I FOUND A 'GLITCH' IN REVIT: Draw order matters - Go Figure!

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 ส.ค. 2024
  • Apparently in Revit, you can't draw any NEW WALLS before you draw the EXISTING WALLS. They interfere. The Existing plan will show gaps where the walls overlap even though technically the new walls don't even exist yet.
    Yep.. it's a glitch. But there is a way to fix it if it happens to you in your project. This Revit Tip will explain.
    -------
    If your company needs BIM/Revit Assistance.. you can get help without hiring an in-house BIM Manager.
    A virtual BIM Manager (me) means you and your team can get immediate help (and ongoing assistance) without dealing with the overhead of hiring someone full time.
    Check out my website for more details:
    www.virtualBIMm...

ความคิดเห็น • 10

  • @anthonyjohnston1618
    @anthonyjohnston1618 ปีที่แล้ว

    Not exactly what I thought but still learned alot of new stuff, thanks for your time Mike!

  • @okzzvil7617
    @okzzvil7617 ปีที่แล้ว

    Thank you Mike.

  • @popop8318
    @popop8318 ปีที่แล้ว

    I do not see that as a glitch. Since this is predictable.
    Draw order is recorded from the 1st click to the last click of your project. I should say from the 1st vertex to the last vertex.
    Visually, we are creating a building, but on paper we are creating a math equation. And in math we have priority. That's why draw order is important when a geometry affect another geometry. (Which happen A LOT in revit). And that's why we have to cut and paste back in place our ''existing wall'' over the new construction wall to reset the draw order.
    Same thing will happen with all 3D modeling software that i know.
    When using 3D software, the order of drawing is much more important compare to 2D (2.5D) software like Revit.
    But even in a 2D Cad drawing, each vertex are indexed.
    Even if changing the index order randomly change nothing visually on your screen, the index is needed to build the ''save file'' itself.
    But i think it's nice to understand what is happening in the background.
    The index start to effect the final result of your sketch mostly when a geometry will modify, in any way, another geometry.
    In revit, when you add 2 vertex, you add much more then just 2 (x, y, z) positions. 2 simples vertex can contain pages and pages of information / parameter.
    Thus, when you manually add 2 vertex on the screen (Wall simple line), Revit generate from 8 to nearly infinite number of vertex depending on how many layer you add in your material list.
    I've never check what is the maximum number of layer we can create lol
    You also need to respect draw order when using Model in Place for example.
    The ''Phase created'' function as not been made to recreate a new draw order. It's just for visual effect.

  • @WoodyRe
    @WoodyRe ปีที่แล้ว

    Great tip & trick, more like these kind of videos hopefully. Thanks Mike.

  • @SUL-KSA
    @SUL-KSA ปีที่แล้ว

    It would be great if you make a tutorial about this, a complete small building modeling in Revit.

  • @myscape8843
    @myscape8843 ปีที่แล้ว

    A SMALL PROJECT, HOW TO USE PLUMBING USING ARCHITECTURAL TEMPLATE?

  • @abdulmajeeda9424
    @abdulmajeeda9424 2 ปีที่แล้ว +1

    Great

  • @kabirthemystictheotherone8486
    @kabirthemystictheotherone8486 ปีที่แล้ว

    at 13:40 you say "grab your existing walls, cut'em out of the plan and paste them back in". Shouldn't it be 'grab your new walls.." ?

  • @hizacaine
    @hizacaine 2 ปีที่แล้ว +1

    This glitch happens regardless of the drawing order.