really nice work. Too bad no one spends the time to do this.
    My first boss fired me the first day.
    He said I did really great work, and that he never needed to worry if my connection would hold.
    He said he never needed to worry about the inspector finding something wrong with my work
    But he told me he would be out of business if he kept people like me.
    I took way to long, because I did all the steps and did it right.
    He had guys that just used butt connectors from home Depot and some 99 cent electric tape
    True story

    • @sujitkumarsingh3200
      @sujitkumarsingh3200 5 ปีที่แล้ว +3

      Sorry to hear this. It is true that people are greedy.

    • @michaelbarnhill2685
      @michaelbarnhill2685 5 ปีที่แล้ว +3

      What was the application?
      There is a engineering quote that says, sometimes good enough is best.
      Granted, I believe those decisions should be left up to the engineer

    • @user-rn5ip9ec6j
      @user-rn5ip9ec6j 4 ปีที่แล้ว +1

      @@michaelbarnhill2685 yes this aplikation .. Naturlich ha ha ha ha ha ha ha . ho ho ho ho ho ho.

    • @frankieromnimon5898
      @frankieromnimon5898 4 ปีที่แล้ว

      If your boss was a high-voltage lines contractor and fired you for the reasons you mention, he should have his license revoked. I imagine his luck was holding up around the time he fired you and had not killed anyone yet from negligence.

    • @ocsrc
      @ocsrc 3 ปีที่แล้ว

      @@frankieromnimon5898 at the time I was fired he had not had any fires yet
      A few years later he had his first, then his second.
      I moved out of the area and don't know if any more happened
      I know several buyers had issues with outlets and switches and lights not working and had repairs done.

  • @danishn.s3876
    @danishn.s3876 7 ปีที่แล้ว +51

    How the fuck this be in my recommend video

    • @moondarck
      @moondarck 7 ปีที่แล้ว +5

      All I did was watch one soldering video, now my recommended page is full of videos like this... Damn that new youtube algorithm

    • @terangsoco136
      @terangsoco136 7 ปีที่แล้ว

      danish

    • @brianr987
      @brianr987 7 ปีที่แล้ว

      Terang Soco limeys catching up on how to handle high voltage cables.

    • @brianr987
      @brianr987 7 ปีที่แล้ว +1

      He's dressed up in a cute little suit to perform this exercise. In the US, the electricians would have done this in 2 minutes.

    • @coldbloodedfasist5536
      @coldbloodedfasist5536 7 ปีที่แล้ว +3

      go learn english!

  • @TAllyn-qr3io
    @TAllyn-qr3io 2 ปีที่แล้ว

    I was a 52E in the Army and doing this was part of the duty description. This is slow, tedious work and made even worse, far worse in the field. Great video guys! 🤙

  • @electrician240
    @electrician240 3 ปีที่แล้ว +2

    I love all things electrical with a passion and this here is an artwork of beauty! Well done and congrats.

  • @Voima
    @Voima 8 ปีที่แล้ว +41

    I've got these as my speaker cables

    • @pmgodfrey
      @pmgodfrey 8 ปีที่แล้ว +5

      +Voima
      More importantly, did you use cable elevators to elevate the cables off the ground as not to cause interference and static buildup? Did you break in your wires for 96 hours? Are you using oxygen free copper? lol

    • @BenCos2018
      @BenCos2018 4 ปีที่แล้ว +1

      @@pmgodfrey lol

  • @obviouslytwo4u
    @obviouslytwo4u 3 ปีที่แล้ว +4

    Obviously this will be a lot different when you're doing it on the field.
    you will want to make sure you have all the correct heat shrinks on before you make the first Connection.

  • @1xtechnologiescablecompany272
    @1xtechnologiescablecompany272 4 ปีที่แล้ว +1

    Great Video Thorne Derrick! We are going to embed on an informational post for our 250 KCMIL through 6000 KCMIL High Voltage Cable. Good info!

  • @duaneross9271
    @duaneross9271 4 ปีที่แล้ว

    I wished I would have went to the Johnny Horizon school for doing some gnarly shrink wrap jobs. Awesome job!!

  • @Backyardmech1
    @Backyardmech1 7 ปีที่แล้ว +94

    Imagine completing a splice and realizing you forgot to slide the shrink wrap on beforehand.

    • @Karanar
      @Karanar 7 ปีที่แล้ว +4

      if you are doing it without reading the procedure, then sure :p most people don't like to read procedures, so they usually fuck up.

    • @Backyardmech1
      @Backyardmech1 7 ปีที่แล้ว +8

      Procedures are for newbs when you've been doing this stuff for years. Personally I would like a second person with me doing this double checking every step as we go.

    • @mdrazi2486
      @mdrazi2486 7 ปีที่แล้ว

      Md Razi Shaikh

    • @AtlasReburdened
      @AtlasReburdened 7 ปีที่แล้ว +2

      "Procedures are for newbs", he said, knowing nothing of science or epistemology.

