Kelan pwedeng tanggalin ang porma | Terms, definition, types, checking of Formworks

แชร์
ฝัง
  • เผยแพร่เมื่อ 3 ต.ค. 2024
  • Terms, definition, types, checking of Formworks
    Summary of Striking of Forms:
    1. Horizontal forms - min 1 day
    2. Vertical forms and props or shoring ay meron magkaibang required na days before removal.
    -Watch the video for the detailed information
    Please like share and subscribe:
    Pinoy Inhinyero:
    www.youtube.co...
    Kristine Joy Aves:
    www.youtube.co...
    For queries and other concerns, Please like and follow our FB page:
    / keventin
    For business proposals:
    gmail: engrcivil16.7.2019@gmail.com
    Salamat Hanggang sa muli. Bahbye!!!

ความคิดเห็น • 55

  • @engrandro1023
    @engrandro1023 3 ปีที่แล้ว +1

    Nice vid PI! Additional points for the props, is it also helps to bear construction loads/ or ung loads from materials, equipments etc that are needed to be stacked on slabs during construction process! ✌🏻
    napaka laking tulong nito for the fresh engrs. More power PI!

  • @A2kScaffolding-wj1pp
    @A2kScaffolding-wj1pp ปีที่แล้ว

    Importante talaga ang may alam sa formworks.. good job for giving education!

  • @valdezmikhaill.2082
    @valdezmikhaill.2082 3 ปีที่แล้ว

    Very helpful po Engr. as Engineering Student kahit papano may ideya na ako for the future

  • @ryehlb
    @ryehlb 2 ปีที่แล้ว

    Very informative and helpful. Thank you, Engineer.

  • @hihello-df6xh
    @hihello-df6xh ปีที่แล้ว

    Thank you sir! Big help. Bagong formworks engineer here

  • @haydendionsay8283
    @haydendionsay8283 3 ปีที่แล้ว

    Thank you. So informative video. It helps me a lot in my QA/QC project supervision.

    • @acechannelinternational8120
      @acechannelinternational8120 2 ปีที่แล้ว

      Ano po ang exact descriptive title ninyo po? Ang may 100% supervision plus documentation na work, ano kayang magandang title? O pasok na ang work na ito sa QA/QC Engr. Nang bumagsak ang isang grocery building dahil sa lindol, maraming nakitang mali sa construction at isinisi sa kakulangan ng SUPERVISION.

  • @reymartrazo1623
    @reymartrazo1623 3 ปีที่แล้ว

    Maraming salamat sa kaalaman, Sir! Sana sa susunod paano naman po mag check ng mga rebars ng mga biga, slab at column 😁

  • @ivannicoiidevelles5942
    @ivannicoiidevelles5942 8 หลายเดือนก่อน

    Thank you, may mga natutunan ako sa video mo.

  • @patrickjuangco8097
    @patrickjuangco8097 3 ปีที่แล้ว +2

    sir gawa ka naman ng vids kung pano magbuhos ng may duktong sa biga,poste at slab.salamat

  • @dennispascual209
    @dennispascual209 2 ปีที่แล้ว

    Sir, kung gagamit ng metal deck paano po ang paglatag ng mga support at gaano katagal bago tanggalin? Maraming salamat sa mga kaalaman naituturo mo sa amin at Mabuhay ka!

  • @engr.jayannce4617
    @engr.jayannce4617 3 ปีที่แล้ว +1

    sana po gawa po kayo kung papaano po yung structural inspection ng isang building...

  • @torchmongol3079
    @torchmongol3079 3 ปีที่แล้ว

    Thank you Engr. more power to you, God bless

  • @venicemolomolo7264
    @venicemolomolo7264 3 ปีที่แล้ว +1

    Engr. please upload videos about estimate of beam, roof, trusses,column and other structural. Thank you po.

  • @jamvibes3550
    @jamvibes3550 3 ปีที่แล้ว

    Thank you po. Sana po mag upload kayo nang contents tungkol sa standards nang parts. Thank you po

  • @apollo19970
    @apollo19970 3 ปีที่แล้ว

    Maraming salamat sa dagdag kaalaman...

