The Dredging of a lake and processing of the silt removed.
ฝัง
- เผยแพร่เมื่อ 2 ม.ค. 2025
- This was a project undertaken by CSG to remove 68,000 m3 of silt from a recreational lake. The silt was dewatered to cake at 25% dry matter and over 7,000 tonnes of cake was taken off site.