    • @AtlasReburdened
      @AtlasReburdened 7 ปีที่แล้ว +1

      Who, me?

  • @KbKabbo23
    @KbKabbo23 5 ปีที่แล้ว +20

    Here we are again by youtube recommendation.

  • @forgame9403
    @forgame9403 2 ปีที่แล้ว

    super amazing after 7 years!

  • @josephcronin4209
    @josephcronin4209 3 ปีที่แล้ว

    Love this video most I work with was 440VAC . Be safe out there .

  • @AudiRallyTeam
    @AudiRallyTeam 7 ปีที่แล้ว +20

    I just realized, I watched this for 19 minutes..

  • @electronicsNmore
    @electronicsNmore 7 ปีที่แล้ว +30

    Excellent video!

    • @albertomunozgomez5570
      @albertomunozgomez5570 3 ปีที่แล้ว +2

      mire la miniatura y entre y no pude dejar de mirarlo jajajajajajaja y si es un byuen video

  • @dhirendrapsingh6758
    @dhirendrapsingh6758 2 ปีที่แล้ว +1

    Informative. Useful. Calming. Inspiring. Life-changing. Enjoyable. Heart-warming. Other.

  • @marckymarasigan9541
    @marckymarasigan9541 2 ปีที่แล้ว

    this job is highly skilled its my job at Bechtel Intl. terminator and splicer of medium voltage XLPE and EPT up to 33kv and also tapping of rubberized tape 33kv 17 kv 11kv 5 kv in omam and Africa.

  • @amigator7789
    @amigator7789 8 ปีที่แล้ว +7

    Here hold my beer.... I can solder it together with my mighty Yihua.

  • @MartinPaoloni
    @MartinPaoloni 8 ปีที่แล้ว +6

    I should to that to my speaker wires. That would make them cat-proof, I hope.

  • @repairitdontreplaceit
    @repairitdontreplaceit 4 ปีที่แล้ว +1

    i used to do this with cotton tape and linsead oil and lead plumbing joints 30 years ago

  • @sparkequinox
    @sparkequinox 2 ปีที่แล้ว +1

    Interesting to see heatshrink used. In London EDF (UK Power) Networks they encased everything in a potted resin.

  • @sergiovw1500
    @sergiovw1500 7 ปีที่แล้ว +15

    watch out men, there are two snipers

    • @MrIzo56
      @MrIzo56 5 ปีที่แล้ว +3

      @Eìon O'hInneirghe You must be really fun at parties bud.

    • @daverhodes382
      @daverhodes382 4 ปีที่แล้ว

      @Eìon O'hInneirghe
      Tosser.

  • @chandanindalkar
    @chandanindalkar 5 ปีที่แล้ว +4

    I don't know man... Seems like a Lotta work

  • @ansientwun
    @ansientwun 4 ปีที่แล้ว +1

    Not something I'd want to be doing in a hole in Minnesota in January during a nice sleet storm. Gives me goose bumps just thinking about it.

  • @barbarakowalska5000
    @barbarakowalska5000 3 ปีที่แล้ว +2

    Mufa zrobiona idealnie!
    Piekne wykonanie!
    Pozdrawiam :)

  • @yasirhamza7986
    @yasirhamza7986 7 ปีที่แล้ว +3

    GOOD VIDEO....LEARNT ALOT

  • @DoRC
    @DoRC 7 ปีที่แล้ว +7

    What an amazingly intricate process. I never would have imagined. I wonder how much one of these splice kits costs.

    • @rearspeaker6364
      @rearspeaker6364 2 ปีที่แล้ว

      1 new Toyota Camary.

    • @mrfrenzy.
      @mrfrenzy. 9 หลายเดือนก่อน

      a joining kit for 12kV cables with 3 phases costs about €400. For 24kV cable it's about €1000.

  • @claudiogeronimo7085
    @claudiogeronimo7085 2 ปีที่แล้ว +2

    Excelente trabajo me encantó me hace acordar hacé años atrás que también hise esos empalme de medía tención en los pórticos del puerto de exolgan en Buenos Aires lleva tiempo paciencia y muchas concentración y atención a lo que se está haciendo ya que es un trabajo de precisión y muy peligroso por las cargas que manejan eso cables y sobre todo con la humedad felicitaciones colega

  • @inspector9290
    @inspector9290 4 ปีที่แล้ว +1

    10/10
    Nice professional work.

  • @1uHAX
    @1uHAX 3 ปีที่แล้ว +23

    как всегда: хуяк, и забыл одеть последнюю термоусадку :D

  • @gsilva220
    @gsilva220 4 ปีที่แล้ว +22

    "All traces of carbon must be removed from the insulation"
    *Blasts yellow flamed burner at the insulation, filling it with soot*

    • @smith549371
      @smith549371 3 ปีที่แล้ว +1

      Why doesn't he use a heat gun?