  • @gineertv7192
    @gineertv7192 3 ปีที่แล้ว

    Nice content brother👷👷 godless and more videos po

  • @bernabelumantas1174
    @bernabelumantas1174 3 ปีที่แล้ว

    salamat sir god bless.f pwedi sir video na mag compute ng cutting length sa lateral tie at pag distribute sa sa tie.tnx

  • @medjalyn3293
    @medjalyn3293 2 ปีที่แล้ว +1

    Engnr. Nakakakatulong ba na unahin ang asintada ng CHB 6" sa ilalim ng biga,i mean lagyan ng pader gamit ay 6" na CHB bago magpa slab sa 2nd floor? medyo exposed kasi ang beam ko ng halos 3yrs tapos parcial beam pa kaya ngayon ko palang palalagyan ng slab.sana po mapayuhan nyo ako salamat po!

  • @zurcocirne2284
    @zurcocirne2284 ปีที่แล้ว

    Wow thank you sir:)

  • @bisayangjuan
    @bisayangjuan 3 ปีที่แล้ว

    dagdag kaalaman PI. salamat.

  • @eyzaboo1064
    @eyzaboo1064 ปีที่แล้ว

    Slamat po aa info❤

  • @inhinyerongsibil6383
    @inhinyerongsibil6383 3 ปีที่แล้ว

    nice, very informative

  • @engr.jayannce4617
    @engr.jayannce4617 3 ปีที่แล้ว +1

    related po ba kayo ni Arch. Austria na isa ring TH-camr?

  • @jasonhchx8006
    @jasonhchx8006 3 ปีที่แล้ว

    Egnr. Maraming salamat sa info. Tanong ko lng sir kung pwede nba mg asentada ng hollow blocks sa 2nd floor 7days after mg buhos ng slab at beam?ng hnd tinatangal yung mga frameworks ng slab at beam. Sana maka reply ka sir. Salamat in advance.

  • @jhoeldejesus8102
    @jhoeldejesus8102 3 ปีที่แล้ว +1

    Engr thanks sa vdeo very informative. Tanong lng engr After ng buhos sa balcony slab (53sqm) ilang araw pwede makapag layout ng chb (1m height)? Thanks

    • @pinoyinhinyero8276
      @pinoyinhinyero8276  3 ปีที่แล้ว +2

      hi jhoel, kung layout lang naman 24 hrs pwede mo ng ilayout pero para mas safe antayin mo un min 3 days para malagay un CHB.

    • @jhoeldejesus8102
      @jhoeldejesus8102 3 ปีที่แล้ว

      @@pinoyinhinyero8276 maraming salamat po..

  • @markanthonyfernandez4940
    @markanthonyfernandez4940 2 ปีที่แล้ว

    Engineer ask ko lang kaya ba ng 2 poste yun 4.4 meters space 2 poste para sa slab?? Taas nun slab ay terrace,nag ka mali kasi ng buhos at lagay ng poste maramingvsalamat

  • @rasalih9200
    @rasalih9200 3 ปีที่แล้ว

    Thank you engr

  • @peterdelcano5090
    @peterdelcano5090 3 ปีที่แล้ว

    Paano ung process ng roofdeck storm drainage? Tnx

  • @acechannelinternational8120
    @acechannelinternational8120 2 ปีที่แล้ว

    Engr, ano ang masama kung after 28 days tanggalin ang lahat ng forms? Bawal ba? O ano ang mga disadvantages? Thanks sa sagot.

    • @likha360
      @likha360 ปีที่แล้ว +1

      kailangan tanggalin for curing. curing process requires dilig2 ng tubig. need ng sapat na moisture yung concrete para ma achieve ang strength.

  • @songsandmelodies2.020
    @songsandmelodies2.020 2 ปีที่แล้ว

    Sir, sana po mapansin mo po itong comment ko may bahay po akong ipapagawa 6x6 ang sukat niya 9 po lahat ng poste pati sa gitna ang tanong ko po ok lang ba gumamit ng 6 na 12mm sa posti niya naka slab po pala yung plan ko sir slab lang po walang room sa taas ..maraming salamat po

  • @tinderochitong6676
    @tinderochitong6676 2 ปีที่แล้ว

    Askin yero ang salo at kawayan ang tukod ika 5 days n cya ngaun

  • @robertarodriguez2279
    @robertarodriguez2279 3 ปีที่แล้ว

    Sir, when pwde na apakan ang suspended slabs from the day binuhosan?
    thnx po!