    • @mk23909
      @mk23909 3 ปีที่แล้ว

      @@smith549371 Maybe there is a power failure.

    • @smith549371
      @smith549371 3 ปีที่แล้ว

      @@mk23909 you can use gas heat guns also, theres no need for flame. Most people would consider a flame unprofessional or amateur.

    • @mk23909
      @mk23909 3 ปีที่แล้ว

      @@smith549371😉

    • @fraser827
      @fraser827 2 ปีที่แล้ว +1

      Open flame torches are most commonly used actually and standard practice in the trade. Much quicker and far easier, but yes U could use a heat gun if U really wanted too

  • @Mike_Crone
    @Mike_Crone 7 ปีที่แล้ว +1

    THIS IS ART!

  • @Mark-ox1ki
    @Mark-ox1ki ปีที่แล้ว

    Work of art , to think guys are doing this in a hole in the ground in all weather, amazing 👏👏👏

  • @steves2694
    @steves2694 2 ปีที่แล้ว +1

    I'm glad they included part 7756-WQ-4411 electrical cleaning tissues. My kit was missing them. Awaiting shipment from customer service.

  • @nlo114
    @nlo114 9 ปีที่แล้ว +11

    Why is the copper screening braid double-layered over half the joint, then open-wound over the remainder? Did they run out of braid half way through the job?

    • @shrinkpolymersystemsuk
      @shrinkpolymersystemsuk 9 ปีที่แล้ว +2

      nlo114 Hi, no nothing ran out. The mesh is to pick up surface current and as long as its in contact with the insulation/conductive tubes, the semi-con layer on the cores and back to earth, that is all that is needed. Has been tested too so we know its fine.

    • @apdjwivjekdif
      @apdjwivjekdif 8 ปีที่แล้ว +2

      If is done that way for conduct the transceiver calibration support to its optimum performance.

  • @IvAzure
    @IvAzure 4 ปีที่แล้ว +19

    Изолента не синяя, работать не будет

  • @kwinzman
    @kwinzman 3 ปีที่แล้ว

    This will come handy next time I repair a 11kV 3 Core XLPE & EPR High Voltage Cable.

  • @FaberCollege
    @FaberCollege 2 ปีที่แล้ว

    One electrifying performance.

  • @luellegabales7129
    @luellegabales7129 4 ปีที่แล้ว +11

    no one:
    not a single soul:
    yt algorithm during pandemic: wanna watch this guy join 2 wires?

  • @MS-ug3gm
    @MS-ug3gm 4 ปีที่แล้ว +9

    WAGO do something, please! ;)

  • @buzzlightyear2490
    @buzzlightyear2490 2 ปีที่แล้ว

    Must admit that was great to watch

  • @MikeBaxterABC
    @MikeBaxterABC 3 ปีที่แล้ว

    One time i got an almost brand new 50 foot extension cord someone put out for garbage. It had been cut (with a lawnmore I'd guesss) and repaired. The guy stripped the insularion, and wound the wires together really tight but left them all bare and just wrapped it with scotch tape, then duct tape. he DIDN'T insulate them from each other!.
    He obviously didn't watch this video, like we all did! :) LOL

  • @AnilKumar-lt4uk
    @AnilKumar-lt4uk 4 ปีที่แล้ว +4

    Nice work at starting video but in last I'm confused how can we put two round heat shrink tube in already jointed wires 🤣🤣🤣

    • @michaelstewart9308
      @michaelstewart9308 3 ปีที่แล้ว

      He put them on at the very beginning

    • @AnilKumar-lt4uk
      @AnilKumar-lt4uk 3 ปีที่แล้ว

      @@michaelstewart9308 check his video at beginning

    • @AnilKumar-lt4uk
      @AnilKumar-lt4uk 3 ปีที่แล้ว

      @@michaelstewart9308 check at 17:43 he slide tube from sides because it open from sides if it is in field it would be a great mistake

  • @jimdandy7772
    @jimdandy7772 4 ปีที่แล้ว +5

    This is exactly what I did when I tapped into a WestPenn power line to build my underground meth lab.
    Unlimited power at my finger tips

  • @AivoPaas
    @AivoPaas 3 ปีที่แล้ว

    Thanks algorithm, now I know something I'll 1000% never need to know.

  • @STONEDay
    @STONEDay 4 ปีที่แล้ว +1

    Nice joint! Last thing I could read on shrink tube of the joint was "THC" before the speaker said the joint is complete. 😂

    • @bobweiss8682
      @bobweiss8682 3 ปีที่แล้ว

      Well, it isn't a complete joint without any THC....

  • @PrimePhilosophy
    @PrimePhilosophy 5 ปีที่แล้ว +4

    Beeping noise in the background as if this man is performing surgery on a human. Good job Sir!