    • @pinoyinhinyero8276
      @pinoyinhinyero8276  3 ปีที่แล้ว

      24 hrs po pwede na. wag ka lang maglagay ng mabibigat gaya ng mga scaffolding sa ibabaw nito at wag tanggalin ang mga staging sa ilalim.

  • @olanpereyra2898
    @olanpereyra2898 3 ปีที่แล้ว

    2 thumbs up lodi 👍👍

  • @emersonmilagrosa7779
    @emersonmilagrosa7779 3 ปีที่แล้ว

    sir kpg shoring nlng yung ntitira sa slab or beam wla n yung props.. allowed nrin mg continue ng formworks sa next suspended slab? thanks

    • @pinoyinhinyero8276
      @pinoyinhinyero8276  3 ปีที่แล้ว +1

      depende to emerson sa kung ganu na katagal ang curing ng slab mo. but i recommend sama mo pa din props mo for safety purpose

  • @otse3329
    @otse3329 2 ปีที่แล้ว

    Ask lng po ok lng ba gamitin ang republic cement sa poste o column sir?

    • @pinoyinhinyero8276
      @pinoyinhinyero8276  2 ปีที่แล้ว

      kahit anun brand po and recommended po ang type 1-P

    • @otse3329
      @otse3329 2 ปีที่แล้ว

      @@pinoyinhinyero8276 ano yang type1-p sir?

  • @severinopermejo8616
    @severinopermejo8616 2 ปีที่แล้ว

    Ganon po ang sukat Ng laki Ng mabubuhusan SA mixture na 1 2 3 na halo

    • @pinoyinhinyero8276
      @pinoyinhinyero8276  2 ปีที่แล้ว

      depende po sa volume and weight ng mix. mix ratio po un 1:2:3.

  • @norshebabalindong2152
    @norshebabalindong2152 3 ปีที่แล้ว

    Is it okay to vibrate beams 2 or 3hours after being poured with concrete mixture? Just by hammering the braces lightly? Is it okay? Okay lang po ba?

    • @pinoyinhinyero8276
      @pinoyinhinyero8276  3 ปีที่แล้ว +1

      di po norsheba. kasi maaring nacucure or matigas na un loob and kapag vinibrate mo pa ay madisturbed pa ang concrete

    • @norshebabalindong2152
      @norshebabalindong2152 3 ปีที่แล้ว

      @@pinoyinhinyero8276 yung ginawa po nila is parang slightly taping lang sa mga braces nang formworks. Kasi po parang umuulan that time na nagbubuhos yung mga tao po. Ano po suggestion niyo po?

    • @pinoyinhinyero8276
      @pinoyinhinyero8276  3 ปีที่แล้ว

      if ngawa nio na, ang gawin nio is pagktanggal ng forms icheck nio for any cracks or ampaw or any abnormalities sa size and surface ng concrete. but di recommended un ginawa nio kasi 2 to 3 hrs na ang nakalipas.

    • @norshebabalindong2152
      @norshebabalindong2152 3 ปีที่แล้ว

      @@pinoyinhinyero8276 if may mga cracks po ano po maganda gawin? Plano po namin na tanggalin yung formworks sa sides only tapos e cure nang tubig po.
      Yung scaffolding at porma niya sa baba is di po tatangalin. Okay lang po ba?

    • @pinoyinhinyero8276
      @pinoyinhinyero8276  3 ปีที่แล้ว +1

      if may cracks, kelangan ievaluate kung ganu kalalim to for proper solution. oo, aun un recommended un gilid muna then un sa ilalim tanggalin nio after 14 to 21 days then tuluy tuloy ang curing or un pagbabasa ng tubig min ng 7 days

  • @olanpereyra2898
    @olanpereyra2898 3 ปีที่แล้ว

    lodi, baka my tanggapan jan s singapore batching operator? pasok mo naman ako lodi ☺

    • @pinoyinhinyero8276
      @pinoyinhinyero8276  3 ปีที่แล้ว

      hi olan. daming opening dito ngayon, kaya lang prioritize ang mga local citizen then di nakakapasok basta basta ngayon kay singapore

    • @olanpereyra2898
      @olanpereyra2898 3 ปีที่แล้ว

      thank u s info engr. kevin more power to your youtube channel... ilove concrete👌 stay safe