  • @chandlerb8100
    @chandlerb8100 7 ปีที่แล้ว +5

    I've probably watched this 30 times at least, only because it puts me straight to sleep

  • @franciskalemba2640
    @franciskalemba2640 ปีที่แล้ว

    Am a proud cable jointer

  • @yauwohn
    @yauwohn 4 ปีที่แล้ว +1

    I wished I'd have had one of those sheave tools when I was terminating armoured cables, beats a Stanley knife hands down!!

  • @dg-hughes
    @dg-hughes 8 ปีที่แล้ว +3

    9:44 "...all carbon traces must be removed from the primary insulation" but once he is done of that he marks it with a yellow grease marker.

    • @404_-_Not_-_Found
      @404_-_Not_-_Found 8 ปีที่แล้ว +3

      +David Hughes And shrinks it with a yellow flame that is probably putting soot (Carbon) all over the place...

    • @dkohler5226
      @dkohler5226 8 ปีที่แล้ว +2

      +Toby Sinclair-Bell Good call on the yellow flame, the red mastic should not protrude beyond the first shrinks, it needs a wad of red mastic between the three conductors at each end and the gray silicone tape is not for a pressure seal between layers it's for gap filling, so the last lap seal needs to be the red mastic, and how did he run out of the aluminum gauze and not finish the half lap covering? Oops

    • @hokiepokie333_CicadaMykHyn
      @hokiepokie333_CicadaMykHyn 5 ปีที่แล้ว +1

      It's already over engineered by the insurance company... Because writing up new SOP's out of blood, tends to cause more issues than doing it right the first time.

  • @hokiepokie333_CicadaMykHyn
    @hokiepokie333_CicadaMykHyn 5 ปีที่แล้ว +5

    Next on How It's Made...
    You mom and dad's vibrator, power supply cable.

  • @thehandyman7537
    @thehandyman7537 4 ปีที่แล้ว

    That's the right size of cables that i need for my headphones amigo

  • @dkohler5226
    @dkohler5226 8 ปีที่แล้ว

    +Toby Sinclair-Bell Good call on the yellow flame, the red mastic should not protrude beyond the first shrinks, it needs a wad of red mastic between the three conductors at each end and the gray silicone tape is not for a pressure seal between layers it's for gap filling, so the last lap seal needs to be the red mastic, and how did he run out of the aluminum gauze and not finish the half lap covering? Oops

  • @ronmerkus5941
    @ronmerkus5941 5 ปีที่แล้ว +4

    Next up Electro booms does a 11kv splice lol

  • @johnbarham7718
    @johnbarham7718 4 ปีที่แล้ว +6

    its all very well in a lab, but as I know, its very different outside in a trench.

  • @blackskullz9770
    @blackskullz9770 2 ปีที่แล้ว

    The bgm and the voice make this video look more intense it's like a doctor doing surgery😁
    Btw I love it

  • @raneeshchandran8369
    @raneeshchandran8369 3 ปีที่แล้ว +1

    I am also 220, 400kV jointer. Excellent work. Good teaching

  • @cliveramsbotty6077
    @cliveramsbotty6077 4 ปีที่แล้ว +3

    did someone leave a tap running in the background

  • @carreonj74
    @carreonj74 8 ปีที่แล้ว +5

    That's perfect for speaker cable. Lol

  • @asifmalik7430
    @asifmalik7430 5 ปีที่แล้ว

    Perfect joined termination

  • @misterguts
    @misterguts 3 ปีที่แล้ว

    OK, this looks easy. No problem. I am now ready to splice high voltage cable.

  • @badrobot2765
    @badrobot2765 7 ปีที่แล้ว +12

    Doing his in the field not quite so easy lol

    • @Karanar
      @Karanar 7 ปีที่แล้ว +3

      I did something similar in a shack in Trinidad and Tobago. Dirt floors and no lights :P

  • @user-nv3gc2nv2r
    @user-nv3gc2nv2r 4 ปีที่แล้ว +8

    и нахуя я это в 2 часа ночи смотрю.

    • @MARK2580
      @MARK2580 3 ปีที่แล้ว

      А я почти в 5 утра )

  • @kimfrancissagun3807
    @kimfrancissagun3807 7 ปีที่แล้ว

    Nice presentation sir... In real that is not easy as we saw.. Here in KSA we are now using 3X500mm2Al for 15kV. Way bigger. So we need efforts in doing cable joints... Thanks for the additional knowledge☺

    • @bradyates7320
      @bradyates7320 ปีที่แล้ว

      500mm😳 the biggest I’ve worked with is 300mm on EHV, and that was a work out

  • @johnbarron4265
    @johnbarron4265 3 ปีที่แล้ว

    Wow! These guys must get paid big bucks! That's some complicated work!